Tennessee - NASCLA-Accredited Trade Examination For Electrical Contractor
Tennessee
· Prov
Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
100
Passing score
73%
Exam time
270 min
Administered by
Prov
Format
Reference materials allowed
Tennessee State Portion
100 questions
Project Design & Management8 Q · 8%
Electrical load calculations and service sizingBlueprint and schematic reading for electrical systemsProject scheduling and sequencing of electrical workMaterial takeoffs and quantity estimationElectrical system design compliance with NEC requirementsJob cost estimating and biddingCoordination with other trades and project stakeholdersPermit and inspection processes for electrical projectsContract types and payment structures for electrical projects (lump sum, unit price, cost-plus, retainage)Risk management and insurance requirements for electrical contractors (builder's risk, liability, bonding)Subcontractor qualification, selection, and site coordination requirementsProject scheduling methods (bar chart, critical path method, calendar scheduling) for electrical work+7 more
Safety9 Q · 9%
Personal protective equipment (PPE) requirements for electrical workLockout/tagout procedures for electrical energy controlElectrical hazard identification and arc flash safetyOSHA regulations applicable to electrical contractorsSafe work practices for energized and de-energized electrical systemsLadder and scaffold safety for electrical installationsConfined space entry proceduresFire prevention and extinguisher use on job sitesEnergized electrical work permit requirements and documentationElectric shock physiology and effects of current on the human bodyElectrical safety program responsibilities of employers and employeesSafety-related maintenance of electrical equipment and protective devices+7 more
Electrical Theory and Principles11 Q · 11%
Ohm's Law and voltage, current, resistance relationshipsSeries and parallel circuit analysisPower and energy calculations (watts, kilowatts, horsepower conversions)AC vs DC fundamentals and waveform characteristicsCapacitance and inductance in AC circuitsPower factor and reactive power conceptsElectromagnetism and transformer principlesThree-phase power calculations and configurationsAtomic structure, electron theory, and conductor/insulator propertiesKirchhoff's Voltage and Current Laws applicationsImpedance calculations in AC circuits (Z from R, XL, and XC)Harmonic currents and nonlinear load effects on waveforms+8 more
General Code Requirements17 Q · 17%
NEC Article 90 purpose, scope, enforcement, and arrangement of the CodeArticle 100 definitions used across the Code (accessible, readily accessible, approved, listed, labeled, bonding, grounded, etc.)110.2-110.3 approval, listing, and use of equipment per instructions110.4-110.7 voltages, conductor material, insulation integrity110.9-110.10 interrupting rating and short-circuit current ratings110.11-110.13 deteriorating agents, workmanship, mounting and cooling of equipment110.14 electrical connections, terminal temperature ratings, and torque110.15-110.16 high-leg marking and arc-flash hazard warning labels110.21-110.25 equipment marking, disconnect identification, available fault current marking, lockable disconnecting means110.26 working space depth, width, height, entrance, and dedicated equipment space (600 V and below)110.27-110.28 guarding of live parts and enclosure types110.30-110.34 working space and guarding for installations over 1000 volts+3 more
Wiring and Protection17 Q · 17%
Grounding and bonding requirements for electrical systemsOvercurrent protection sizing and device selectionBranch circuit ratings and conductor ampacityGround fault circuit interrupter (GFCI) protection requirementsArc fault circuit interrupter (AFCI) protection requirementsSurge protection device requirementsConductor insulation types and wiring methodsService entrance and feeder protection requirementsVoltage drop calculations for branch circuits and feedersAmpacity correction and adjustment factors for conductorsLoad calculations and demand factors for feeders and servicesMultiwire branch circuit requirements and neutral conductor sizing+5 more
Wiring Methods & Materials16 Q · 16%
Cable and conduit types and their permitted usesConduit fill calculations and conductor allowancesInstallation requirements for NM, MC, and AC cableRaceway installation and support requirementsWiring methods in specific occupancies and environmentsConductor sizing, insulation types, and temperature ratingsProtection requirements for wiring methods (physical damage, wet locations)Boxes, fittings, and enclosure requirements for wiring systemsUnderground installation requirements including minimum cover depths and direct-burial methodsConductor grouping, continuity, and same-circuit requirements in racewaysConduit bending techniques including 90-degree, offset, saddle, and back-to-back bendsCorrosion protection and material suitability requirements for raceways and enclosures+5 more
General Equipment Use13 Q · 13%
