South Carolina · PSI

South Carolina Water and Sewer Lines Practice Exam

50 questions 180 minutes 70% to pass 6 topics 3:36 per question Open book 259 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$5.95

Complete exam simulation matching the real PSI test format.

  • 50 questions (same as real exam)
  • 180 minute time limit
  • 6 topic areas covered
  • 259 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 6 topic quizzes and this full exam. $59.95/month.
See the study course

South Carolina Water and Sewer Lines Practice Exam Guide

Built from the official PSI exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 50
Underground Utilities - Ductile Pipe Installation14
Underground Utilities - Concrete Pipe Installation12
General Knowledge7
Miscellaneous Engineering - Design Elevations7
Safety - Code of Federal Regulations6
Excavating and Grading4

This practice exam follows the official content outline for the South Carolina Water and Sewer Lines exam: Safety - Code of Federal Regulations, General Knowledge, Miscellaneous Engineering - Design Elevations, Underground Utilities - Concrete Pipe Installation, Underground Utilities - Ductile Pipe Installation, Excavating and Grading.

You have two ways to practice. The free practice exam gives you 10 questions per attempt, and you can retake it as often as you like. The full practice exam gives you 50 questions on a 3 hours clock, with a new draw from our question bank every attempt.

6 topics

Safety - Code of Federal Regulations 6 items

Our study plan for this topic: Excavation cave-in protection systems (sloping, benching, shoring, and shields); Confined space entry permits, atmospheric testing, and rescue procedures; Underground construction air quality monitoring and ventilation requirements; Fall protection systems (guardrail, safety net, and personal fall arrest); Fire protection, flammable liquid storage, and prevention programs; Personal protective equipment selection, use, and employer payment requirements; Electrical safety, ground-fault protection, and wiring requirements; Medical services, first aid, occupational noise, and sanitation requirements.

General Knowledge 7 items

Our study plan for this topic: Trenching equipment selection for soil and site conditions; Water pipe installation methods and materials; Sewer pipe installation methods and materials; Backfilling, compaction, and warning tape requirements; Water line pressure testing and bacteriological testing; Sewer pipe testing methods (water test and air test); Manhole construction and installation; Plan reading and profile sheet interpretation.

Miscellaneous Engineering - Design Elevations 7 items

Our study plan for this topic: Reading and interpreting grading plans, contour lines, and profile sheets; Understanding design elevations from survey stakes (cut, fill, and slope stakes); Station numbering systems and calculating distances and elevations; Computing cut and fill amounts from finished grade and subgrade elevations; Using laser levels and GPS to establish and verify design elevations; Setting grade stakes using contour plans and 90-degree layout methods; Road cross-section and street section elevation details (centerline, edge-of-pavement, ditch, shoulder).

Underground Utilities - Concrete Pipe Installation 12 items

Our study plan for this topic: Pre-construction ordering and receiving requirements for concrete pipe and box culverts; Unloading, handling, and stockpiling of concrete pipe and box culvert sections; Trench excavation requirements, trench width limits, and dewatering; Bedding types and compaction requirements for circular, elliptical, arch pipe, and box culverts; Standard Installation types (Type 1–4) and soil classification categories; Jointing methods and sealant materials for concrete pipe; Backfill placement, compaction equipment selection, and minimum cover for construction loads; Acceptance testing methods including soil density, infiltration, exfiltration, air testing, and visual inspection.

Underground Utilities - Ductile Pipe Installation 14 items

Our study plan for this topic: Trench excavation requirements and minimum pipe cover depth; Push-on joint and mechanical joint assembly procedures; Thrust restraint methods (thrust blocks, restrained joints, tie rods); Pipe receiving, inspection, handling, and storage; Corrosive soil identification and polyethylene encasement installation; Backfill material requirements and compaction procedures; Flushing, hydrostatic pressure testing, and disinfection of new mains; Service taps, valve installation, and fire hydrant installation.

