Exam Cheat Sheet · Quick Reference

Oklahoma Refinery Electrical Journeyman

Oklahoma  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
100
Passing score
70%
Exam time
240 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

Oklahoma State Portion 100 questions

General Electrical Knowledge 10 Q · 10%
Permits and InspectionsPreservation of Structural IntegrityNeeds Analysis and EstimateVoltage, Current, and Resistance in Series, Parallel, and Combination CircuitsPower Used in a CircuitPower lost (called Heat Lost) in Any CircuitFundamental AC TheoryFundamental Three-phase AC TheoryCost of Power Used in a CircuitTroubleshooting and Test SystemsNational Electrical CodebookDefinitions Used by the NEC +3 more
Electrical Installation Requirements 4 Q · 4%
Approved Methods of Installation of Electrical EquipmentApproved Methods of Installation of Electrical Equipment in Excess of 600 voltsBranch-Circuit and Feeder Load Calculations and Demand FactorsGFCI and AFCI Protection RequirementsWorking Space and Clearance Requirements for Electrical EquipmentUnderground Installation and Minimum Cover RequirementsConductor Sizing, Ampacity, and Overcurrent Protection for Branch Circuits and FeedersOutside Branch Circuits and Feeders — Clearances, Supports, and Disconnecting MeansWiring Methods — Protection, Support, and Raceway Installation RequirementsHigh-Voltage Equipment Clearances and Minimum Live-Part Separation
Services, Feeders, and Branch Circuits 6 Q · 6%
ServicesVoltage Drop for Branch Circuits or FeedersServices in Excess of 600 voltsFeedersOutside Branch Circuits and FeedersBranch CircuitsSpace-heating, Snow-melting, and Pipe-heating CircuitsAir-conditioning and Refrigeration Equipment
Overcurrent Protection 6 Q · 6%
NEC Overcurrent Protection RequirementsConductor overcurrent protection ratings and small conductor rules (AWG sizing limits)Standard ampere ratings for fuses and circuit breakers (Table 240.6(A))Location of overcurrent protective devices (tap conductor rules, feeder taps, transformer secondary conductors)Circuit breaker requirements (marking, interrupting ratings, arc energy reduction for 1200A and above)Overcurrent protection for systems over 1000 volts (Article 245 devices, power fuses, circuit breakers)Motor branch-circuit protective device maximum ratings and running overload protectionShort-circuit current calculation methods (transformer let-through current, fault current at point of fault)Surge-protective devices and surge arresters (SPD types, ratings, installation requirements)
Grounding and Bonding 10 Q · 10%
General RequirementsRequired Sizes of Grounding Electrode ConductorsRequired Sizes of Equipment Grounding ConductorsGrounding Electrode System and Electrode TypesGrounding Electrode Conductor Installation MethodsMain Bonding Jumper and System Bonding Jumper RequirementsSupply-Side Bonding Jumper Sizing and InstallationBonding of Piping Systems and Structural MetalEquipment Grounding Conductor Types and IdentificationBonding Methods in Hazardous (Classified) LocationsGrounding of Separately Derived AC Systems
Conductors and Cables 6 Q · 6%
Underground Conductors and CablesVertical InstallationsSelecting ConductorsArmored Cable, Type ACMetal-clad Cable, Type MCNonmetallic-sheathed Cable, Types NM, NMC, NMSService Entrance Cables, Types SE and USEUnderground Feeder and Branch Circuit Cable, Type UFMineral Insulated, Type MIFlat Cable Assemblies, Type FC, and Flat Conductor Cable, Type FCCMedium Voltage Cable, Type MV
Raceways and Boxes 6 Q · 6%
General Raceway RequirementsGeneral Box RequirementsPull BoxesConduit FittingsType RMC (Rigid Metal Conduit)Type EMT (Electric Metallic Conduit)Type IMC (Intermediate Metal Conduit)Type RNC (Rigid Nonmetallic Conduit)Type FMC (Flexible Metal Conduit)Type LFMC (Liquid-tight Flexible Metal Conduit)Type FMT (Flexible Metallic Tubing)Type HDPE (High-density Polyethylene Conduit) +10 more
Low Voltage, Alarms, Signaling Systems, and Communications 4 Q · 4%
Remote Control or Signaling CircuitsCommunication CircuitsEquipment Operating at 50 volts or LessFiber OpticsPhotovoltaicsRemote ControlsFire AlarmsCircuit Wiring for an Emergency SystemCommunications Systems Wiring
Lighting and Signs 4 Q · 4%
Fixture InstallationFixture GroundingFixture WiringFluorescent FixturesFixture Construction RequirementsRecessed FixturesLighting Systems that Operate at Less Than 30 voltsNeon Lighting and Electric Signs
Safety 5 Q · 5%
Job Site SanitationResponsibility for Providing Personal Protective EquipmentExcavation SafetyEmergency Action PlansSafety Training RequirementsVentilationFirst Aid Kit RequirementsUse of Personal Protective EquipmentSigns, Signals, and BarricadesTools and EquipmentLaddersWorkplace Illumination +6 more
Motors and Transformers 4 Q · 4%
Motors Used in DwellingsMotor Branch Circuits in Industrial and Commercial LocationsFeeder TransformersUse of TransformersMotor Controller Requirements and RatingsMotor Disconnecting Means Types and LocationMotor Overload Protection Methods and SizingFull-Load Current Tables for DC, Single-Phase, and Three-Phase MotorsAdjustable-Speed Drive Systems and Power Conversion EquipmentTransformer Overcurrent Protection and Sizing CalculationsTransformer Installation Requirements and VaultsHermetic Refrigerant Motor-Compressor Branch-Circuit Protection
Hazardous Locations 35 Q · 35%
Hazardous Location ClassificationsHazardous MaterialsEquipment used in Hazardous LocationsVentilation and SealsUnderground WiringFuel Dispensing Location Requirements

