EN ES
Louisiana · PSI

Louisiana Heavy Construction

A step-by-step guide to the Louisiana Heavy Construction exam: the bulletin's key facts, the topics, reference books, sample questions with answers and a simple plan.

30 questions 75 minutes 70% to pass 7 topics 2:30 per question Open book 198 questions in pool
Full practice exam $4.95
  • 30 questions on a 75-minute clock, like the real exam
  • Every answer explained; code questions cite the book and section so you can find it in your own copy
  • A fresh draw from 198 questions each attempt
Try 10 free questions
Study Course $59.95/month
  • Unlimited full exams, topic quizzes and study briefs
  • Cancel anytime
See the study course
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
On this page

Louisiana Heavy Construction Exam: Step-by-Step Study Guide

Preparing for the Louisiana Heavy Construction exam is easier one step at a time. This guide starts with the key facts from the official bulletin, then covers the topics on the exam, the reference books, sample questions with answers, and a simple way to prepare. PSI gives the exam.

Louisiana Heavy Construction Exam Overview

Start with the facts. Here's what the official bulletin says:

Questions 30 questions
Time limit 75 minutes
Passing score 21 correct answers out of 30 scored questions
Books in the exam room Open book

On exam day

  • Answers may be based on later editions of the references except for Code books, for which only the listed edition is used, and the exam may also include questions on trade knowledge or general industry practices. Candidates bring their own references. References may be highlighted, underlined, annotated and indexed before the exam session, but may not be written in during the exam. Only permanent tabs are allowed; temporary tabs such as Post-It notes must be removed, and no additional papers (loose or attached) may be brought in with the references.
  • References may be highlighted, underlined, annotated and indexed before the exam but not written in during the exam, and only permanent tabs may be used.

References you may bring

  • Code of Federal Regulations - 29 CFR Part 1926 (OSHA), with latest available amendments
  • Code of Federal Regulations - 29 CFR Part 1926 Selections by PSI, with latest available amendments
  • Storm Water Management for Construction Activities (1992)
  • Pipe and Excavation Contracting, Dave Roberts (2011)
  • Design and Control of Concrete Mixtures, Steven H. Kosmatka, William C. Panarese (15th or 16th Edition, 2016)
  • Placing Reinforcing Bars, Recommended Practices (9th edition, 2011 or later printing)
  • Erectors' Manual – Standards and Guidelines for the Erection of PreCast Concrete Products (2nd Edition, 1999)
  • Construction Planning, Equipment, and Methods, R.L. Peurifoy (8th Edition)

Source: HEAVY CONSTRUCTION EXAMINATION. Check the bulletin before test day: fees and rules can change.

Topics on the Louisiana Heavy Construction Exam

Next, the content. The official content outline has 7 topics:

Topic Questions Share of the exam
Erosion and Sedimentation Control 2 7%
OSHA Safety 6 20%
Sitework 5 17%
Concrete 6 20%
Metals Including Concrete Reinforcement 3 10%
Pipes 4 13%
Pre-Cast and Pre-Stressed Concrete Erecting 4 13%

A Simple Plan to Prepare for the Louisiana Heavy Construction Exam

Step one is the books. This is an open-book exam, so the references on the bulletin's list are what you'll work from, while you study and in the exam room. Get the editions the bulletin names.

Step two is learning your way around them. Go through each book's table of contents and index until you know where the major subjects are. You don't need to memorize the books. You need to find things in them.

Step three is marking them up. Highlight the sections you use most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.

Step four is timed practice. Our practice exams run on a clock, so you get used to the real exam's pace: about 2 minutes 30 seconds per question.

Along the way, give the most time to the biggest topics. OSHA Safety and Concrete make up 40% of the exam.

The last step is consistency. Keep practicing until you pass several practice exams in a row. That's the signal you're ready.

Reference Books for the Louisiana Heavy Construction Exam

The bulletin lists eight references used to prepare the exam, all allowed in the test room, with the two 29 CFR Part 1926 versions listed as alternatives (one OR the other).

Where to get them:

On Test Day

Go through the exam at a steady pace. On your first pass, answer the questions you know and bookmark the ones you don't. Every exam lets you come back to bookmarked questions, but some lock the ones you've seen once you take a break, so finish your bookmarks first.

On your second pass, return to your bookmarks one at a time. You have 75 minutes for 30 questions, which is about 2 minutes 30 seconds per question, so keep moving and don't let one question hold you up. Before you finish, answer anything you skipped. A blank can't earn a point.

Study Tips

There's no hidden pattern in the answer key. If you've picked "A" four times in a row, the fifth answer can still be "A." Judge each question on its own and ignore the letter sequence.

A little anxiety before an exam is completely normal — acknowledge it instead of fighting it. If you feel yourself spiraling on a question, pause and take a few slow breaths to reset. If your test center allows a short break, use it; just remember the clock usually keeps running.

Every exam you take will be different from the last. New questions, new order, but always based on the exam bulletin in terms of topics, questions and time.

Don't let the clock rattle you. It's easy to feel overwhelmed when facing a page full of questions, a racing mind, and a ticking clock. Stay calm and stick to your planned pace. If you've been monitoring your progress consistently, you'll have enough time to finish. Even if the final minutes feel rushed, as long as you have only as many questions remaining as you should at that point, you're exactly where you need to be.

