Louisiana Heavy Construction Practice Exam
Free Practice Exam
Test your knowledge with 10 questions from our pool of 20 free questions.
- 10 questions per attempt
- 30 minute time limit
- Unlimited attempts
- A new mix each time
- Instant results
Full Practice Exam
Complete exam simulation matching the real PSI test format.
- 30 questions (same as real exam)
- 75 minute time limit
- 7 topic areas covered
- 198 questions in pool
- Detailed explanations
Texts preferred · 9am–9pm Central
Louisiana Heavy Construction Practice Exam Guide
What's on the exam
Questions per topic, out of 30This practice exam follows the official content outline for the Louisiana Heavy Construction exam: Erosion and Sedimentation Control, OSHA Safety, Sitework, Concrete, Metals Including Concrete Reinforcement, Pipes, Pre-Cast and Pre-Stressed Concrete Erecting.
You can practice two ways. The free practice exam gives you 10 questions per attempt, and you can retake it whenever you like. The full practice exam gives you 30 questions on a 75 minutes clock, with a new draw from our question bank each attempt.
Erosion and Sedimentation Control 2 items
Our study plan for this topic: Storm Water Pollution Prevention Plan (SWPPP) development and required components; Stabilization practices for disturbed areas (temporary and permanent seeding, mulching, geotextiles); Structural sediment control measures (silt fence, sediment trap, sediment basin, earth dike); Sediment basin sizing requirements and drainage area thresholds; NPDES permit compliance: Notice of Intent (NOI) and Notice of Termination (NOT) requirements; Inspection and maintenance procedures for erosion and sediment controls; Site assessment: measuring disturbed area, drainage areas, and runoff coefficient; Final stabilization criteria and permit termination conditions.
OSHA Safety 6 items
Our study plan for this topic: Excavation cave-in protection systems (sloping, benching, shoring, and shields); Confined space entry permits, attendant and entrant duties, and rescue procedures; Fall protection systems (guardrail, safety net, and personal fall arrest systems); Electrical safety and ground-fault protection on construction sites; Fire protection and flammable liquid storage and handling; Underground construction hazards (air monitoring, ventilation, and gassy operations); Personal protective equipment selection, use, and employer payment requirements; Occupational health controls (noise exposure limits, hazardous atmospheres, and permissible exposure limits).
Sitework 5 items
Our study plan for this topic: Earthwork quantity calculation methods (average-end-area, cross-section, mass diagram); Cut and fill volume estimation and earthwork balancing; Soil and rock classification and material properties affecting excavation; Compaction equipment selection and soil compaction methods; Excavation equipment selection and production estimating (dozers, scrapers, excavators, loaders); Hauling equipment productivity and truck fleet balancing; Rock excavation methods (ripping, blasting, drilling) and rippability determination; Site preparation tasks (clearing, grubbing, stripping topsoil, pavement removal).
Concrete 6 items
Our study plan for this topic: Concrete mixture proportioning and water-cementitious materials ratio; Fresh concrete properties: workability, slump, bleeding, and air content; Batching, mixing, transporting, and handling ready-mixed concrete; Subgrade preparation, formwork, and pre-placement requirements; Concrete placing, consolidating, and finishing operations; Curing methods, materials, and duration requirements; Concrete durability: freeze-thaw resistance, sulfate attack, and permeability; Hot and cold weather concreting precautions and mix adjustments.
Metals Including Concrete Reinforcement 3 items
Our study plan for this topic: Reinforcing bar types, grades, and ASTM specifications; Bar identification markings and size designations; Standard hooks, bend shapes, and fabrication tolerances; Concrete cover requirements and placement tolerances; Lap, mechanical, and welded splice types and requirements; Bar supports: types, selection, and placement; Placing sequence for footings, walls, columns, beams, and slabs; Coated reinforcing steel handling, storage, and repair.
Pipes 4 items
Our study plan for this topic: Pipe materials types and selection (copper, PVC, ductile iron, concrete, clay, fiberglass); Pipe sizing classifications and strength designations (ID/OD standards, schedule numbers, SDR ratings); Pipe joints, gaskets, and fittings (roll-over, O-ring, slip, compression gaskets; ells, tees, wyes, couplers); Pipe bedding and trench support requirements; Gravity sewer pipe flow rate factors (pipe diameter, slope/grade, pipe material); Water system pressure, thrust forces, and thrust block design; Pipeline testing methods (air test, water infiltration/exfiltration, mandrel test, visual lamping); Septic system components and drainfield design (septic tanks, distribution boxes, drainfield pipe, seepage pits).