Key Distinctions

NEC Chapters 1, 2, 3, and 4vsNEC Chapter 8

Per 90.3, Chapters 1-4 apply generally to all installations (Chapters 5, 6, and 7 apply to special occupancies, special equipment, or other special conditions), while Chapter 8 covers communications systems and is not subject to Chapters 1 through 7 except where specifically referenced in Chapter 8.

NEC 2023 Section 90.3
Mandatory rules (90.5(A))vsInformational Notes (90.5(C))

Mandatory rules are characterized by 'shall' or 'shall not' and identify actions specifically required or prohibited, while informational notes are explanatory material included for informational purposes only and are not enforceable as Code requirements.

NEC 2023 Section 90.5(A)
Motor branch-circuit conductors (430.22(A))vsMotor disconnecting means (430.110(A))

Branch-circuit conductors supplying a single motor must have an ampacity of not less than 125% of the motor full-load current rating, while the disconnecting means must have an ampere rating of at least 115% of the motor nameplate current rating.

NEC 2023 Section 430.22(A)
Elevator metal/nonmetallic wireway fill (620.32)vsOther elevator raceway fill (620.33)

Section 620.32 permits the sum of the cross-sectional areas of the individual conductors in a wireway used for elevator wiring to be up to 50 percent of the wireway interior cross-sectional area, whereas 620.33 limits conductor fill in other raceways to 40 percent.

NEC 2023 Section 620.32 (see also Section 620.33)
Portable power feeder cable 2000-5000 voltsvsPortable power feeder cable 5001-25,000 volts

Per 400.47, the minimum bending radii shall not exceed six times the overall cable outer diameter for 2000 to 5000 volt cable and eight times the overall cable outer diameter for 5001 to 25,000 volt cable.

NEC 2023 Section 400.47
Emergency power source general duration (700.12(C))vsStorage batteries/UPS for emergency illumination (700.12(C)(4))

The general minimum duration for an emergency power source is not less than 2 hours of system operation, while storage batteries and UPS supplying emergency illumination must maintain the total load a minimum of 1½ hours without load voltage falling below 87½ percent of nominal.

NEC 2023 Section 700.12(C)
Class I, Group AvsGroups B, C, and D

Per 500.6(A)(1), acetylene is the sole material identified as Group A; hydrogen is a typical Group B material, ethylene a typical Group C material, and propane a typical Group D material.

NEC 2023 Section 500.6(A)(1)
Class II Group E dustsvsClass II Group F and Group G dusts

Group E covers combustible metal dusts including aluminum, magnesium, and their commercial alloys; Group F covers carbonaceous dusts; Group G covers combustible dusts not in Group E or F, including flour, grain, wood, plastic, and chemicals.

NEC 2023 Section 500.6(B)(1)
Straight pull box sizing (314.28(A)(1))vsAngle pull box sizing (314.28(A)(2))

For straight pulls the minimum box length is 8 times the trade diameter of the largest raceway, while for angle pulls the minimum distance to the opposite wall is 6 times the trade diameter of the largest raceway on that wall plus the sum of the trade diameters of the other raceways on the same wall.

