Louisiana Municipal and Public Works Construction Exam: Step-by-Step Study Guide
Preparing for the Louisiana Municipal and Public Works Construction exam is easier one step at a time. This guide starts with the key facts from the official bulletin, then covers the topics on the exam, the reference books, sample questions with answers, and a simple way to prepare. PSI gives the exam.
Louisiana Municipal and Public Works Construction Exam Overview
Start with the facts. Here's what the official bulletin says:
| Questions | 30 questions |
| Time limit | 75 minutes |
| Passing score | 21 correct answers out of 30 scored questions |
| Books in the exam room | Open book |
On exam day
- Candidates must bring their own references, which may be highlighted, underlined, annotated or indexed beforehand but not written in during the exam, and no extra papers may accompany them; violators have references confiscated and are reported to the department.
- Highlighting, underlining and annotating are allowed before the exam session and only permanent tabs may be used, while temporary tabs such as Post-It notes must be removed before the exam begins.
- No additional papers, loose or attached, may be brought in with the approved references, and any such materials will be removed and confiscated.
References you may bring
- Code of Federal Regulations - 29 CFR Part 1926 (OSHA), with latest available amendments
- Code of Federal Regulations - 29 CFR Part 1926 Selections by PSI, with latest available amendments
- Storm Water Management for Construction Activities (1992)
- Lineman's and Cableman's Handbook, Shoemaker and Mack (13th Edition, 14th Edition)
- Installation Guide for Ductile Iron Pipe (2015 with latest updates)
- International Plumbing Code (2021)
- Modern Welding (11th Edition, 2013)
- Design and Control of Concrete Mixtures, Steven H. Kosmatka and William C. Panarese (17th Edition, 2021)
- Pipe and Excavation Contracting, Dave Roberts (2011)
Source: MUNICIPAL AND PUBLIC WORKS CONSTRUCTION EXAMINATION. Check the bulletin before test day: fees and rules can change.
Topics on the Louisiana Municipal and Public Works Construction Exam
Next, the content. The official content outline has 7 topics:
| Topic | Questions | Share of the exam |
|---|---|---|
| Excavation and Grading | 4 | 13% |
| Electrical Power Distribution | 5 | 17% |
| Concrete and Concrete Reinforcement | 5 | 17% |
| Water and Sewer Piping | 6 | 20% |
| Erosion and Sedimentation Control | 3 | 10% |
| OSHA Safety | 4 | 13% |
| Welding | 3 | 10% |
A Simple Plan to Prepare for the Louisiana Municipal and Public Works Construction Exam
Step one is the books. This is an open-book exam, so the references on the bulletin's list are what you'll work from, while you study and in the exam room. For the International Plumbing Code, get the 2021 edition the bulletin lists, because Code questions are based only on that edition. For the other books, the bulletin lets you base your answers on later editions.
Step two is learning your way around them. Go through each book's table of contents and index until you know where the major subjects are. You don't need to memorize the books. You need to find things in them.
Step three is marking them up. Highlight the sections you use most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
Step four is timed practice. Our practice exams run on a clock, so you get used to the real exam's pace: about 2 minutes 30 seconds per question.
The last step is consistency. Keep practicing until you pass several practice exams in a row. That's the signal you're ready.
Reference Books for the Louisiana Municipal and Public Works Construction Exam
The bulletin lists eight references, all allowed in the test room; 29 CFR Part 1926 (OSHA) may be either the Government Printing Office edition or the Selections by PSI.
Where to get them:
- Lineman's and Cableman's Handbook 13th
- OSHA 29 CFR 1926
- IPC 2021
- Design and Control of Concrete Mixtures
- Modern Welding
- DIPRA Installation Guide for Ductile Iron Pipe
- Pipe and Excavation Contracting
- Storm Water Management for Construction Activities
On Test Day
Go through the exam at a steady pace. On your first pass, answer the questions you know and bookmark the ones you don't. Every exam lets you come back to bookmarked questions, but some lock the ones you've seen once you take a break, so finish your bookmarks first.
On your second pass, return to your bookmarks one at a time. You have 75 minutes for 30 questions, which is about 2 minutes 30 seconds per question, so keep moving and don't let one question hold you up. Before you finish, answer anything you skipped. A blank can't earn a point.
