Exam Cheat Sheet · Quick Reference

South Carolina Water and Sewer Lines

South Carolina  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
50
Passing score
70%
Exam time
180 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

South Carolina State Portion 50 questions

Safety - Code of Federal Regulations 6 Q · 12%
Excavation cave-in protection systems (sloping, benching, shoring, and shields)Confined space entry permits, atmospheric testing, and rescue proceduresUnderground construction air quality monitoring and ventilation requirementsFall protection systems (guardrail, safety net, and personal fall arrest)Fire protection, flammable liquid storage, and prevention programsPersonal protective equipment selection, use, and employer payment requirementsElectrical safety, ground-fault protection, and wiring requirementsMedical services, first aid, occupational noise, and sanitation requirements
General Knowledge 7 Q · 14%
Trenching equipment selection for soil and site conditionsWater pipe installation methods and materialsSewer pipe installation methods and materialsBackfilling, compaction, and warning tape requirementsWater line pressure testing and bacteriological testingSewer pipe testing methods (water test and air test)Manhole construction and installationPlan reading and profile sheet interpretation
Miscellaneous Engineering - Design Elevations 7 Q · 14%
Reading and interpreting grading plans, contour lines, and profile sheetsUnderstanding design elevations from survey stakes (cut, fill, and slope stakes)Station numbering systems and calculating distances and elevationsComputing cut and fill amounts from finished grade and subgrade elevationsUsing laser levels and GPS to establish and verify design elevationsSetting grade stakes using contour plans and 90-degree layout methodsRoad cross-section and street section elevation details (centerline, edge-of-pavement, ditch, shoulder)
Underground Utilities - Concrete Pipe Installation 12 Q · 24%
Pre-construction ordering and receiving requirements for concrete pipe and box culvertsUnloading, handling, and stockpiling of concrete pipe and box culvert sectionsTrench excavation requirements, trench width limits, and dewateringBedding types and compaction requirements for circular, elliptical, arch pipe, and box culvertsStandard Installation types (Type 1–4) and soil classification categoriesJointing methods and sealant materials for concrete pipeBackfill placement, compaction equipment selection, and minimum cover for construction loadsAcceptance testing methods including soil density, infiltration, exfiltration, air testing, and visual inspection
Underground Utilities - Ductile Pipe Installation 14 Q · 28%
Trench excavation requirements and minimum pipe cover depthPush-on joint and mechanical joint assembly proceduresThrust restraint methods (thrust blocks, restrained joints, tie rods)Pipe receiving, inspection, handling, and storageCorrosive soil identification and polyethylene encasement installationBackfill material requirements and compaction proceduresFlushing, hydrostatic pressure testing, and disinfection of new mainsService taps, valve installation, and fire hydrant installation
Excavating and Grading 4 Q · 8%
Reading and interpreting survey stakes (cut, fill, slope stakes)Plan reading (grading plans, profile sheets, cross-sections, contour lines, station numbers)Grade setting procedures and equipment (eye level, swedes, string lines, laser levels)SC 811 underground utility locate requirements and proceduresAPWA utility color codes and tolerance zone safe digging practicesTrench shoring, shielding, and sloping requirementsSoil compaction methods, testing, and equipment selectionExcavation equipment selection and planning (scrapers, dozers, compactors)

Key Distinctions

Cut shown on a surveyor's information stakevsFill shown on a surveyor's information stake

With a laser level and direct-reading rod, a cut is subtracted from the rod reading while a fill is ADDED to the rod reading before the road section is subtracted.

Excavation and Grading Handbook, Page 97 (Chapter 5 — Using a Laser Level on a Road Project section)
Subgrade elevation marked on the lathvsAggregate base elevation marked on the lath

Subgrade is rod reading ± cut/fill minus the full road section, while the aggregate base elevation adds the thickness of aggregate to be placed back onto that subgrade figure (e.g., 3.85 + 0.60 = 4.45).

Excavation and Grading Handbook, Page 97 (Chapter 5 — Using a Laser Level on a Road Project section)
Bank cubic yardsvsLoose cubic yards

Bank yards are the in-place excavated volume, while loose yards are bank yards increased by the printed swell percentage, and haul-off (truck loads) is figured in loose yards, not bank yards.

Pipe and Excavation Contracting — Ch. 9, Estimating Surface Excavation (bank vs loose yards)
Pipe ends at a 48-inch poured manholevsPipe ends at a precast-ring manhole on large pipe

Bell-and-spigot pipe for a 48-inch poured manhole is set 48 inches apart so a 4-foot form fits between the pipe ends, but for large pipe using precast rings there must be less than 48 inches between pipes so the pipe sides fall inside the ring.