Pre-Cast and Pre-Stressed Concrete Erecting 4 items
Our study plan for this topic: Preconstruction planning and erection sequencing; Crane and hoisting equipment selection and operation; Rigging systems, sling selection, and lifting hardware; Temporary guying, bracing, and stability during erection; Field connections: bolted, welded, grouted, and post-tensioned; Installation procedures for specific member types (columns, beams, wall panels, floor/roof members); Erection tolerances: product, erection, and interface; Safety programs, fall protection, and OSHA compliance.
Sample 1 — OSHA Safety
Question: When testing the atmosphere inside a permit-required confined space before entry, what is the correct order for testing atmospheric hazards?
- A. Toxic gases and vapors, then oxygen content, then combustible gases and vapors
- B. Combustible gases and vapors, then oxygen content, then toxic gases and vapors
- C. Toxic gases and vapors, then combustible gases and vapors, then oxygen content
- D. Oxygen content, then combustible gases and vapors, then toxic gases and vapors
Correct Answer: D
Per 29 CFR 1926.1204(e)(3), when testing for atmospheric hazards in a permit-required confined space, the employer must test first for oxygen, then for combustible gases and vapors, and then for toxic gases and vapors, in that order.
Reference: 29 CFR 1926, §1926.1204(e)(3)
Sample 2 — Concrete
Question: You are the contractor placing a slab on ground at a sewer plant during a cold-weather period. Snow and ice have been cleared from inside the forms, the subgrade is verified as unfrozen, and your supplier can adjust the delivered concrete temperature. To avoid inconsistent setting, rapid moisture loss, and plastic shrinkage cracking, the difference between the surface temperature of the supporting materials and the temperature of the concrete should be held to less than what value?
- A. 30°F (17°C)
- B. 50°F (28°C)
- C. 20°F (11°C)
- D. 40°F (22°C)
Correct Answer: C
Design and Control of Concrete Mixtures, Chapter 15 (Subgrade Preparation), states that in cold weather applications care should be taken to limit surface temperatures of supporting materials and the concrete to a temperature differential of less than 20°F (11°C) to avoid inconsistent setting, rapid moisture loss, and plastic shrinkage cracking (citing ACI 306R-16 and Mustard and Ghosh 1979). Concrete must also not be placed on frozen subgrade, and snow, ice, and debris must be removed from within the forms before placement.
Reference: Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Subgrade Preparation section, Page 314
Sample 3 — Sitework
Question: The Modified Proctor compaction test (ASTM D-1557) applies approximately how many times greater energy than the Standard Proctor test?
- A. Two times
- B. Five times
- C. Three times
- D. Ten times
Correct Answer: B
The Modified Proctor test (ASTM D-1557 / AASHTO T 180) uses a 10-lb rammer dropped 18 in. on each of five equal layers, applying approximately five times greater energy than the standard Proctor test. This higher energy level better simulates compaction by heavy modern equipment.
Reference: Construction Planning, Equipment, and Methods (9th ed.), Chapter 5 - Compaction and Stabilization Equipment, COMPACTION TESTS
Your first attempt tells you where you're starting from. After every attempt, the results page shows your score for each outline topic, so you can see what to study next. Compare your score with the real exam's passing score, 21 correct answers out of 30 scored questions, and keep going until you pass consistently.
- Answer the questions you know first, and bookmark the rest. Our practice exams let you bookmark and come back.
- Return to your bookmarks on the second pass.
- Keep a steady pace. The real exam works out to about 2 minutes 30 seconds per question.
- After each attempt, look up each missed question's reference and read the section.
| Questions | 30 questions |
| Time limit | 75 minutes |
| Passing score | 21 correct answers out of 30 scored questions |
| Books in the exam room | Open book |
Source: HEAVY CONSTRUCTION EXAMINATION. Check the bulletin before test day: fees and rules can change.