Louisiana State Portion 30 questions

Excavation and Grading 4 Q · 13%
Plan reading and interpretation of utility site plans (plan view, profile view, symbols, scales)Surveying fundamentals (elevations, benchmarks, cuts and fills, station numbers, optical level use)Pipe grades and slope calculations (percent, decimal, ratio methods)Laser and transit alignment for pipe layingCut and fill quantity estimation (cross section method, average end area method, contour lines)Soil compaction methods, testing, and density requirements (Proctor tests, nuclear density meter)Rock identification, rippability, and excavation methods (ripping, blasting, specialized equipment)Groundwater and dewatering techniques (wellpoints, pumping, sheet piling)
Electrical Power Distribution 5 Q · 17%
Electric system components: generation, transmission, and distributionDistribution circuit types: three-phase three-wire, three-phase four-wire, and single-phase primaryDistribution substations: equipment, voltage transformation, and feeder protectionDistribution transformers: types, ratings, connections, and installationOverhead line construction: poles, crossarms, insulators, and conductor supportsUnderground distribution systems: cables, conduit, manholes, and pad-mounted equipmentProtective devices: fuses, switches, reclosers, lightning arresters, and surge protectionVoltage regulation: tap-changing transformers, voltage regulators, and capacitors
Concrete and Concrete Reinforcement 5 Q · 17%
Portland cement types and their applications (Types I, II, III, V)Supplementary cementitious materials (fly ash, slag cement, silica fume, natural pozzolans)Water-cementitious materials ratio and its effect on strength and durabilityAggregate classification, grading, and selection requirementsSteel reinforcing bar grades, specifications, and placement requirementsConcrete mix proportioning and design proceduresConcrete durability and exposure categories (freeze-thaw, sulfate, chloride)Chemical admixtures types and their effects on fresh and hardened concrete
Water and Sewer Piping 6 Q · 20%
Pipe materials selection for water and sewer systems (ductile iron, PVC, concrete, copper, ABS, CPVC, PEX)Trench excavation, bedding, and backfill requirementsPipe joint types and assembly (push-on, mechanical, flanged, solvent-cement, fusion)Thrust restraint methods (thrust blocks, restrained joints, tie rods)Hydrostatic pressure testing, flushing, and disinfection of water mainsBackflow prevention devices and cross-connection controlDrainage fixture unit values and sanitary drainage system sizingReceiving, handling, and storage of pipe and appurtenances
Erosion and Sedimentation Control 3 Q · 10%
Storm Water Pollution Prevention Plan (SWPPP) development and required componentsStabilization practices for disturbed areas (temporary and permanent seeding, mulching, geotextiles)Structural sediment control measures (silt fence, sediment trap, sediment basin, earth dike)NPDES permit requirements and Notice of Intent/Notice of Termination proceduresSite assessment for erosion control (drainage areas, runoff coefficient, soil data, site mapping)Inspection and maintenance requirements for erosion and sediment controlsPost-construction storm water management controls (detention/retention ponds, velocity dissipation)Other construction site controls (waste disposal, offsite vehicle tracking, non-storm water discharges, spill prevention)
OSHA Safety 4 Q · 13%
Fall protection systems requirements and criteria (guardrail, safety net, personal fall arrest systems)Excavation and trenching safety (cave-in protection, sloping, shoring, and shield systems)Confined space entry procedures and permit-required confined space programsPersonal protective equipment selection, use, and employer payment requirementsOccupational health controls (noise exposure limits, air contaminants, and ventilation)Welding and cutting safety (gas cylinder handling, arc welding, and fire prevention)Medical services, first aid requirements, and emergency action plansSigns, signals, and barricades for construction sites
Welding 3 Q · 10%
Welding safety, PPE, and hazard recognitionWelding joints, positions, and weld symbolsShielded metal arc welding (SMAW) equipment, electrodes, and techniqueGas tungsten arc welding (GTAW) equipment, polarity, and techniqueOxyfuel gas welding and cutting equipment, setup, and flame adjustmentBrazing, braze welding, and filler metal selectionPipe and tube welding processes and positionsWeld inspection, testing methods, and procedure/welder qualifications

Key Distinctions

V-Bio enhanced polyethylene filmvsConventional polyethylene encasement

V-Bio (offered beginning 2013) uses co-extrusion to infuse a corrosion inhibitor and an anti-microbial component into the innermost surface of the film and is the recommended film for ductile iron pipe in corrosive soils, whereas conventional encasement has no such infused additives; both are installed per ANSI/AWWA C105/A21.5.