Safe use and handling of electrical tools and equipmentEquipment ratings and selection for electrical applicationsGrounding and bonding of electrical equipmentOvercurrent protection requirements for equipmentEquipment installation and mounting requirementsDisconnecting means for electrical equipmentEquipment listing and labeling requirementsWorking clearances and access around electrical equipmentMotor full-load current tables and nameplate data interpretationMotor overload protection sizing and placementMotor branch-circuit conductor sizing requirementsTransformer sizing, turns ratios, and primary/secondary current calculations+6 more
Special Occupancies, Special Equipment, and Special Conditions8 Q · 8%
Hazardous locations classification (Class I, II, III; Divisions 1 and 2)Wiring methods and equipment permitted in hazardous locationsHealth care facilities electrical requirements (hospitals, nursing homes)Places of assembly occupancy wiring requirementsAgricultural buildings and structures electrical installationsElectric signs, outline lighting, and associated wiringSwimming pools, fountains, and similar installationsTemporary installations and construction site wiring requirementsSolar PV system disconnecting means and rapid shutdown requirementsEmergency and legally required standby system power sources and transfer equipmentEquipotential bonding requirements for swimming pools and similar installationsZone 0, 1, and 2 hazardous location classification and protection techniques+4 more
Communication Systems1 Q · 1%
Installation requirements for communication wiring and cablesArticle 800 telephone and telegraph systemsCoaxial cable installation and groundingNetwork-powered broadband communications systemsOptical fiber cables and racewaysBonding and grounding of communication systemsSeparation from power conductorsCommunication circuit protectors and surge protectionCable listing requirements and cable type substitutions (CMP, CMR, CMG, CMX, CATV, BM, BL types)Fire and smoke rating requirements for plenum, riser, and general-purpose cablesAbandoned cable removal requirementsOverhead aerial wire clearances and routing requirements above roofs and between buildings+5 more
Key Distinctions
Unit price estimating methodvsQuantity take-off method
The unit price method bundles all cost factors (labor, materials, equipment, subcontractors) into a single price for the entire task, while the quantity take-off method estimates each component individually.
NASCLA Contractors Guide, Bidding and Estimating chapter — Other Methods of Estimating section
MediationvsArbitration / judicial decision
In mediation the parties themselves set the conditions of any agreement with dialogue facilitated by a neutral third party, whereas an arbitrator or judge sets forth the terms.
BuswayvsCable tray system / lighting track / multioutlet assembly
Article 100 defines a busway as a raceway (metal enclosure with factory-mounted bare or insulated conductors), while a cable tray is a structural support system, lighting track supports and energizes luminaires, and a multioutlet assembly contains a raceway but is not itself defined as one.
NEC 2023 Article 100 — Definitions of Raceway, Busway, Cable Tray System, Lighting Track, and Multioutlet Assembly
Capacitors at service equipment or panelsvsCapacitors at the individual loads
Capacitors at the service equipment/panel are primarily intended to reduce utility power factor penalties, while capacitors at the individual loads reduce circuit current, voltage drop, and wire power losses.
Mike Holt's Understanding Electrical Theory for NEC Applications, Page 153
Direct-buried cables/conductors cover — all locations not specifiedvsRMC or IMC cover — all locations not specified
Table 300.5(A) requires a minimum cover of 600 mm (24 in.) for direct-buried cables but only 150 mm (6 in.) for rigid metal conduit or intermediate metal conduit in locations not specified elsewhere.
NEC 2023 Table 300.5(A)
RMC under a one- and two-family dwelling drivewayvsRMC in all locations not specified in Table 300.5(A)
A dwelling driveway/outdoor parking area used only for dwelling purposes is a specified row requiring 450 mm (18 in.) minimum cover, while the 150 mm (6 in.) RMC figure applies only to locations not specified.
NEC 2023 Table 300.5(A)
Overhead service clearance over public streets, alleys, roads, and truck-traffic parking areas (≤1000 V)vsOverhead service clearance over residential property and driveways (≤300 V to ground)
230.24(B) requires a minimum 5.5 m (18 ft) over public streets/truck areas but only 3.7 m (12 ft) over residential property, driveways, and commercial areas not subject to truck traffic where voltage does not exceed 300 V to ground.
NEC 2023 Section 230.24(B)
Multifamily dwellingvsTwo-family dwelling
Article 100 defines a multifamily dwelling as a building containing three or more dwelling units; a building with solely two dwelling units is a two-family dwelling.
NEC 2023 Article 100 — definition of Dwelling, Multifamily
Type MV (medium voltage) cablevsPortable power feeder cable
Type MV is rated 2001 volts up to and including 35,000 volts nominal, while the 2001 to 25,000 volt range belongs to the separate definition of portable power feeder cable.
NEC 2023 Article 100 — Definition of 'Cable, Medium Voltage (Type MV)'
Branch-circuit OCPD sizing for continuous load (210.20(A))vsFeeder conductor ampacity for continuous load (215.2(A)(1))
The branch-circuit overcurrent device shall not be less than 125 percent of the continuous load, while feeder conductors must have ampacity not less than the noncontinuous load plus 125 percent of the continuous load.