Excavation and Grading Handbook, Page 419
Pipe 14 inches and smaller at a poured manhole bottomvsPipe larger than 14 inches at a poured manhole bottom

With a poured bottom the pipe is normally laid through the manhole, but pipe larger than 14 inches is stopped at the inside face of the manhole on each side.

Excavation and Grading Handbook, Page 444 (Chapter 24 — Manhole Bottoms)
Conventional polyethylene encasementvsV-Bio enhanced polyethylene film

V-Bio (offered beginning in 2013) uses co-extrusion to infuse a corrosion inhibitor and an anti-microbial component into the innermost surface of the film and is the recommended film for ductile iron pipe in corrosive soils, installed per ANSI/AWWA C105/A21.5.

DIPRA Installation Guide for Ductile Iron Pipe, Pages 29 to 30 (Section 2.16 V-Bio Enhanced Polyethylene)
10-point soil evaluation procedurevsDesign Decision Model (DDM)

The 10-point system addresses the likelihood of corrosion, while the DDM is a two-dimensional risk-based extension that also weighs the consequences of a pipeline failure in selecting a mitigation strategy (it extends but does not invalidate the 10-point system).

DIPRA Installation Guide for Ductile Iron Pipe, Pages 28 to 29 (Section 2.15 Corrosive Soil)
Oxygen enriched atmospherevsOxygen deficient atmosphere

Enriched means more than 23.5 percent oxygen by volume; deficient means less than 19.5 percent — either is a hazardous atmosphere under the confined spaces standard.

29 CFR 1926, §1926.1202
Hydrostatic test of flammable liquid pipingvsPneumatic test of flammable liquid piping

Before being covered, enclosed, or placed in use, piping is hydrostatically tested to 150 percent of maximum anticipated pressure, or pneumatically tested to 110 percent of maximum anticipated pressure but not less than 5 psig at the highest point.

29 CFR 1926, §1926.152(j)(7)
Nominal installed guardrail top rail height (42 inches)vsMinimum deflected top edge height (39 inches)

42 inches is the nominal installed top rail height, while 39 inches is the height below which the top edge may not deflect when the 200-pound downward load is applied within 2 inches of the top edge.

OSHA 29 CFR 1926, §1926.502(b)(4)
Positioning device system anchoragevsPersonal fall arrest system anchorage

A positioning device anchorage must support at least twice the potential impact load or 3,000 pounds, whichever is greater; personal fall arrest anchorage is 5,000 pounds per employee.

29 CFR 1926, §1926.502(e)(2)
Laying Condition Type 2 / Type 4 / Type 5vsLaying Condition Type 3

Type 3 is pipe bedded in 4-inch minimum loose soil with backfill lightly consolidated to the top of the pipe, whereas Type 2 is a flat-bottom trench consolidated only to pipe centerline, Type 4 is granular bedding to 1/8 pipe diameter with backfill at about 80 percent Standard Proctor, and Type 5 is compacted granular bedding to centerline with backfill at about 90 percent Standard Proctor.

DIPRA Installation Guide for Ductile Iron Pipe, Page 43 (Section 3.1 Standard Laying Conditions)
Cat 815 compactorvsCat 825 compactor

Rule of thumb for subdivision fills: a Cat 815 when daily fill hauled is 4,500 cubic yards or less, and a Cat 825 for 4,500 to 8,000 cubic yards per day.

Excavation and Grading Handbook, Page 160 (Chapter 9 — Compactors section)
Temporary LP-Gas heater clearance (6 feet)vsBlower and radiant type heater aiming restriction (20 feet)

Heaters other than integral heater-container units must be located at least 6 feet from any LP-Gas container, while blower and radiant type heaters shall not be directed toward any LP-Gas container within 20 feet.

OSHA 29 CFR 1926, §1926.153(h)(13)