DIPRA Installation Guide for Ductile Iron Pipe, Pages 29 to 30 (Section 2.16 V-Bio Enhanced Polyethylene)
Oxygen enriched atmospherevsOxygen deficient atmosphere

Under 29 CFR 1926.1202, enriched means more than 23.5 percent oxygen by volume while deficient means less than 19.5 percent, and either is a hazardous atmosphere in a confined space.

29 CFR 1926, §1926.1202
Acetylene hose fitting nutvsOxygen hose fitting nut

The acetylene nut has a groove machined around its six sides and left-hand threads, while the oxygen nut has flat, smooth sides and right-hand threads, preventing cross-connection.

Modern Welding (12th ed.), Chapter 12 — Oxyfuel Gas Welding Equipment and Supplies, Section 12.5
Normal oxyacetylene shutdown valve ordervsFlashback emergency valve order

For normal shutdown the acetylene torch valve is closed first, then the oxygen torch valve, then the acetylene cylinder valve and oxygen cylinder valve; in a flashback the torch oxygen valve is turned off first, then the fuel gas torch valve, then both cylinder valves.

Modern Welding (12th ed.), Oxyfuel Gas Welding, Section 13.2.8
Arrow-side weld informationvsOther-side weld information

On an AWS welding symbol, arrow-side information is always placed below the reference line and other-side information always above it.

Modern Welding (12th ed.), Chapter 3, Section 3.5.3
Root opening dimensionvsGroove angle / groove weld size

The root opening size appears inside the weld symbol, the groove angle is shown beyond the weld symbol, and the groove weld size is shown in parentheses at the E position.

Modern Welding (12th ed.), Chapter 3, Section 3.5.4
Bank cubic yards (BCY)vsLoose cubic yards (LCY)

Bank yards are in-place volume and loose yards are the swelled, disturbed volume actually hauled; haul-off and truck loads must be figured from loose yards, since dividing bank volume by truck size under-counts loads.

Pipe and Excavation Contracting — Ch. 9, Estimating Surface Excavation (bank vs loose yards)
Swell factor 1.7 (broken slab material)vsSwell factors 1.3, 1.4, 1.5 (soils)

A swell factor of 1.7 is always allowed for broken asphalt and concrete slabs, while the lower factors such as 1.3–1.5 apply to soils such as loam.

Pipe and Excavation Contracting, Page 138
Field-cured cylindersvsStandard-cured cylinders

Field-cured cylinders are cured alongside the structure to judge whether curing and protection are adequate; curing is adequate if, at the age designated for f'c, their average strength is at least 85% of companion standard-cured cylinders (or field-cured strength exceeds f'c by more than 3.5 MPa / 500 psi).

Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Evaluation of Compression Test Results section, Page 440
Cast-in-place cylinders (ASTM C873)vsStandard-cured cylinders

Cast-in-place cylinders are molded in the member and cured exactly as the surrounding concrete to verify in-place strength (usable in members 5 in. to 12 in. deep), rather than relying on separately standard-cured specimens.

Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Strength Tests of Hardened Concrete section, Page 437
Shoring jacks with plywood tight-sheetingvsTrench boxes / open ditch

Tight-sheeting with plywood against the shoring jacks suits wet clays and loams that slab off the lower trench, trench boxes are recommended for deep trenches in unstable ground such as wet sands and gravels, and open ditches are only for shallow excavations in reasonably dry, stable soil.

Pipe and Excavation Contracting, Page 228 (Installing Sewer & Stormwater Systems chapter)
Hard-troweled (steel-troweled) finishvsFloat or broom finish

Concrete with more than 3% entrained air should not be hard-troweled because of delamination risk, so mixtures at 6% or more air typical of exterior freeze-thaw exposure receive float or broom finishes instead.

Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Finishing Flatwork / Bullfloating or Darbying section, Page 330
Potable water pipingvsPreviously nonpotable piping

Per IPC 608.11, piping used for any purpose other than conveying potable water shall not be used for conveying potable water, and disinfection does not remove that prohibition.

