Exam Cheat Sheet · Quick Reference

South Carolina Water and Sewer Plants

South Carolina  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
50
Passing score
70%
Exam time
180 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

South Carolina State Portion 50 questions

Safety - Code of Federal Regulations 4 Q · 8%
Excavation and trench safety requirements (cave-in protection, sloping, shoring, and shields)Confined space entry procedures and permit-required confined space programsFall protection systems (guardrail systems, personal fall arrest systems, and safety nets)Fire protection and prevention on construction sites (extinguisher ratings, flammable liquid storage, and ignition hazard controls)Electrical safety (ground-fault protection, grounding, wiring design, and working clearances)Occupational health and environmental controls (permissible exposure limits, noise, ventilation, and medical/first aid services)Underground construction safety (air monitoring, ventilation, gassy operations, and emergency provisions)Personal protective equipment selection, use, and employer payment requirements
General Plant Construction 20 Q · 40%
Trench excavation methods, equipment selection, and soil conditionsPipe bedding requirements and laying conditions (Types 1–5)Ductile iron pipe joint assembly (push-on, mechanical, and flanged joints)Backfill procedures, compaction standards, and material requirementsHydrostatic pressure testing and leakage allowances for water mainsPipeline disinfection methods (tablet, continuous-feed, and slug)Thrust restraint methods (thrust blocks, restrained joints, and tie rods)Manhole construction, barrel setting, and vacuum testingTrenching and Pipe LayingConstructing ManholesChapter 1 - Receiving and HandlingChapter 2 - The Trench +6 more
Concrete 6 Q · 12%
Concrete mixture design and proportioning (w/cm ratio, strength requirements, exposure categories)Properties of fresh concrete (workability, consistency, bleeding, air entrainment)Concrete durability (freeze-thaw resistance, sulfate attack, permeability, abrasion/erosion)Placing, finishing, and consolidation of concrete (subgrade preparation, formwork, depositing methods)Curing methods and materials (wet curing, curing compounds, duration, temperature requirements)Portland and blended cements and supplementary cementitious materials (types, properties, SCMs)Concrete imperfections and volume changes (cracking types, drying shrinkage, plastic shrinkage, remedies)Hot and cold weather concreting (temperature effects, precautions, strength development)Placing and Finishing ConcreteCuring ConcreteSpecifying, Designing, and Proportioning Concrete MixturesDurability +3 more
Concrete - Reinforcing Steel 6 Q · 12%
Purpose of reinforcing steel in concrete (tension, compression, shear resistance)Reinforcing bar sizes, grades, and ASTM specificationsDeformed bar identification markings and grade marksStandard hooks, bend shapes, and fabrication tolerancesConcrete cover requirements and placement tolerancesTypes of splices: lap, mechanical, and weldedBar supports: types, selection, and placementUnloading, storing, handling, and hoisting reinforcing bars at the jobsite
Excavating and Grading 8 Q · 16%
Reading and interpreting survey stakes (cut, fill, slope stakes)Plan reading (grading plans, profile sheets, cross sections, contour lines, station numbers)Grade setting procedures (boots, hubs, swedes, string lines, eye levels)Laser levels and GPS equipment for grade controlSC 811 underground utility locate requirements and proceduresTrench safety (shoring, shields, sloping, depth requirements)Soil compaction methods, testing, and standardsTrenching and pipe laying (water and sewer lines, bedding, backfill)
Miscellaneous Engineering - Design Elevations 6 Q · 12%
Reading and interpreting grading plans, contour lines, and lot pad elevationsReading profile sheets and plan-and-profile drawings for underground utilities and pipe elevationsReading road survey stakes (cut stakes, fill stakes, slope stakes) and surveyor notationInterpreting street cross-section drawings including subgrade, aggregate base, and pavement elevationsSetting grade stakes and hubs using cut/fill calculations from surveyor informationUsing laser levels and direct-reading rods to establish and verify design elevationsReading and staking contour plans for finished grade elevationsGPS-based grade control and design elevation monitoring on grading equipmentPlan ReadingGrade SettingUnderstanding Road Survey StakesGrading with Lasers, GPS and Other Specialized Equipment

Key Distinctions

Single horizontal line on a surveyor's information stakevsDouble horizontal line on a surveyor's information stake

A double line means 'and then' — everything below it is measured from the RS/RP point — while with only a single line (or no double line) all grades and distances are measured from the surveyor's hub beside the information stake.

Excavation and Grading Handbook, Chapter 1 — Cut Stakes section (Page 9)
Surveyor shows a CUTvsSurveyor shows a FILL

With a laser level and direct-reading rod the cut is subtracted from the rod reading, but a fill is ADDED to the rod reading before the road section is subtracted (and on a boot, a cut is subtracted from the boot height while a fill is added to it).