Key Terms

Tolerance Zone (SC) SC 811 Excavator Manual (2026), Page 28 (Tolerance Zone & Safe Digging Practices)
Where the facility diameter is known, one-half of the known diameter plus twenty-four inches on either side of the designated center line of the facility.
Pre-marking SC 811 Excavator Manual (2026), Page 22 (Pre-marking / Positive Response)
Marking the excavation site when it cannot be clearly identified within the area described in the locate notice, done exclusively with white paint, flags, or stakes (other colors are reserved for utility types under the APWA Uniform Color Code).
Normal locate request life (SC) SC 811 Excavator Manual (2026), Pages 9, 16 (Locate Request Timeline)
Notice given to the notification center expires within fifteen working days after the date of notice, and no excavation or demolition may continue after that period without a subsequent notice.
Locator response time (SC) SC 811 Excavator Manual (2026), Page 9 (Locate Request Timeline)
Locators have 3 full working days to respond to a normal locate request after it is processed, with the life of the request beginning the day after the request is made at 12:00 am.
Subaqueous excavation notice SC 811 Excavator Manual (2026), Page 16 (Subaqueous Excavation)
Notice to member operators at least 10 full working days in advance of work under a body of water, not counting the day the notice is submitted, weekends, or holidays.
'No Show' secondary action SC 811 Excavator Manual (2026), Pages 18, 23 (Secondary Actions)
When a member utility has not responded in Positive Response but there are indications of its facility in the area, the excavator must contact SC811 for a 'No Show' and allow an additional three hours for the operator/locator to mark the facility.
Parallel-type excavation within the tolerance zone SC 811 Excavator Manual (2026), Page 30 (Tolerance Zone & Safe Digging Practices)
Excavation in which the existing facility must be visually identified at intervals not to exceed 50 feet, or at any change in direction of the facility, along the line of excavation.
Canceled entry permit retention 29 CFR 1926, Subpart AA, §1926.1205(f)
The entry employer must retain each canceled entry permit for at least 1 year to facilitate review of the permit-required confined space program, with any problems encountered during entry noted on the pertinent permit.
Alternate entry procedures atmospheric testing order 29 CFR 1926, §1926.1203(e)(2)(iii)
Before entry under alternate procedures, the internal atmosphere is tested with a calibrated direct-reading instrument for oxygen content, then flammable gases and vapors, then potential toxic air contaminants, in that order.
Inerting 29 CFR 1926, §1926.1204(c)(4)
Where purging and ventilating cannot bring flammable vapor below 10 percent of the LFL, entry is allowed only if the employer inerts the space so the entire atmosphere is non-combustible, employees use appropriate PPE for other atmospheric hazards such as the resulting oxygen deficiency, and all physical hazards are eliminated or isolated.
Pull (curved alignment) Concrete Pipe and Box Culvert Installation, Concrete Pipe Installation Manual — Jointing / Curved Alignment section (Pages 46-47)
On a curved sewer alignment laid with deflected straight pipe, the difference between the home joint space and the opened joint space; the maximum permissible pull is obtained from the pipe manufacturer.
Boot Excavation and Grading Handbook, Page 75 — Setting Boots
A horizontal line marked on a lath an even number of feet above the finished grade the surveyor staked (boots are routinely placed and marked next to cut and fill stakes); on a cut the cut is subtracted from the boot height and on a fill the fill is added. Where an obstruction blocks the line of sight a taller boot, such as a 5-foot boot, may be used instead of the usual 4-foot boot; a 6-foot boot is never used because it is too high to shoot to.
Manhole vacuum test Excavation and Grading Handbook, Pages 453 to 454 (Constructing Manholes)
Test of a completed manhole with barrels set and joints sealed in which the vacuum plate's outer ring (a special bald tire) is inflated to 45 pounds to seal the manhole, which must then hold a one-pound vacuum for one minute with both pipe ends plugged.
Shovel-handle cure test (poured manhole walls) Excavation and Grading Handbook, Page 449
On a warm day when time is an issue, about three hours of curing should be enough before pulling inner forms; if a shovel handle banged against the concrete sinks in or dents it, do not pull the forms.
Pipe tongs (patented lifting clamps) DIPRA Installation Guide for Ductile Iron Pipe, Pages 13 to 14 (Section 1.6 Pipe Tongs)
Lifting clamps for ductile iron pipe that require care near trenches with bracing protruding above ground, because pipe contact with the bracing may cause the tongs to release the pipe prematurely (ice on the holding pads is a separate cold-weather caution causing slippage).
Filler piece (new valve in an existing main) DIPRA Installation Guide for Ductile Iron Pipe, Page 66 (Section 4.4 New Valves in Existing Mains)
A piece of pipe used to fill the gap inside a solid sleeve so the valve is held firmly in place and thrust will not push the valve along the line.
Push-on joint standardized outside diameter DIPRA Installation Guide for Ductile Iron Pipe, Page 50 (Section 3.6 Push-on Joints)
Push-on joint pipe has been manufactured with a standard outside diameter for each nominal size as of 1962; older pit-cast pipe came in classifications A, B, C, and D, each usually with a different OD, so existing pipe must be measured to determine if a transition coupling or specially sized gasket is needed.
Laser line and grade (gravity sewer) Concrete Pipe and Box Culvert Installation, Concrete Pipe Installation Manual — Installation / Line and Grade section (Page 12)
A helium-neon laser beam serves as a continuous, uninterrupted string line that does not sag and can be used for distances up to 1,000 ft (90 to 150 m).
Gasket stretch equalization Concrete Pipe and Box Culvert Installation, Concrete Pipe Installation Manual — Jointing / Install Gasket section (Page 41)
After fitting the gasket carefully into the spigot recess, equalize rubber gasket stretch by running a smooth, round object inserted between gasket and spigot around the entire circumference several times; unequal stretch can bunch the gasket, causing leaks or cracking the bell.
Open yard combustible storage 29 CFR 1926, §1926.151(c)
Combustible materials in open yard storage shall be piled no higher than 20 feet, with driveways between and around piles at least 15 feet wide and kept free of rubbish, and a maximum grid system unit of 50 feet by 150 feet.