IPC 2021 Section 608.11

Key Terms

Oxygen enriched atmosphere (29 CFR 1926.1202) 29 CFR 1926, §1926.1202
An atmosphere containing more than 23.5 percent oxygen by volume, which is a hazardous atmosphere under the confined spaces standard.
Nonpotable pipe identification interval (IPC 608.9.2) IPC 2021 Section 608.9.2
Pipe identification on nonpotable water distribution piping shall be repeated at intervals not exceeding 25 feet and at each point where the piping passes through a wall, floor or roof.
Nonpotable identification tape (IPC 608.9.2.3) IPC 2021 Section 608.9.2.3
Tape installed on top of nonpotable rainwater distribution pipes, fastened not less than every 10 feet to each pipe length and run continuously the entire length of the pipe.
Water service pipe minimum size (IPC 603.1) IPC 2021 Section 603.1
The water service pipe shall be not less than 3/4 inch (19.1 mm) in diameter.
Slope upstream of a grease interceptor (IPC 704.1) IPC 2021 Page 7-3
Horizontal drainage piping upstream of a grease interceptor shall slope not less than 1/4 inch per foot (2-percent slope), regardless of pipe size.
Cleanout size (IPC 708.1.5) IPC 2021 Page 7-7
Cleanouts shall be the same size as the piping served, except that cleanouts for piping larger than 4 inches need not be larger than 4 inches.
Box Test (AASHTO TP 137) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Segregation Resistance / Box Test section, Page 430
A test in which unconsolidated low-slump concrete is placed in a 28 L (1 ft³) collapsible wood form, vibrated with a 25-mm (1-in.) square-head vibrator, and the stripped sides checked for voids and edges for slumping; a common slipform paving target is edge slump of 6 mm (0.25 in.) or less.
Cast-in-place cylinder (ASTM C873) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Strength Tests of Hardened Concrete section, Page 437
A cylinder molded during normal placement and left in the member to cure with it, then removed and tested; usable in concrete 125 mm to 300 mm (5 in. to 12 in.) deep and particularly applicable to cold-weather concreting, post-tensioning and slabs.
Adequate field curing criterion (ACI 318-19) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Evaluation of Compression Test Results section, Page 440
Curing and protection are adequate if field-cured cylinders tested at the age designated for f'c average at least 85% of companion standard-cured cylinder strength, or if field-cured strength at test age exceeds f'c by more than 3.5 MPa (500 psi).
Water required for complete hydration Design and Control of Concrete Mixtures (17th ed.), Chapter 2 — Water (Evaporable and Nonevaporable) section, Page 43
Complete hydration of portland cement requires about 40% water by mass of cement (w/c of 0.40); below about 0.40 some cement remains unhydrated for lack of water.
Cold-weather subgrade temperature differential Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Subgrade Preparation section, Page 314
Surface temperature of supporting materials and the concrete temperature should differ by less than 20°F (11°C) to avoid inconsistent setting, rapid moisture loss and plastic shrinkage cracking; concrete must not be placed on frozen subgrade and snow, ice and debris must be removed from the forms.
Acetylene maximum safe working pressure Modern Welding (12th ed.), Chapter 12 — Oxyfuel Gas Welding Equipment and Supplies, Section 12.3.1 and 12.3.3
Acetylene is unsafe above 15 psig (103 kPa); most acetylene low-pressure gauges are graduated only to 15 psig with higher pressures marked by a solid red arc.
Two-stage oxygen regulator Modern Welding (12th ed.), Chapter 12 — Oxyfuel Gas Welding Equipment and Supplies, Section 12.4.3
A regulator whose first stage reduces cylinder pressure to about 200 psig (1400 kPa), with the second stage reducing that to the selected working pressure.
Flashback Modern Welding (12th ed.), Oxyfuel Gas Welding, Section 13.2.9
A sustained backfire that continues burning back through the torch and into the hoses and potentially the regulators; flashback arrestors prevent it reaching regulators or cylinders.
Neutral oxyacetylene flame temperature Modern Welding (12th ed.), Oxyfuel Gas Welding, Section 13.1.3
A neutral oxyacetylene welding flame produces approximately 5589°F (3087°C), versus oxypropane at 4579°F (2526°C).
Cutting plane line Modern Welding (12th ed.), Chapter 2, Section 2.4.5
The thickest line type on a drawing, made of a series of 3/4″ long lines alternating with pairs of short 1/8″ dashes; whenever used, a section view must be provided on the print.
4F position Modern Welding (12th ed.), Chapter 3, Section 3.4
The AWS designation for a fillet weld made in the overhead position (flat, horizontal, vertical, overhead = 1F, 2F, 3F, 4F).
Pipe tongs (DIPRA Section 1.6) DIPRA Installation Guide for Ductile Iron Pipe, Pages 13 to 14 (Section 1.6 Pipe Tongs)
Patented lifting clamps for ductile iron pipe; if suspended pipe contacts trench bracing protruding above ground, the tongs may release the pipe prematurely (ice on holding pads is a separate cold-weather slippage caution).
Drain rock for manhole excavation Pipe and Excavation Contracting, Pages 246-247 (Installing Sewer & Stormwater Systems chapter)
Rock used to stabilize running sands and gravels in groundwater conditions, placed around the pump intake (or the intake set in a slotted pipe) to keep it clear; excavating too quickly causes splashing and more subsidence.