Excavation and Grading Handbook, Page 97 (Chapter 5 — Using a Laser Level on a Road Project section)
Bank cubic yardsvsLoose cubic yards

Bank yards are the in-place excavation volume (L × W × D ÷ 27), while loose yards are the swelled hauled volume (bank × [1 + swell %]), and haul-off truck loads must be figured on loose yards because dividing bank volume by truck size under-counts loads.

Pipe and Excavation Contracting — Ch. 9, Estimating Surface Excavation (bank vs loose yards)
Oxygen enriched atmospherevsOxygen deficient atmosphere

Per 29 CFR 1926.1202, oxygen enriched means more than 23.5 percent oxygen by volume and oxygen deficient means less than 19.5 percent; either is a hazardous atmosphere under the confined spaces standard.

29 CFR 1926, §1926.1202
Pipe gap for a 48-inch poured manholevsPipe gap for a precast-ring manhole

Bell-and-spigot pipe for a 48-inch poured manhole is set 48 inches apart so a 4-foot form fits between the pipe ends, but for large pipe using precast rings there must be LESS than 48 inches between pipes so the pipe sides fall inside the ring.

Excavation and Grading Handbook, Page 419
Curb hub offset for hand formingvsCurb hub offset for a slip-form concrete machine

The normal minimum offset from hub to back-of-curb is 2 feet for forming, but when a concrete machine is used on a Type 2 or Type 1-A curb the surveyors must set a 3-foot offset to back-of-curb for the men and machine.

Excavation and Grading Handbook, Pages 287 and 289 (Chapter 17 — Curb Stakes / Cutting Curb Grade)
Cat 815 compactorvsCat 825 compactor

Rule of thumb for subdivision fills: a Cat 815 when daily fill hauled is 4,500 cubic yards or less, and a Cat 825 for 4,500 to 8,000 cubic yards per day.

Excavation and Grading Handbook, Page 160 (Chapter 9 — Compactors section)
Type 2 / Type 3 laying conditionsvsType 4 / Type 5 laying conditions

Per ANSI/AWWA C150/A21.50, Type 2 is a flat-bottom trench with backfill lightly consolidated only to the pipe centerline and Type 3 is pipe bedded in 4-inch minimum loose soil with backfill lightly consolidated to the top of pipe, while Type 4 requires sand, gravel or crushed stone bedding to 1/8 pipe diameter with backfill compacted to approximately 80 percent Standard Proctor and Type 5 requires compacted granular bedding to the pipe centerline with backfill at approximately 90 percent Standard Proctor.

DIPRA Installation Guide for Ductile Iron Pipe, Page 43 (Section 3.1 Standard Laying Conditions)
Conventional polyethylene encasementvsV-Bio enhanced polyethylene (offered beginning 2013)

V-Bio uses co-extrusion to infuse a corrosion inhibitor and an anti-microbial component into the innermost surface of the film and is the recommended film for ductile iron pipe in corrosive soils, installed per ANSI/AWWA C105/A21.5.

DIPRA Installation Guide for Ductile Iron Pipe, Pages 29 to 30 (Section 2.16 V-Bio Enhanced Polyethylene)
Standard-cured cylindersvsField-cured cylinders

Field-cured cylinders are cured alongside the structure to judge the adequacy of curing and protection; per ACI 318-19 curing is adequate if they average at least 85% of companion standard-cured strength at the age designated for f'c, or exceed f'c by more than 3.5 MPa (500 psi).

Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Evaluation of Compression Test Results section, Page 440
Industry 10-point soil evaluationvsDesign Decision Model (DDM)

The 10-point system addresses only the likelihood of corrosion, while the DDM is a two-dimensional risk-based extension that also weighs the consequences of a pipeline failure in selecting a mitigation strategy.

DIPRA Installation Guide for Ductile Iron Pipe, Pages 28 to 29 (Section 2.15 Corrosive Soil)
Ordering a continuous footing alonevsOrdering combined footings, piers and slab

The printed ordering rule rounds a footing's net volume UP to the next quarter yard, whereas a combined order of net volumes is rounded up to the next whole yard.

Carpentry and Building Construction — Ch. 10, Estimating Footings, Foundation Walls and Concrete Block
Positive Response Code 110 (Extraordinary Circumstances)vsThree-hour 'No Show' remedy

Code 110 is an open code for hurricanes, floods, ice or acts of God, and per Section 58-36-60(E)(5) the excavator must not excavate or demolish until after the date and time the operator posted; the three-hour No Show remedy applies instead to an operator that fails to respond where there are indications of an unmarked facility.

