Louisiana Municipal and Public Works Construction Practice Exam
Free Practice Exam
Test your knowledge with 10 questions from our pool of 20 free questions.
- 10 questions per attempt
- 30 minute time limit
- Unlimited attempts
- A new mix each time
- Instant results
Full Practice Exam
Complete exam simulation matching the real PSI test format.
- 30 questions (same as real exam)
- 75 minute time limit
- 7 topic areas covered
- 201 questions in pool
- Detailed explanations
Texts preferred · 9am–9pm Central
Louisiana Municipal and Public Works Construction Practice Exam Guide
What's on the exam
Questions per topic, out of 30This practice exam follows the official content outline for the Louisiana Municipal and Public Works Construction exam: Excavation and Grading, Electrical Power Distribution, Concrete and Concrete Reinforcement, Water and Sewer Piping, Erosion and Sedimentation Control, OSHA Safety, Welding.
You can practice two ways. The free practice exam gives you 10 questions per attempt, and you can retake it whenever you like. The full practice exam gives you 30 questions on a 75 minutes clock, with a new draw from our question bank each attempt.
Excavation and Grading 4 items
Our study plan for this topic: Plan reading and interpretation of utility site plans (plan view, profile view, symbols, scales); Surveying fundamentals (elevations, benchmarks, cuts and fills, station numbers, optical level use); Pipe grades and slope calculations (percent, decimal, ratio methods); Laser and transit alignment for pipe laying; Cut and fill quantity estimation (cross section method, average end area method, contour lines); Soil compaction methods, testing, and density requirements (Proctor tests, nuclear density meter); Rock identification, rippability, and excavation methods (ripping, blasting, specialized equipment); Groundwater and dewatering techniques (wellpoints, pumping, sheet piling).
Electrical Power Distribution 5 items
Our study plan for this topic: Electric system components: generation, transmission, and distribution; Distribution circuit types: three-phase three-wire, three-phase four-wire, and single-phase primary; Distribution substations: equipment, voltage transformation, and feeder protection; Distribution transformers: types, ratings, connections, and installation; Overhead line construction: poles, crossarms, insulators, and conductor supports; Underground distribution systems: cables, conduit, manholes, and pad-mounted equipment; Protective devices: fuses, switches, reclosers, lightning arresters, and surge protection; Voltage regulation: tap-changing transformers, voltage regulators, and capacitors.
Concrete and Concrete Reinforcement 5 items
Our study plan for this topic: Portland cement types and their applications (Types I, II, III, V); Supplementary cementitious materials (fly ash, slag cement, silica fume, natural pozzolans); Water-cementitious materials ratio and its effect on strength and durability; Aggregate classification, grading, and selection requirements; Steel reinforcing bar grades, specifications, and placement requirements; Concrete mix proportioning and design procedures; Concrete durability and exposure categories (freeze-thaw, sulfate, chloride); Chemical admixtures types and their effects on fresh and hardened concrete.
Water and Sewer Piping 6 items
Our study plan for this topic: Pipe materials selection for water and sewer systems (ductile iron, PVC, concrete, copper, ABS, CPVC, PEX); Trench excavation, bedding, and backfill requirements; Pipe joint types and assembly (push-on, mechanical, flanged, solvent-cement, fusion); Thrust restraint methods (thrust blocks, restrained joints, tie rods); Hydrostatic pressure testing, flushing, and disinfection of water mains; Backflow prevention devices and cross-connection control; Drainage fixture unit values and sanitary drainage system sizing; Receiving, handling, and storage of pipe and appurtenances.
Erosion and Sedimentation Control 3 items
Our study plan for this topic: Storm Water Pollution Prevention Plan (SWPPP) development and required components; Stabilization practices for disturbed areas (temporary and permanent seeding, mulching, geotextiles); Structural sediment control measures (silt fence, sediment trap, sediment basin, earth dike); NPDES permit requirements and Notice of Intent/Notice of Termination procedures; Site assessment for erosion control (drainage areas, runoff coefficient, soil data, site mapping); Inspection and maintenance requirements for erosion and sediment controls; Post-construction storm water management controls (detention/retention ponds, velocity dissipation); Other construction site controls (waste disposal, offsite vehicle tracking, non-storm water discharges, spill prevention).