NEC 2023 Section 210.20(A)
Commercial garage area up to 450 mm (18 in.) above floor WITH mechanical ventilationvsSame area WITHOUT adequate ventilation
Per Table 511.3(C) the area is unclassified when mechanical ventilation of at least 0.3 m³/min/m² (1 cfm/ft²) of floor area is provided with exhaust taken within 300 mm (12 in.) of the floor; without adequate ventilation it is Class I, Division 2.
Per 1910.147(c)(5)(ii)(B) both must be standardized in at least one of color, shape, or size, but tagout devices must additionally have standardized print and format.
29 CFR 1910 - OSHA Occupational Safety and Health Standards (General Industry), § 1910.147(c)(5)(ii)(B), Page 505
Elevator raceway conductor fill (620.33)vsGeneral wiring fill (Chapter 9, Table 1)
In elevator installations the sum of the cross-sectional area of individual conductors shall not exceed 50 percent of the raceway interior cross-sectional area, a special provision differing from the standard Chapter 9, Table 1 percentages.
NEC 2023 Section 620.33
Key Terms
Splash pad (Article 100) NEC 2023 Article 100 — definition of Splash Pad
A fountain intended for recreational use by pedestrians and designed to contain no more than 25 mm (1 in.) of water depth, excluding showers intended for hygienic rinsing prior to use of a pool, spa, or other water feature.
Dwelling, Multifamily (Article 100) NEC 2023 Article 100 — definition of Dwelling, Multifamily
A building that contains three or more dwelling units.
Cable, Medium Voltage (Type MV) (Article 100) NEC 2023 Article 100 — Definition of 'Cable, Medium Voltage (Type MV)'
A single or multiconductor solid dielectric insulated cable rated 2001 volts up to and including 35,000 volts, nominal.
Busway (Article 100) NEC 2023 Article 100 — Definitions of Raceway, Busway, Cable Tray System, Lighting Track, and Multioutlet Assembly
A raceway consisting of a metal enclosure containing factory-mounted bare or insulated conductors.
Array boundary (690.12(B)) NEC 2023 Section 690.12(B)
For PV rapid shutdown purposes, the boundary located 305 mm (1 ft) from the array in all directions; controlled conductors outside this boundary and more than 1 m (3 ft) from the array, or inside a building, must be limited to not more than 30 volts within 30 seconds of rapid shutdown initiation.
Pull point (EMT bend limit, 358.24(B) in NEC 2023/2026; 358.26 in NEC 2017/2020) NEC 2023 Section 358.24(B)
A point such as a conduit body that divides a raceway run, so that each section between pull points may contain up to 360° of bends.
Conduit seal, Class I Division 1 (501.15(A)(1)) NEC 2023 Section 501.15(A)(1)
A sealing fitting installed within 450 mm (18 in.) of the explosionproof enclosure or as required by the enclosure marking, with only threaded couplings or explosionproof fittings permitted between the seal and the enclosure.
Optional calculation for a dwelling unit (220.82(A)) NEC 2023 Section 220.82(A)
A load calculation method permitted for a dwelling unit whose total connected load is served by a single 120/240-volt or 208Y/120-volt set of 3-wire service or feeder conductors with an ampacity of 100 or greater.
Equipment grounding terminal bus bonding in patient care vicinity (517.14) NEC 2023 Section 517.14
The equipment grounding terminal buses of the normal and essential branch-circuit panelboards serving the same individual patient care vicinity must be connected together with an insulated continuous copper conductor not smaller than 10 AWG.
EGC sizing with instantaneous-trip circuit breaker (250.122(D)(2)) NEC 2023 Section 250.122(D)(2)
Where the branch-circuit short-circuit and ground-fault device is an instantaneous-trip circuit breaker or motor short-circuit protector, the wire-type equipment grounding conductor is sized per 250.122(A) using the maximum permitted rating of a dual-element time-delay fuse selected per 430.52(C)(1)(a), not the rating of the instantaneous-trip device.
Energized electrical work permit, Part I (NFPA 70E Annex J, Figure J.1) NFPA 70E 2024, Informative Annex J, Figure J.1
The portion completed by the requester, containing the description of the circuit/equipment and job location, the work to be done, and the justification for why the circuit cannot be de-energized or the work deferred; risk assessment results, safe work practices, and access restriction means are Part II items completed by the electrically qualified persons.
Indefinite delivery indefinite quantity (IDIQ) contract (PMBOK 4.6.8) A Guide to the Project Management Body of Knowledge (PMBOK Guide), Section 4.6.8, Page 191
A contract providing for an indefinite quantity of goods or services with a stated lower and upper limit within a fixed time period, commonly used for architectural, engineering, or information technology engagements.
A type of property insurance covering goods in transit and projects under construction that can be purchased to protect tools and equipment (an equipment floater is one type of inland marine policy).