Sample Louisiana Heavy Construction Practice Questions

Here are a few questions from our practice question bank, each with its answer and reference.

Sample 1 — Pipes

Question: A designer asks you about using CPVC pipe in a water distribution system where metal pipe is unsuitable. At room temperature, CPVC water distribution pipe carries what pressure rating?

  • A. 315 psi
  • B. 400 psi
  • C. 200 psi
  • D. 160 psi

Correct Answer: B

Per Pipe and Excavation Contracting, Chapter 11 (Page 301), CPVC in water distribution systems has a 400 psi pressure rating at room temperature and 100 psi at 180 degrees F. The 160 psi figure is the top of the polyethylene range and 315 psi is the maximum rating available for PVC.

Reference: Pipe and Excavation Contracting, Page 301

Sample 2 — Pre-Cast and Pre-Stressed Concrete Erecting

Question: When pipe braces are used as temporary bracing for precast concrete members, what three parameters shall be followed per the bracing manufacturer's specifications?

  • A. Diameter, thread count, and torque
  • B. Load, temperature, and duration
  • C. Length, diameter, and embedment depth
  • D. Load, length, and inclined angle

Correct Answer: D

Pipe braces shall be used as indicated in the bracing manufacturer's specifications regarding load, length and inclined angle.

Reference: PCI Erectors' Manual, Division 2, Section 2.3.2 Description of Methods

Sample 3 — Metals Including Concrete Reinforcement

Question: Lowering top bars or raising bottom bars by ½ inch more than specified in a 6-inch-deep slab could reduce its load carrying capacity by what amount?

  • A. 20 percent
  • B. 5 percent
  • C. 15 percent
  • D. 10 percent

Correct Answer: A

Lowering the top bars or raising the bottom bars by ½ inch more than specified in a 6-inch deep slab could reduce its load carrying capacity by 20 percent, demonstrating the critical importance of proper bar positioning.

Reference: Placing Reinforcing Bars (10th ed.), General Principles for Placing, Splicing and Tying Reinforcing Bars, Chapter 11

Sample 4 — Erosion and Sedimentation Control

Question: You are preparing the storm water pollution prevention plan for a highway embankment project. At one common drainage location, 14 acres of upstream drainage area will be disturbed at one time, and a sediment basin is attainable at that location. What is the minimum storage volume the basin must provide?

  • A. 43,200 cubic feet
  • B. 36,000 cubic feet
  • C. 50,400 cubic feet
  • D. 57,600 cubic feet

Correct Answer: C

The EPA Construction General Permit requires a sediment basin providing at least 3,600 cubic feet of storage for every acre drained where more than 10 disturbed acres drain to a common location. 14 acres x 3,600 cf/acre = 50,400 cubic feet. (Storm Water Management for Construction Activities, Control Selection/Plan Design Phase, Page 8.)

Reference: Storm Water Management for Construction Activities (EPA 833-B-92-001), Page 8

Practicing Online vs. With a PDF

A PDF lets you read questions at your own pace. The real exam runs on a clock. Our practice exams are timed and on a screen, so you practice finding answers with the clock running. Each attempt draws a new set of questions from our bank, and your results show your score by topic, so you always know what to study next.

Your Next Step

Take the free Louisiana Heavy Construction practice exam to see where you stand. Then study the topics that need the most attention, one at a time. For the official rules, read the exam bulletin, and see the licensing board's website.

Frequently Asked Questions

How many questions are on the Louisiana Heavy Construction exam?
The Louisiana Heavy Construction exam contains 30 questions.
What is the passing score for the Louisiana Heavy Construction exam?
You need to answer at least 21 questions correctly, which is 70%, to pass the Louisiana Heavy Construction exam.
How much time do I have to complete the Louisiana Heavy Construction exam?
You are allowed 75 minutes to complete the Louisiana Heavy Construction exam.
Is the Louisiana Heavy Construction exam open book?
Yes, the Louisiana Heavy Construction exam is open book. You are allowed to bring specific approved reference materials into the test room.
What reference materials am I allowed to bring to the Louisiana Heavy Construction exam?
Approved references include the Code of Federal Regulations 29 CFR Part 1926 (OSHA), Storm Water Management for Construction Activities, Pipe and Excavation Contracting, Design and Control of Concrete Mixtures, Placing Reinforcing Bars, Erectors' Manual for PreCast Concrete Products, and Construction Planning, Equipment, and Methods. You are responsible for bringing your own copies to the exam center.
Can I write in my reference books or add notes during the Louisiana Heavy Construction exam?
No, you may not write in your references during the exam. References may be highlighted, underlined, annotated, and indexed before the exam, but any candidate caught writing in references during the exam will have them confiscated and will be reported to the department.
Can I use Post-It notes or loose papers as tabs in my reference books for the Louisiana Heavy Construction exam?
No, temporary tabs such as Post-It notes are not allowed and must be removed before the exam begins. Only permanent tabs are permitted, and no additional loose or attached papers may be brought in with your references.
What topics are covered on the Louisiana Heavy Construction exam?
The exam covers Erosion and Sedimentation Control, OSHA Safety, Sitework, Concrete, Metals Including Concrete Reinforcement, Pipes, and Pre-Cast and Pre-Stressed Concrete Erecting. The exam may also contain questions based on trade knowledge or general industry practices.
Took this practice exam? Tell other candidates how it went.
10 free questions30 min · no account
Start Free Exam