Formulas to Know

Loose volume of broken slab material (asphalt/concrete)LCY = BCY × 1.7 (always allow 1.7 swell for broken slab); example: 1,400 BCY × 1.7 = 2,380 LCY
Loose volume using a stated percent swellLCY = BCY × (1 + swell%); example: 25.19 BCY × 1.30 = 32.74 LCY. Increasing swell from 30% to 40% adds 10% of bank volume: 25.19 × 0.10 = 2.52 cu yd
Number of haul truck loadsLoads = loose cu yd ÷ truck capacity, rounded up; example: 32.74 ÷ 12 = 2.73 → 3 loads (do not use bank volume)
Height of instrument when grade rod is set on top of pipeHI = rod reading on hub + cut − (pipe diameter + wall thickness); example: 4.78 + 12.66 − 1.25 = 16.19
Open-delta transformer bank capacityAfter multiplying connected motor load by the proper percentage for the number of motors, multiply the result by 1.35 for an open-delta bank, then select the next larger standard transformer rating
Trench or footing length on outside perimeterLength = 2 × (length + width); examples: 2 × (40 + 28) = 136 lin ft; 2 × (48 + 26) = 148 ft
Concrete/excavation volume in cubic yardscu yd = length(ft) × width(ft) × depth(ft) ÷ 27; examples: 136 × 2.5 × 2 = 680 cu ft ÷ 27 = 25.19 cu yd; 148 × 1.333 × 1.000 = 197.33 cu ft ÷ 27 = 7.31 cu yd; piers 2 × 2 × 1 = 4.00 cu ft each, 4 piers = 16.00 ÷ 27 = 0.59 cu yd
4-inch slab concrete from Table 11-1At 4 in., one cubic yard covers 81 sq ft: cu yd = slab area ÷ 81, rounded up to whole yards; example: 960 ÷ 81 = 11.85 → 12 cu yd (check: 960 × 0.333 ÷ 27 = 11.85)
8-inch foundation wall concrete from the printed tablecu yd = (wall area ÷ 100) × 2.47 cu yd per 100 sq ft; example: 136 × 8 = 1,088 sq ft → 10.88 × 2.47 = 26.87 cu yd (check: 1,088 × 0.667 ÷ 27 = 26.86)
Wall form contact areaContact area = 2 (both faces) × perimeter × wall height; example: 2 × 136 ft × 8 ft = 2,176 sq ft
Concrete ordering rounding rulesContinuous footing: round net volume UP to the next quarter yard (5.10 → 5.25; 4.48 → 4.5; 7.31 → 7.5; 6.91 → 7). Combined order: sum net volumes, then round UP to the next whole yard (5.10 + 0.69 + 11.85 = 17.65 → 18 cu yd)
8-inch concrete block countsThree courses stack 2 ft: courses = height × 3/2 (4 ft → 6 courses). Three blocks lay 4 ft: blocks per course = length × 3/4 (32 ft → 24 blocks)