South Carolina Water and Sewer Lines Exam at a Glance
Here are the exam's key facts from the official bulletin:
| Questions | 50 scored questions plus up to 10 unscored experimental questions that count against your time |
| Time limit | 3 hours |
| Passing score | 35 correct answers out of 50 scored questions |
| Books in the exam room | Open book |
| Exam fee | $64 |
On exam day
- One valid, unexpired signature- and photo-bearing government ID matching the registered legal name is required at the test site.
- Candidates should arrive at the examination site at least 30 minutes before their appointment.
- Reference books may be highlighted, underlined and indexed, but must be otherwise unmarked (not written in) and may not contain additional papers, loose or attached. References may be tabbed with permanent tabs only. Proctors inspect all books before and after the examination.
- Books may be highlighted, underlined and indexed but not written in, and only permanent tabs that would tear the page if removed are allowed.
- Only silent, battery-operated, non-programmable calculators without paper tape printing or an alphabetic keyboard are allowed.
- Only approved items may be taken into the examination room and all personal belongings, including electronic devices, writing devices, reading material, food and drinks, must be stored in the secure storage provided.
References you may bring
- Code of Federal Regulations - 29 CFR Part 1926 (OSHA) (with latest available amendments)
- Code of Federal Regulations - 29 CFR Part 1926 Selections by PSI (with latest available amendments)
- DIPRA Installation Guide for Ductile Iron Pipe (2007 (revised 2021))
- Concrete Pipe & Box Culvert
- Excavation and Grading Handbook (2006)
- South Carolina 811 Excavator Manual (latest edition)
Scheduling, changes and retakes
- Candidates schedule online at https://test-takers.psiexams.com/sccon or by calling PSI at (855) 340-3701.
- Minimum qualification must be met before registering, and the Registration Confirmation Notice issued after PSI approval is valid for one year or until an examination classification has been failed twice within the referenced time frame.
- Candidates may cancel and reschedule without forfeiting the fee if notice is received 2 days before the examination date, and voice mail or email is not acceptable notice.
- Candidates who fail to cancel on time, do not appear, arrive after the examination start time, or lack proper ID have their registration invalidated and forfeit the examination fee.
- Results are given immediately on screen, with a performance summary for passers and a printed diagnostic report for those who fail.
- Each classification examination (except Burglar and Fire Alarm) may be taken only twice in a 12-month period and thereafter only once in six months, and a passed exam may not be retaken.
- After passing the required examinations, the candidate submits the commercial license application with the documented experience affidavit.
Source: Commercial Contractor Candidate Information Bulletin, Updated 9/15/2026. Check the bulletin before test day: fees and rules can change.
What the South Carolina Water and Sewer Lines Exam Covers
The official content outline has 6 topics:
| Topic | Questions | Share of the exam |
|---|---|---|
| Safety - Code of Federal Regulations | 6 | 12% |
| General Knowledge | 7 | 14% |
| Miscellaneous Engineering - Design Elevations | 7 | 14% |
| Underground Utilities - Concrete Pipe Installation | 12 | 24% |
| Underground Utilities - Ductile Pipe Installation | 14 | 28% |
| Excavating and Grading | 4 | 8% |
How to Prepare for the South Carolina Water and Sewer Lines Exam
Start with the books. This is an open-book exam, so the references on the bulletin's list are your main study tool. Get the editions the bulletin names.
Learn where things are. Read the table of contents and the index of each book until you know where every major subject lives. On test day, finding an answer fast matters more than memorizing it.
Highlight the sections you use most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
Spend most of your time on the biggest topics. Underground Utilities - Ductile Pipe Installation and Underground Utilities - Concrete Pipe Installation make up 52% of the exam.
Take timed practice exams. The clock trains you to find answers at the pace the real exam needs: about 3 minutes per question.
Aim to pass more than once. One passing score can be luck. Several in a row means you're ready.
Reference Books for the South Carolina Water and Sewer Lines Exam
The Water and Sewer Lines references are 29 CFR Part 1926 (OSHA) or the PSI Selections, the DIPRA Installation Guide for Ductile Iron Pipe, Concrete Pipe & Box Culvert, the Excavation and Grading Handbook, and the South Carolina 811 Excavator Manual.
Where to get them:
- OSHA 29 CFR 1926
- Excavation & Grading Handbook
- SC 811 Excavator Manual (2026)
- DIPRA Installation Guide for Ductile Iron Pipe
- Concrete Pipe and Box Culvert Installation
On Test Day
- Go through the whole exam first. Answer every question you know and bookmark the ones you don't. Every exam lets you come back to bookmarked questions, but some lock the questions you've seen once you take a break, so work your bookmarks before any break.
- Then go back to your bookmarks and work them out.
- Don't let one question eat your time. You have 3 hours for 50 scored questions plus up to 10 unscored experimental questions that count against your time, which is about 3 minutes per question.
- Before you finish, answer anything you skipped. A blank can't earn a point.
Study Tips
Take this practice exam several times. The goal is to consistently clear your exam's passing score — often around 70–75% — so passing feels routine before you walk into the real test.
