Exam Cheat Sheet · Quick Reference
South Carolina Water and Sewer Plants
South Carolina · PSI Services Contractor
South Carolina State Portion 50 questions
Key Distinctions
A double line means 'and then' — everything below it is measured from the RS/RP point — while with only a single line (or no double line) all grades and distances are measured from the surveyor's hub beside the information stake.
Excavation and Grading Handbook, Chapter 1 — Cut Stakes section (Page 9)With a laser level and direct-reading rod the cut is subtracted from the rod reading, but a fill is ADDED to the rod reading before the road section is subtracted (and on a boot, a cut is subtracted from the boot height while a fill is added to it).
Excavation and Grading Handbook, Page 97 (Chapter 5 — Using a Laser Level on a Road Project section)Bank yards are the in-place excavation volume (L × W × D ÷ 27), while loose yards are the swelled hauled volume (bank × [1 + swell %]), and haul-off truck loads must be figured on loose yards because dividing bank volume by truck size under-counts loads.
Pipe and Excavation Contracting — Ch. 9, Estimating Surface Excavation (bank vs loose yards)Per 29 CFR 1926.1202, oxygen enriched means more than 23.5 percent oxygen by volume and oxygen deficient means less than 19.5 percent; either is a hazardous atmosphere under the confined spaces standard.
29 CFR 1926, §1926.1202Bell-and-spigot pipe for a 48-inch poured manhole is set 48 inches apart so a 4-foot form fits between the pipe ends, but for large pipe using precast rings there must be LESS than 48 inches between pipes so the pipe sides fall inside the ring.
Excavation and Grading Handbook, Page 419The normal minimum offset from hub to back-of-curb is 2 feet for forming, but when a concrete machine is used on a Type 2 or Type 1-A curb the surveyors must set a 3-foot offset to back-of-curb for the men and machine.
Excavation and Grading Handbook, Pages 287 and 289 (Chapter 17 — Curb Stakes / Cutting Curb Grade)Rule of thumb for subdivision fills: a Cat 815 when daily fill hauled is 4,500 cubic yards or less, and a Cat 825 for 4,500 to 8,000 cubic yards per day.
Excavation and Grading Handbook, Page 160 (Chapter 9 — Compactors section)Per ANSI/AWWA C150/A21.50, Type 2 is a flat-bottom trench with backfill lightly consolidated only to the pipe centerline and Type 3 is pipe bedded in 4-inch minimum loose soil with backfill lightly consolidated to the top of pipe, while Type 4 requires sand, gravel or crushed stone bedding to 1/8 pipe diameter with backfill compacted to approximately 80 percent Standard Proctor and Type 5 requires compacted granular bedding to the pipe centerline with backfill at approximately 90 percent Standard Proctor.
DIPRA Installation Guide for Ductile Iron Pipe, Page 43 (Section 3.1 Standard Laying Conditions)V-Bio uses co-extrusion to infuse a corrosion inhibitor and an anti-microbial component into the innermost surface of the film and is the recommended film for ductile iron pipe in corrosive soils, installed per ANSI/AWWA C105/A21.5.
DIPRA Installation Guide for Ductile Iron Pipe, Pages 29 to 30 (Section 2.16 V-Bio Enhanced Polyethylene)Field-cured cylinders are cured alongside the structure to judge the adequacy of curing and protection; per ACI 318-19 curing is adequate if they average at least 85% of companion standard-cured strength at the age designated for f'c, or exceed f'c by more than 3.5 MPa (500 psi).
Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Evaluation of Compression Test Results section, Page 440The 10-point system addresses only the likelihood of corrosion, while the DDM is a two-dimensional risk-based extension that also weighs the consequences of a pipeline failure in selecting a mitigation strategy.
DIPRA Installation Guide for Ductile Iron Pipe, Pages 28 to 29 (Section 2.15 Corrosive Soil)The printed ordering rule rounds a footing's net volume UP to the next quarter yard, whereas a combined order of net volumes is rounded up to the next whole yard.
Carpentry and Building Construction — Ch. 10, Estimating Footings, Foundation Walls and Concrete BlockCode 110 is an open code for hurricanes, floods, ice or acts of God, and per Section 58-36-60(E)(5) the excavator must not excavate or demolish until after the date and time the operator posted; the three-hour No Show remedy applies instead to an operator that fails to respond where there are indications of an unmarked facility.
SC 811 Excavator Manual (2026), Pages 20, 23 (Extraordinary Circumstances)Key Terms
Formulas to Know
Subgrade = rod reading on hub + fill − road section thickness (example: 3.50 + 0.70 − 0.75 = 3.45; a cut would be subtracted instead)Aggregate base = subgrade elevation marked on lath + thickness of aggregate to be placed (example: 4.20 + 0.50 − 0.85 = 3.85 subgrade; 3.85 + 0.60 = 4.45)On a cut: boot height − cut (example: 5.00 − 2.45 = 2.55 ft; a 4-ft boot = 4.00 − 2.45 = 1.55 ft). On a fill the fill is ADDED to the boot height (2.45 + 5.00 = 7.45).Run = distance to toe/ditch − circled offset; slope = run ÷ vertical cut (examples: (10 − 2) ÷ 4.0 = 2:1; (11 − 3) ÷ 8.0 = 1:1)Footing length = outside perimeter = 2 × (L + W); volume (cu yd) = length × width × depth (ft) ÷ 27 (example: 124 × 1.333 × 0.833 = 137.78 cu ft ÷ 27 = 5.10 cu yd; pier 2.5 × 2.5 × 1 = 6.25 cu ft each). Footing order is rounded UP to the next quarter yard.At 4 in. thickness one cubic yard covers 81 sq ft: cu yd = slab area ÷ 81, rounded up to whole yards (example: 960 ÷ 81 = 11.85 → 12 cu yd; check 960 × 0.333 ÷ 27 = 11.85)cu yd = (wall area ÷ 100) × 2.47 cu yd per 100 sq ft (example: 136 × 8 = 1,088 sq ft ÷ 100 = 10.88 × 2.47 = 26.87 cu yd; check 1,088 × 0.667 ÷ 27 = 26.86)Contact area = both faces = 2 × perimeter × wall height (example: 2 × 136 ft × 8 ft = 2,176 sq ft)Loose cu yd = bank cu yd × (1 + swell %); extra volume from a 10-percentage-point swell increase = bank × 0.10; loads = loose cu yd ÷ truck capacity, rounded up (example: 25.19 × 1.30 = 32.74 loose; 32.74 ÷ 12 = 2.73 → 3 loads)Average elevation = sum of the four corner elevations ÷ 4; average fill depth = finished elevation − average existing; volume (cy) = lot area × average fill depth ÷ 27 (example: (4.00+3.00+2.00+3.00) ÷ 4 = 3.00; 4.00 − 3.00 = 1.00 ft; 100 × 60 × 1.00 = 6,000 cf ÷ 27 = 222.2 cy). Maximum corner difference = highest corner − lowest corner (4.00 − 2.00 = 2.00 ft).