SC 811 Excavator Manual (2026), Pages 20, 23 (Extraordinary Circumstances)

Key Terms

Tolerance Zone (South Carolina) SC 811 Excavator Manual (2026), Page 28 (Tolerance Zone & Safe Digging Practices)
For most excavation activities, when the facility diameter is known, the zone extending one-half of the known diameter plus twenty-four inches on either side of the designated center line of the facility (Section 58-36-20(21)(a)); for subaqueous excavation the Tolerance Zone instead extends 15 feet on either side of the marked facility.
Oxygen enriched atmosphere 29 CFR 1926, §1926.1202
Per 29 CFR 1926.1202, an atmosphere containing more than 23.5 percent oxygen by volume (a hazardous atmosphere under the confined spaces standard).
Code 110 — Extraordinary Circumstances SC 811 Excavator Manual (2026), Pages 20, 23 (Extraordinary Circumstances)
An open Positive Response code indicating circumstances such as hurricanes, floods, ice or acts of God that make compliance impractical for the operator, requiring the excavator to wait until after the date and time stated in the response.
Circled number at the top of a grade/ditch stake Excavation and Grading Handbook, Chapter 1 — Miscellaneous Information Stakes, Ditch channel stake (Page 18)
An offset in feet from the hub where the first cut begins (e.g., a circled 2 means the first 2 feet out from the hub are not cut; a circled 3 is a 3-foot offset on a ditch channel stake).
Boot Excavation and Grading Handbook, Page 75 — Setting Boots
A lath marked with a horizontal line set an even number of feet above the finished grade the surveyor staked, used when an obstruction blocks the line of sight; the handbook states a 6-foot boot is never used because it is too high to shoot to.
Averaging a row of lot pads Excavation and Grading Handbook, Page 167 (Chapter 9 — Excavating Streets and Lot Pads section)
Where a row of lots varies no more than 0.30 foot and the grade tolerance is 0.20 foot, lowering one end 0.15 and raising the other end 0.15 may put several lots at a common grade and eliminate small steps.
Cement treatment of an aggregate base Excavation and Grading Handbook, Page 263 (Chapter 15 — Using Cement Treatment)
Spreading and mixing cement into a pumping base in lieu of removal; rolling and trimming begin immediately after final mixing and for best results are finished within 3 hours, and the treatment cannot be used when atmospheric temperature is below 35 degrees F.
Manhole vacuum test Excavation and Grading Handbook, Pages 453 to 454 (Constructing Manholes)
After barrels are set and joints sealed, the vacuum plate's outer ring (a special bald tire) is inflated to 45 pounds to seal the manhole, which must then hold a one-pound vacuum for one minute with both pipe ends plugged.
Shovel-handle test (poured manhole walls) Excavation and Grading Handbook, Page 449
A check before pulling inner forms — on a warm day about three hours of curing should be enough, but if a shovel handle banged against the concrete sinks in or dents it, do not pull the forms.
Pipe tongs (patented lifting clamps) DIPRA Installation Guide for Ductile Iron Pipe, Pages 13 to 14 (Section 1.6 Pipe Tongs)
Lifting clamps for ductile iron pipe that may release the pipe prematurely if the suspended pipe contacts trench bracing protruding above the ground; ice on the pipe-holding pads is a separate cold-weather caution causing slippage.
Filler piece of pipe (new valve in existing main) DIPRA Installation Guide for Ductile Iron Pipe, Page 66 (Section 4.4 New Valves in Existing Mains)
Per DIPRA Section 4.4, a piece of pipe used to fill the gap inside a solid sleeve so the valve is held firmly and thrust will not push it along the line.
Push-on joint standardized outside diameter DIPRA Installation Guide for Ductile Iron Pipe, Page 50 (Section 3.6 Push-on Joints)
Push-on joint pipe has been manufactured with a standard outside diameter for each nominal size as of 1962; older pit-cast pipe came in classifications A, B, C and D with differing outside diameters, so existing pipe must be measured to determine if a transition coupling or specially sized gasket is needed.
Box Test (AASHTO TP 137) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Segregation Resistance / Box Test section, Page 430
A segregation-resistance test in which unconsolidated low-slump concrete is placed in a 28 L (1 ft³) collapsible wood form, vibrated with a 25-mm (1-in.) square-head vibrator, stripped, and inspected for voids and edge slumping; a common target for slipform paving is an edge slump of 6 mm (0.25 in.) or less.
Cast-in-place cylinder method (ASTM C873) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Strength Tests of Hardened Concrete section, Page 437
Cylinders cast in molds left in the member and cured with the surrounding concrete, then removed and tested; intended for concrete 125 mm to 300 mm (5 in. to 12 in.) in depth and particularly applicable to cold-weather concreting, post-tensioning work and slabs where minimum in-place strength is needed before work continues.
Carbonation of unhardened concrete (dusting) Design and Control of Concrete Mixtures (17th ed.), Chapter 11 — Carbonation section, Page 227
Carbonation of freshly placed concrete producing a soft, chalky surface, usually during cold-weather concreting when unvented heaters or gasoline-powered equipment in an enclosure put an unusual amount of carbon dioxide in the air.
Bar support height tolerance Placing Reinforcing Bars (10th ed.), Chapter 10 — Bar Supports
A variation of plus or minus 1/8 inch from the specified nominal height, measured from the support base to the underside of the reinforcing bar, is a normal construction tolerance.
Hard-troweled (steel-troweled) finish limit Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Finishing Flatwork / Bullfloating or Darbying section, Page 330
Concrete with more than 3% entrained air should not be given a hard-troweled finish because finishing before bleeding is complete can trap bleed water or air and cause delaminations; exterior freeze-thaw slabs at 6% or more air receive float or broom finishes.
Subgrade temperature differential (cold weather) Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Subgrade Preparation section, Page 314
In cold-weather slab-on-ground work the difference between the surface temperature of the supporting materials and the concrete should be held to less than 20°F (11°C) to avoid inconsistent setting, rapid moisture loss and plastic shrinkage cracking; concrete must not be placed on frozen subgrade and snow, ice and debris must be removed from within the forms.
Water needed for complete hydration Design and Control of Concrete Mixtures (17th ed.), Chapter 2 — Water (Evaporable and Nonevaporable) section, Page 43
Complete hydration of portland cement requires about 40% water by mass of cement (water-to-cement ratio 0.40); below about 0.40 some cement remains unhydrated for lack of water, and above it excess water stays in capillary pores or evaporates.