Formulas to Know

Subgrade and aggregate base elevations from a laser rod reading when the stake shows a FILLSubgrade = rod reading on hub + fill − road section thickness (e.g., 3.50 + 0.70 − 0.75 = 3.45; 4.20 + 0.50 − 0.85 = 3.85). Aggregate base = subgrade + thickness of aggregate to be placed (3.85 + 0.60 = 4.45). On a cut, the cut is subtracted instead of added.
Boot line distance measured up the lath from the surveyor's hubOn a cut: boot height − cut (5.00 − 2.45 = 2.55 ft; a 4-ft boot on the same stake = 1.55 ft). On a fill: boot height + fill (2.45 + 5.00 = 7.45 ft).
Resultant thrust at pressures other than 100 psiThrust = tabulated 100-psi thrust × (operating pressure ÷ 100); e.g., 19,353 lb × (150/100) = 29,030 lb for a 12-in. 90-degree bend (the guide's own example at 125 psi gives 24,191 lb).
Trench excavation in bank cubic yards (trench run on the outside perimeter)Length = 2 × (long side + short side); Bank cu yd = length × width × depth ÷ 27. Example: 2 × (40 + 28) = 136 ft × 2.5 ft × 2 ft = 680 cu ft ÷ 27 = 25.19 cu yd; 2 × (40 + 24) = 128 ft × 2.5 × 2 = 640 ÷ 27 = 23.70 cu yd.
Loose cubic yards from bank yards and printed swellLoose cu yd = bank cu yd × (1 + swell%). Examples: 25.19 × 1.30 = 32.74; 23.70 × 1.25 = 29.63; 512.00 × 1.20 = 614.40; 388.89 × 1.20 = 466.67; 456.00 × 1.20 = 547.20.
Truck loads for haul-off (figured in loose yards)Loads = loose cu yd ÷ truck capacity, rounded UP to the next whole load. Examples: 32.74 ÷ 12 = 2.73 → 3; 29.63 ÷ 14 = 2.12 → 3; 614.40 ÷ 10 = 61.44 → 62; 466.67 ÷ 12 = 38.89 → 39; 547.20 ÷ 14 = 39.09 → 40. Dividing bank volume by truck size under-counts loads.
Extra loose yards when swell increases by 10 percentage pointsAdditional loose cu yd = bank cu yd × 0.10. Examples: 25.19 × 0.10 = 2.52; 23.70 × 0.10 = 2.37; 512.00 × 0.10 = 51.20; 388.89 × 0.10 = 38.89; 456.00 × 0.10 = 45.60.
Basement excavation footprint and bank volume (with overdig on each side)Footprint = (length + 2 × overdig) × (width + 2 × overdig); Bank cu yd = footprint × depth ÷ 27. Examples: (44+4) × (28+4) = 1,536 sq ft × 9 ft = 13,824 ÷ 27 = 512.00 cu yd; (44+6) × (24+6) = 1,500 sq ft × 7 ft = 10,500 ÷ 27 = 388.89 cu yd; (32+6) × (30+6) = 1,368 sq ft × 9 ft = 12,312 ÷ 27 = 456.00 cu yd.
Average lot elevation and fill volume to a uniform finished gradeAverage elevation = sum of the four corner spot elevations ÷ 4 (e.g., (4.00+3.00+2.00+3.00) ÷ 4 = +3.00'); maximum elevation difference = highest corner − lowest corner (4.00 − 2.00 = 2.00'); Fill cu yd = lot area × (finished elev − average existing elev) ÷ 27 (6,000 sf × 1.00' = 6,000 cf ÷ 27 = 222.2 cy).
Site plan setbacks and corner-to-corner diagonalEqual side setback = (lot dimension − house dimension) ÷ 2 (e.g., (78 − 42) ÷ 2 = 18'-0"); Rear yard = lot depth − front setback − house depth (110 − 24 − 30 = 56'-0"); Diagonal = √(front setback² + side setback²) = √(24² + 18²) = √900 = 30'-0".