IRS Form W-9 (subcontractors) NASCLA Contractors Guide (14th ed.), Chapter 12: Working with Subcontractors – Creating a Winning Partnership
The form a subcontractor should complete prior to starting work on the jobsite, as part of setting up the subcontractor relationship.
Bar chart / calendar scheduling NASCLA Contractors Guide (14th ed.), Chapter 8 — Bar Chart Scheduling section
Scheduling methods whose main weakness is that they do not show the interdependencies of activities, so a delay in one task does not show its impact on other tasks.
Interior lighting alteration compliance trigger (ASHRAE 90.1-2022, 9.1.1.3.1(a)) ANSI/ASHRAE/IES Standard 90.1-2022, Energy Standard for Sites and Buildings Except Low-Rise Residential Buildings (I-P), Pages 148-149 (Section 9.1.1.3.1)
An interior lighting alteration must comply with Section 9.2 when the total wattage of all new and retrofitted luminaires is greater than 2000 W; at 2000 W or less the altered space may instead meet the LPA tables plus specified controls or reduce wattage at least 50% below the original.
Lead-based paint non-compliance penalty (NASCLA Guide, Lead PRE) NASCLA Contractors Guide, Jobsite Safety and Environmental Factors chapter — Lead PRE section
Non-compliance with lead regulations carries fines of up to $37,500 per day for each violation, plus criminal penalties of imprisonment up to one year for willful or intentional violations.
Mobile home power-supply cord length (550.10(D)) NEC 2023 Section 550.10(D)
Measured from the end of the cord, including bared leads, to the face of the attachment plug cap, the overall length shall be not less than 6.4 m (21 ft) and shall not exceed 11.0 m (36½ ft).
Formulas to Know
Minimum feeder conductor ampacity with continuous load (215.2(A)(1))Ampacity ≥ noncontinuous load + (1.25 × continuous load); example: 80 A + (60 A × 1.25) = 80 + 75 = 155 A
Minimum branch-circuit OCPD rating for continuous load (210.20(A))OCPD rating ≥ 1.25 × continuous load; example: 16 A × 1.25 = 20 A
Motor branch-circuit conductor ampacity (430.22)Ampacity ≥ 1.25 × motor FLC from Table 430.248/430.250; example: 5 HP, 230 V, 1-phase FLC 28 A × 1.25 = 35 A
Motor feeder conductor ampacity (430.24)Ampacity ≥ (1.25 × largest motor FLC) + sum of FLCs of the other motors; examples: (1.25 × 65 A) + 40 A = 121.25 A; (1.25 × 15.2 A) + 15.2 + 15.2 = 49.4 A
Maximum motor feeder OCPD rating (430.62(A) with 240.6(A))Not greater than largest motor branch-circuit short-circuit/ground-fault device rating + sum of FLCs of other motors; example: 90 A + (14 + 10) = 114 A, and since this is a maximum and 114 A is not standard, use the next LOWER standard size, 110 A
Motor branch-circuit short-circuit/ground-fault device maximum (Table 430.52(C)(1) and exceptions)Nontime delay fuse for AC polyphase motor = 300% of FLC, next standard size permitted if not standard (Exc. No. 1); example 65 A × 3.00 = 195 A → 200 A. Inverse time CB = 250% of FLC; if the motor will not start, Exc. No. 2 permits an increase but in no case exceeding 400% of FLC for motors of 100 A or less (300% above 100 A); example 50 A × 4 = 200 A
Non-dwelling receptacle load demand (Table 220.47)First 10 kVA at 100% + remainder over 10 kVA at 50%; example: 18 kVA → 10,000 VA + (8,000 × 0.50) = 14,000 VA
Dwelling general lighting + small appliance + laundry load (Article 220)(sq ft × 3 VA/sq ft) + (1,500 VA × number of small-appliance circuits) + (1,500 VA × number of laundry circuits); example: 2,000 sq ft → 6,000 + 3,000 + 1,500 = 10,500 VA
Retail store general lighting + receptacle outlets (NEC 2020 or later)(sq ft × 1.9 VA/sq ft) + (180 VA × each receptacle outlet on one yoke); example: 3,500 × 1.9 = 6,650 VA plus 20 × 180 = 3,600 VA → 10,250 VA before demand factors
Track lighting load, other than dwellings or hotel/motel guest rooms (220.46(B))150 VA for every 600 mm (2 ft) of lighting track or fraction thereof; example: 18 ft ÷ 2 = 9 segments × 150 VA = 1,350 VA (exception permits calculation based on a current-limiting device rating)
Junction box minimum dimension for an angle pull (314.28(A)(2))6 × trade size of largest raceway + sum of diameters of all other raceway entries in the same row on the same wall; example: (6 × 3 in.) + 2 in. = 20 in.
Power loss at a terminal / connectionP = I² × R; example: (25 A)² × 0.20 Ω = 625 × 0.20 = 125 W