OSHA Safety 4 items
Our study plan for this topic: Fall protection systems requirements and criteria (guardrail, safety net, personal fall arrest systems); Excavation and trenching safety (cave-in protection, sloping, shoring, and shield systems); Confined space entry procedures and permit-required confined space programs; Personal protective equipment selection, use, and employer payment requirements; Occupational health controls (noise exposure limits, air contaminants, and ventilation); Welding and cutting safety (gas cylinder handling, arc welding, and fire prevention); Medical services, first aid requirements, and emergency action plans; Signs, signals, and barricades for construction sites.
Welding 3 items
Our study plan for this topic: Welding safety, PPE, and hazard recognition; Welding joints, positions, and weld symbols; Shielded metal arc welding (SMAW) equipment, electrodes, and technique; Gas tungsten arc welding (GTAW) equipment, polarity, and technique; Oxyfuel gas welding and cutting equipment, setup, and flame adjustment; Brazing, braze welding, and filler metal selection; Pipe and tube welding processes and positions; Weld inspection, testing methods, and procedure/welder qualifications.
Sample 1 — Water and Sewer Piping
Question: What is the minimum diameter required for a water service pipe?
- A. 1 1/4 inches
- B. 1/2 inch
- C. 1 inch
- D. 3/4 inch
Correct Answer: D
Per IPC Section 603.1, the water service pipe shall be not less than 3/4 inch (19.1 mm) in diameter. This is the minimum size required to supply water to the structure in the quantities and at the pressures required by the code.
Reference: IPC 2021 Section 603.1
Sample 2 — Electrical Power Distribution
Question: Exceptional stability is required for a pole, so an artificial concrete foundation will be placed around the base. What proportions are recommended for the concrete mixture (cement : sand : broken stone or gravel)?
- A. 1 : 3 : 6
- B. 1 : 2 : 5
- C. 1 : 2½ : 5
- D. 1 : 2 : 4
Correct Answer: C
Per the Lineman's and Cableman's Handbook, Chapter 11 (Setting Poles / pole foundations), a good mix for a concrete pole foundation is 1 to 2½ to 5 — 1 part cement, 2½ parts sand, and 5 parts broken stone or gravel — with enough water added that the mixture flows freely and takes its place without tamping. The filling should extend about 1 ft from the pole on all sides and be carried ½ ft above grade with a beveled top, and no line work should be done on the pole within a week after the pour.
Reference: Lineman's and Cableman's Handbook, Chapter 11 — Setting Poles (concrete foundation) section
Sample 3 — Concrete and Concrete Reinforcement
Question: You are proportioning concrete for a water treatment plant structure, and the project specification adopts the industry-standard limits on 28-day drying shrinkage measured on standard length-change specimens. Your mixture uses a nominal maximum aggregate size of 1½ in. What maximum 28-day shrinkage applies to this mixture?
- A. 0.030%
- B. 0.055%
- C. 0.040%
- D. 0.035%
Correct Answer: D
Per Design and Control of Concrete Mixtures (17th ed.), Chapter 10, common specifications including ACI 301 require a maximum 28-day shrinkage of 0.040% for concrete with a maximum aggregate size of 25 mm (1 in.) and smaller, and 0.035% for concrete with a maximum aggregate size above 25 mm (1 in.). A 1½ in. nominal maximum aggregate exceeds 1 in., so the 0.035% limit governs. 0.040% is the limit for the smaller aggregate size, and 0.055% approximates typical ultimate (not 28-day) shrinkage magnitudes.
Reference: Design and Control of Concrete Mixtures (17th ed.), Chapter 10 — Moisture Changes (Drying Shrinkage) of Hardened Concrete section, Page 193
Your first attempt tells you where you're starting from. After every attempt, the results page shows your score for each outline topic, so you can see what to study next. Compare your score with the real exam's passing score, 21 correct answers out of 30 scored questions, and keep going until you pass consistently.
- Answer the questions you know first, and bookmark the rest. Our practice exams let you bookmark and come back.
- Return to your bookmarks on the second pass.
- Keep a steady pace. The real exam works out to about 2 minutes 30 seconds per question.
- After each attempt, look up each missed question's reference and read the section.
| Questions | 30 questions |
| Time limit | 75 minutes |
| Passing score | 21 correct answers out of 30 scored questions |
| Books in the exam room | Open book |
Source: MUNICIPAL AND PUBLIC WORKS CONSTRUCTION EXAMINATION. Check the bulletin before test day: fees and rules can change.