NEC 2023 Section 314.28(A)(1)
Dry location (Article 100)vsDamp and wet locations (Article 100)

A dry location is not normally subject to dampness or wetness and may be temporarily subject to them, as in a building under construction; a damp location is subject to moderate degrees of moisture (canopies, roofed porches, some basements) and a wet location is unprotected and exposed to weather, subject to saturation, underground, or in concrete in contact with earth.

NEC 2023 Article 100 — Definition of Location, Dry (see also Location, Damp and Location, Wet)
Control room (Article 100, 620)vsMachine room (Article 100, 620)

A control room is an enclosed control space outside the hoistway intended for full bodily entry containing the elevator motor controller and possibly other elevator-related equipment but not the electric driving machine or hydraulic machine, while a machine room is the enclosed space outside the hoistway intended for full bodily entry that contains the electric driving machine or hydraulic machine.

NEC 2023 Article 100 — Definition of Control Room (620) (see also Machine Room, Control Space, Machinery Space)
Feeder voltage drop recommendation (3%)vsCombined feeder plus branch-circuit voltage drop recommendation (5%)

The Informational Note recommends feeders sized to prevent a voltage drop exceeding 3 percent at the farthest outlet and a maximum total voltage drop on both feeders and branch circuits not exceeding 5 percent; both are recommendations, not mandatory requirements.

NEC 2023 Section 215.2(A)(4)

Key Terms

Authority having jurisdiction (AHJ) NEC 2023 Section 90.4(B)
Per 90.4, the AHJ for enforcement of the Code has the responsibility for making interpretations of the rules, deciding on approval of equipment and materials, and granting special permission contemplated in the rules.
Measurement system of preference (90.9) NEC 2023 Section 90.9(A), 90.9(B)
Per 90.9(A) and (B), metric units in accordance with the International System of Units (SI) are the preferred system, with SI units appearing first and inch-pound units immediately following in parentheses.
Class I, Division 1 location NEC 2023 Section 500.5(B)(1)
Per 500.5(B)(1), a location where ignitible concentrations of flammable gases, flammable liquid-produced vapors, or combustible liquid-produced vapors can exist under normal operating conditions.
Explosionproof protection technique NEC 2023 Section 500.7(A)
Per 500.7(A), a protection technique permitted for equipment in Class I, Division 1 or Division 2 locations.
Autoignition temperature limit (500.8(B)(1)) NEC 2023 Section 500.8(B)(1)
In Class I locations, equipment shall not have any exposed surface that operates at a temperature in excess of the autoignition temperature of the specific gas or vapor.
Adequate ventilation (hazardous area classification) Hazardous Locations, Chapter 1 — Classification of Areas and Locations, Page 21
A condition where the concentration of combustible material does not exceed 25 percent of its lower flammable limit, which can allow a space with piping fittings subject to minor releases to be considered unclassified.
NPT-threaded entry into explosionproof equipment NEC 2023 Section 500.8(E)(1)
Per 500.8(E)(1), a threaded entry that shall be made up with at least five threads fully engaged, with an exception allowing four and one-half threads for listed equipment with factory-threaded entries.
Festoon cable (Article 100, Article 610) NEC 2023 Article 100 — Definition of Cable, Festoon (610)
Single- and multiple-conductor cable intended for use and installation where flexibility is required, such as a trailing cable on a traveling crane.
Portable power feeder cable NEC 2023 Article 100 — Definition of Cable, Festoon (610)
One or more flexible shielded insulated power conductors rated 2001 to 25,000 volts; per 400.49 these cables shall not contain splices.
Multiwire branch circuit NEC 2023 Section 210.4(B)
Per 210.4(B) and (C), a branch circuit that must be provided with a means to simultaneously disconnect all ungrounded conductors at the point where it originates and that shall supply only line-to-neutral loads, with exceptions for single utilization equipment or where all ungrounded conductors are opened simultaneously by the branch-circuit overcurrent device.
Flexible cord overcurrent protection (240.5(B)(3)) NEC 2023 Section 240.5(B)(3)
Flexible cords not smaller than 18 AWG, and tinsel cords or cords of equivalent characteristics of smaller size approved for specific appliances, are considered protected against overcurrent by the branch-circuit overcurrent protective device.
Continuous length rule for flexible cords (400.13) NEC 2023 Section 400.13
Flexible cords shall be used only in continuous lengths without splice or tap when initially installed, though repair of hard-service cord 14 AWG and larger is permitted when spliced per 110.14(B) with the splice retaining the cord's insulation, outer sheath, and usage characteristics.
Type XHHW insulation (Table 310.4(1)) NEC 2023 Table 310.4(1)
An insulation type rated 90°C (194°F) in dry and damp locations and 75°C (167°F) in wet locations.
Stranding requirement (310.3(C)) NEC 2023 Section 310.3(C)
Where installed in raceways, conductors 8 AWG and larger shall be stranded unless specifically permitted or required elsewhere in the Code to be solid.
Supplemental grounding electrode bonding jumper (250.53(E)) NEC 2023 Section 250.53(E)
Where the supplemental electrode is a rod, pipe, or plate, the portion of the bonding jumper that is the sole connection to that electrode is not required to be larger than 6 AWG copper or 4 AWG aluminum/copper-clad aluminum.
Spacing of multiple rod, pipe, or plate electrodes (250.53(A)(3)) NEC 2023 Section 250.53(A)(3)
Where multiple rod, pipe, or plate electrodes are installed to meet the requirements of that section, they shall not be less than 1.8 m (6 ft) apart.