Excavating and Grading 4 items

Our study plan for this topic: Reading and interpreting survey stakes (cut, fill, slope stakes); Plan reading (grading plans, profile sheets, cross-sections, contour lines, station numbers); Grade setting procedures and equipment (eye level, swedes, string lines, laser levels); SC 811 underground utility locate requirements and procedures; APWA utility color codes and tolerance zone safe digging practices; Trench shoring, shielding, and sloping requirements; Soil compaction methods, testing, and equipment selection; Excavation equipment selection and planning (scrapers, dozers, compactors).

3 questions

Sample 1 — Underground Utilities - Ductile Pipe Installation

Question: As the contractor, you are setting a 12-inch gate valve inside a concrete vault on a water transmission main. The main must pass through the vault wall. What minimum clearance must be provided between the concrete wall and the pipe so the weight of the vault is not carried by the main?

  • A. 1 inch
  • B. 4 inches
  • C. 1/2 inch
  • D. 2 inches

Correct Answer: D

Per Section 4.2 (Installing Valves) of the DIPRA installation guide, when valves are placed in concrete or masonry vaults, wall penetrations should incorporate a space of at least 2 inches between the concrete and the pipe so the weight of the vault does not rest on the water main.

Reference: DIPRA Installation Guide for Ductile Iron Pipe, Page 65 (Section 4.2 Installing Valves)

Sample 2 — Underground Utilities - Concrete Pipe Installation

Question: A mastic compression joint sealant specified for a concrete pipe storm sewer consists of which materials?

  • A. Butyl rubber laminated to polyethylene sheet
  • B. Rubber compounds or bitumen with mineral filler
  • C. Portland cement paste, sand and water
  • D. Vulcanized elastomer formed as an O-ring

Correct Answer: B

The Mastic portion of the Jointing section states that mastic sealants consist of rubber compounds or bitumen and inert mineral filler, usually applied at ambient temperatures, with enough sealant used to fill the annular joint space with some squeeze out.

Reference: Concrete Pipe and Box Culvert Installation, Concrete Pipe Installation Manual — Jointing / Mastic section (Page 42)

Sample 3 — General Knowledge

Question: Your crew has set all the precast barrels on a new sewer manhole, mortared and taped the joints, and plugged both pipe ends inside the manhole. The inflatable seal on the vacuum plate has been pressurized and the vacuum drawn. To pass the test, what vacuum must the manhole hold, and for how long?

  • A. 1 pound held for one minute
  • B. 2 pounds held for two minutes
  • C. 5 pounds held for one minute
  • D. 3 pounds held for five minutes

Correct Answer: A

Per the Excavation & Grading Handbook, Chapter 24 (Setting the Barrels, Page 453-454), a completed manhole is vacuum tested after the barrels are set and the joints are mortared and taped. The outer ring of the vacuum plate (a special bald tire) is inflated to 45 pounds to create the airtight seal, and to pass the test the manhole must hold a one-pound vacuum for one minute. Both pipe ends must be plugged first so the pipe is not being tested along with the manhole.

Reference: Excavation and Grading Handbook, Pages 453-454 (Chapter 24 — Setting the Barrels)

Treat your first attempt as a checkup, not a verdict. After every attempt, the results page breaks your score down by outline topic, so you can see which topics need work. Compare your score with the real exam's passing score, 35 correct answers out of 50 scored questions, and keep practicing until you pass consistently.

  • Answer what you know first. Go through every question once, answer the ones you know, and bookmark the rest. Our practice exams let you bookmark and come back.
  • Come back to your bookmarks. Work them out on your second pass.
  • Watch your pace. The real exam works out to about 3 minutes per question.
  • Look up every miss. After each attempt, find each missed question's reference in your book and read the section.

Questions 50 scored questions plus up to 10 unscored experimental questions that count against your time
Time limit 3 hours
Passing score 35 correct answers out of 50 scored questions
Books in the exam room Open book
Exam fee $64
  • Results are given immediately on screen, with a performance summary for passers and a printed diagnostic report for those who fail.
  • Each classification examination (except Burglar and Fire Alarm) may be taken only twice in a 12-month period and thereafter only once in six months, and a passed exam may not be retaken.

Source: Commercial Contractor Candidate Information Bulletin, Updated 9/15/2026. Check the bulletin before test day: fees and rules can change.

10 free questions30 min · no account