Formulas to Know

Subgrade rod elevation to mark on lath when the stake shows a FILL (laser level, direct-reading rod)Subgrade = rod reading on hub + fill − road section thickness (example: 3.50 + 0.70 − 0.75 = 3.45; a cut would be subtracted instead)
Aggregate base elevation to mark on lathAggregate base = subgrade elevation marked on lath + thickness of aggregate to be placed (example: 4.20 + 0.50 − 0.85 = 3.85 subgrade; 3.85 + 0.60 = 4.45)
Boot line distance measured up the lath from the hubOn a cut: boot height − cut (example: 5.00 − 2.45 = 2.55 ft; a 4-ft boot = 4.00 − 2.45 = 1.55 ft). On a fill the fill is ADDED to the boot height (2.45 + 5.00 = 7.45).
Cut-slope rate from a stake carrying a circled offsetRun = distance to toe/ditch − circled offset; slope = run ÷ vertical cut (examples: (10 − 2) ÷ 4.0 = 2:1; (11 − 3) ÷ 8.0 = 1:1)
Concrete volume of continuous footings and pier footingsFooting length = outside perimeter = 2 × (L + W); volume (cu yd) = length × width × depth (ft) ÷ 27 (example: 124 × 1.333 × 0.833 = 137.78 cu ft ÷ 27 = 5.10 cu yd; pier 2.5 × 2.5 × 1 = 6.25 cu ft each). Footing order is rounded UP to the next quarter yard.
4-inch basement slab concrete order using Table 11-1At 4 in. thickness one cubic yard covers 81 sq ft: cu yd = slab area ÷ 81, rounded up to whole yards (example: 960 ÷ 81 = 11.85 → 12 cu yd; check 960 × 0.333 ÷ 27 = 11.85)
8-inch foundation wall concrete using the printed tablecu yd = (wall area ÷ 100) × 2.47 cu yd per 100 sq ft (example: 136 × 8 = 1,088 sq ft ÷ 100 = 10.88 × 2.47 = 26.87 cu yd; check 1,088 × 0.667 ÷ 27 = 26.86)
Wall form contact areaContact area = both faces = 2 × perimeter × wall height (example: 2 × 136 ft × 8 ft = 2,176 sq ft)
Swell, loose volume and haul-off truck loadsLoose cu yd = bank cu yd × (1 + swell %); extra volume from a 10-percentage-point swell increase = bank × 0.10; loads = loose cu yd ÷ truck capacity, rounded up (example: 25.19 × 1.30 = 32.74 loose; 32.74 ÷ 12 = 2.73 → 3 loads)
Lot average elevation and fill to a uniform finished gradeAverage elevation = sum of the four corner elevations ÷ 4; average fill depth = finished elevation − average existing; volume (cy) = lot area × average fill depth ÷ 27 (example: (4.00+3.00+2.00+3.00) ÷ 4 = 3.00; 4.00 − 3.00 = 1.00 ft; 100 × 60 × 1.00 = 6,000 cf ÷ 27 = 222.2 cy). Maximum corner difference = highest corner − lowest corner (4.00 − 2.00 = 2.00 ft).