Study Tips
Read each answer choice in order. If it seems correct, mark it as your current best. Each subsequent choice must beat your current best to replace it. Keep going until you've reviewed all choices, then verify your final selection actually answers the question.
Be alert to hedging words like likely, may, can, sometimes, usually, generally, and rarely—question writers use them to account for exceptions. An answer choice is often wrong simply because it allows no exceptions. Similarly, avoid choices containing absolute terms like exactly and always.
Every exam you take will be different from the last. New questions, new order, but always based on the exam bulletin in terms of topics, questions and time.
Sample Louisiana Municipal and Public Works Construction Practice Questions
Here are a few questions from our practice question bank, each with its answer and reference.
Sample 1 — Excavation and Grading
Question: A set of utility plans notes a side slope as 3:1. Following the convention used by engineers and surveyors on underground utility work, what does that notation describe?
- A. 1 foot of vertical fall in each 3 horizontal feet
- B. 3 feet of vertical fall in each 1 horizontal foot
- C. 3 inches of vertical fall in each foot of horizontal run
- D. 1 foot of vertical fall in each 3 feet of slope length
Correct Answer: A
Pipe and Excavation Contracting (Slope as a Ratio) explains that in utility work the horizontal distance is given first and the vertical second, so 3:1 means 1 foot of vertical fall in each 3 horizontal feet. Carpenters and plumbers reverse the order (rise first), which is why the text warns that the ratio method is easily misunderstood and is not precise enough for utility line grades.
Reference: Pipe and Excavation Contracting, Pages 118 to 119
Sample 2 — OSHA Safety
Question: You rig a positioning device system so an employee can work with both hands free while leaning against an elevated wall, limiting free fall to no more than 2 feet. The anchorage must support at least twice the potential impact load of the employee's fall, or a minimum of which value, whichever is greater?
- A. 2,250 pounds
- B. 1,800 pounds
- C. 3,000 pounds
- D. 5,000 pounds
Correct Answer: C
Per 29 CFR 1926.502(e)(2), positioning devices must be secured to an anchorage capable of supporting at least twice the potential impact load of an employee's fall or 3,000 pounds (13.3 kN), whichever is greater. The 5,000-pound figure is the per-employee anchorage requirement for personal fall arrest systems under 1926.502(d)(15).
Reference: 29 CFR 1926, §1926.502(e)(2)
Sample 3 — Erosion and Sedimentation Control
Question: As the contractor preparing the storm water pollution prevention plan for a public works site, you determine that one common drainage location will receive runoff from 12 disturbed acres at one time, and a temporary sediment basin is attainable at that point. What is the minimum storage volume the basin must provide?
- A. 60,000 cubic feet
- B. 36,000 cubic feet
- C. 21,600 cubic feet
- D. 43,200 cubic feet
Correct Answer: D
The EPA Construction General Permit requires a sediment basin to provide at least 3,600 cubic feet of storage for every acre drained. 12 acres x 3,600 cu ft/acre = 43,200 cubic feet. Distractor B is the volume for 10 acres; C corresponds to 6 acres. See the Erosion and Sediment Control Selection Checklist, Sediment Basin Runoff Storage Calculation.
Reference: Storm Water Management for Construction Activities (EPA 833-B-92-001), Page 21 — Erosion and Sediment Control Selection Checklist; and Page 8
Sample 4 — Welding
Question: Which weld joint type is formed when two pieces of base metal overlap, with the top surface of one piece in contact with the bottom surface of the other?
- A. Edge joint
- B. Lap joint
- C. Corner joint
- D. Butt joint
Correct Answer: B
A lap joint is formed by two overlapping pieces of base metal where the top surface of one piece is in contact with the bottom surface of the other. No special edge preparation is required for a lap joint.
Reference: Modern Welding (12th ed.), Chapter 3, Section 3.1.2
Practicing Online vs. With a PDF
A PDF lets you read questions at your own pace. The real exam runs on a clock. Our practice exams are timed and on a screen, so you practice finding answers with the clock running. Each attempt draws a new set of questions from our bank, and your results show your score by topic, so you always know what to study next.
Your Next Step
Take the free Louisiana Municipal and Public Works Construction practice exam to see where you stand. Then study the topics that need the most attention, one at a time. For the official rules, read the exam bulletin, and see the licensing board's website.