Formulas to Know

Three-phase full-load/service currentI = (kVA × 1000) / (E × 1.732); e.g., 75 kVA at 208 V → 75,000 / 360.26 = 208.2 A; 150 kVA at 480 V → 150,000 / 831.36 = 180.4 A
Single-phase current from VAI = VA / E; e.g., 48,000 VA at 240 V = 200 A; 30 kVA at 240 V = 125 A
Conductor sizing for continuous and noncontinuous loads (branch circuits 210.19(A)(1), feeders 215.4(A)(1), services 230.42(A)(1))Minimum ampacity = noncontinuous load + 125% of continuous load; e.g., 38 A continuous × 1.25 = 47.5 A, plus 55 A noncontinuous = 102.5 A
Motor branch-circuit conductor ampacity (430.22)Ampacity ≥ 125% of motor FLC taken from Table 430.248/430.250 (not nameplate); e.g., 40 HP 460 V 3-phase = 52 A × 1.25 = 65 A; 5 HP 230 V 1-phase = 28 A × 1.25 = 35 A
Motor feeder conductor ampacity (430.24)Ampacity ≥ 125% of largest motor FLC + 100% of the FLCs of all other motors; e.g., 34 A × 1.25 = 42.5 A + 21 A + 14 A = 77.5 A; with a continuous non-motor load add 125% of that load (65 A × 1.25 = 81.25 A plus 30 A × 1.25 = 37.5 A → 118.75 A)
Motor branch-circuit short-circuit and ground-fault protection (Table 430.52 with 430.52(C)(1) Exc. 1)Max device = Table 430.52 percentage × Table 430.250/430.248 FLC, then next standard size per 240.6(A) is permitted where the calculation does not correspond to a standard size: inverse-time CB 150% for wound-rotor (40 A × 1.50 = 60 A) and 250% for squirrel cage (34 A × 2.50 = 85 A → 90 A); time-delay fuse 175% (59.4 A × 1.75 = 103.95 A → 110 A); nontime delay fuse 300% (65 A × 3.00 = 195 A → 200 A)
Pull box minimum dimensions (314.28)Straight pull: length = 8 × trade diameter of largest raceway (8 × 3" = 24"). Angle pull: distance to opposite wall = 6 × trade diameter of largest raceway on that wall + sum of trade diameters of the other raceways on the same wall (6 × 3" = 18" + 2" + 1½" = 21.5")
Voltage dropSingle-phase: VD = (2 × K × I × L) / CM, e.g., (2 × 12.9 × 16 × 60) / 6,530 = 3.79 V. Three-phase: VD = (1.732 × K × I × D) / CM, e.g., (1.732 × 12.9 × 85 × 250) / 105,600 = 4.50 V (K = 12.9 copper; CM from Chapter 9, Table 8)
Generator output conductor sizing (445.13)Ampacity ≥ 115% of generator nameplate current; e.g., 180.4 A × 1.15 = 207.5 A, requiring 4/0 AWG copper THWN (230 A at 75°C) since 3/0 AWG (200 A) is insufficient
Adjusted (corrected) conductor ampacityAdjusted ampacity = Table 310.16 base ampacity × ambient temperature correction × conductor-count adjustment factor; e.g., 2 AWG THHN 90°C = 130 A × 0.91 (40°C) × 0.80 (6 current-carrying conductors) = 94.6 A