Only select answers that directly respond to the question asked—not ones that merely sound correct or seem true. After choosing, verify your answer against the question to confirm you didn't misread it and that your selection genuinely addresses what was asked.
Read each answer choice in order. If it seems correct, mark it as your current best. Each subsequent choice must beat your current best to replace it. Keep going until you've reviewed all choices, then verify your final selection actually answers the question.
There's no hidden pattern in the answer key. If you've picked "A" four times in a row, the fifth answer can still be "A." Judge each question on its own and ignore the letter sequence.
Be alert to hedging words like likely, may, can, sometimes, usually, generally, and rarely—question writers use them to account for exceptions. An answer choice is often wrong simply because it allows no exceptions. Similarly, avoid choices containing absolute terms like exactly and always.
Sample South Carolina Water and Sewer Lines Practice Questions
These questions come from our practice question bank, each with its answer and reference.
Sample 1 — Miscellaneous Engineering - Design Elevations
Question: Rough grading is complete on a very large parking lot with few islands, and you decide to lay out a grid of hubs on both the plan and the ground so the finish grade can be set with a laser level. At approximately what spacing should the grid lines intersect?
- A. 50 feet
- B. 25 feet
- C. 100 feet
- D. 75 feet
Correct Answer: B
Per the Excavation & Grading Handbook (Chapter 5, 'Using a Laser Level for Parking Lots'), the grid lines should intersect about every 25 feet. A hub is driven at each intersection, the design elevation for each point is computed and marked on the grid plan, and then each hub is driven to grade using the laser. The grid method is only worthwhile on very large surfaces; on lots broken up by ridges, swales, curbs and planters, sweding grades is often faster.
Reference: Excavation and Grading Handbook, Page 94 — Using a Laser Level for Parking Lots
Sample 2 — Safety - Code of Federal Regulations
Question: When testing the atmosphere inside a permit-required confined space before entry, what is the correct order for testing atmospheric hazards?
- A. Toxic gases and vapors, then oxygen content, then combustible gases and vapors
- B. Combustible gases and vapors, then oxygen content, then toxic gases and vapors
- C. Toxic gases and vapors, then combustible gases and vapors, then oxygen content
- D. Oxygen content, then combustible gases and vapors, then toxic gases and vapors
Correct Answer: D
Per 29 CFR 1926.1204(e)(3), when testing for atmospheric hazards in a permit-required confined space, the employer must test first for oxygen, then for combustible gases and vapors, and then for toxic gases and vapors, in that order.
Reference: 29 CFR 1926, §1926.1204(e)(3)
Sample 3 — Excavating and Grading
Question: An air test on a completed sewer main has failed and the test plugs have been ruled out as the source. You pull the special inflatable leak-locating plugs into the line, inflate them to form a sealed chamber, and pressurize the chamber. How long must the chamber pressure be held, and how far are the plugs moved downstream before each repeat test?
- A. 2 minutes; 20 feet
- B. 5 minutes; 20 feet
- C. 10 minutes; 15 feet
- D. 2 minutes; 19 feet
Correct Answer: D
The Excavation and Grading Handbook (Chapter 22, Air Testing/Locating Leaks, Page 415) explains that the test plugs are usually 20 feet apart, the chamber is filled to the specified pressure and held two minutes, and if it holds, the plugs are released and pulled downstream 19 feet before repeating the test — the 1-foot overlap ensures no length goes untested.
Reference: Excavation and Grading Handbook, Page 415 (Chapter 22 — Air Testing/Locating Leaks section)
Sample 4 — Underground Utilities - Ductile Pipe Installation
Question: A delivery of polyethylene-encased ductile iron pipe is being unloaded on your project. After the padded sling is removed, your crew inspects the encasement and finds the film torn where the sling bore against it. How should this damage be repaired before the pipe is installed?
- A. Polyethylene tape or taped-on film
- B. Brushed-on asphalt mastic coating
- C. Troweled cement-mortar patch
- D. Bituminous primer and seal coat
Correct Answer: A
Per the DIPRA Installation Guide, Section 1.7 (Special Exterior Coatings), handling devices used on pipe with special exterior coatings should be padded, the coating inspected for damage once the handling device is removed, and for polyethylene-encased pipe the damage repaired with polyethylene tape or by taping a section of polyethylene film over the damaged area. A troweled mortar patch is the repair for damaged cement-mortar lining (Section 1.1), not for polyethylene encasement.
Reference: DIPRA Installation Guide for Ductile Iron Pipe, Page 14 (Section 1.7 Special Exterior Coatings)
Why Practice Online Instead of With a PDF
A PDF shows you questions. It doesn't show you the clock. Our practice exams are timed and on a screen, so you practice finding answers under time pressure, not just reading them. Each attempt draws a new set of questions from our bank, and your results break the score down by outline topic so you know what to study next.
Start Practicing
Take the free South Carolina Water and Sewer Lines practice exam to see where you stand, then work through the topics that need attention. For the official rules, read the exam bulletin, and see the licensing board's website.