Tennessee - NASCLA-Accredited Trade For Electrical Contractor Exam: A Practical Study Guide
The Tennessee - NASCLA-Accredited Trade For Electrical Contractor exam tests the rules and the reference books behind the work. This guide lays out the job: the key facts from the official bulletin, what the exam covers, the books you need, sample questions with answers, and how to get ready. Prov gives the exam.
The Tennessee - NASCLA-Accredited Trade For Electrical Contractor Exam at a Glance
Here's the rundown from the official bulletin:
| Questions | 110 questions (100 scored, 10 unscored) |
| Time limit | 270 minutes |
| Passing score | 73% correct |
| Books in the exam room | Open book |
| Exam fee | $53 |
On exam day
- The exam uses multiple-choice questions with four answer choices.
- A current, valid, government-issued photo ID is required, and candidates must also sign the log and be photographed.
- Candidates should arrive at least 15 minutes before the scheduled appointment.
- References are inspected before entry, any edition of a listed reference may be used, and books with handwritten notes, moveable tabs, Post-its, photocopies, or test-prep guides are not allowed.
- Highlighting and permanent tabs are allowed; handwritten notes and moveable tabs are not.
- Simple 4-function calculators are permitted and a simple calculator is built into the test.
- Cameras, recorders, cell phones, smart watches and other communication devices are not allowed in the testing room; approved references and a simple 4-function calculator are.
References you may bring
- NFPA 70 - National Electrical Code 2023
- NFPA 70 - National Electrical Code 2020
- Ugly's Electrical References (2023)
- Mike Holt's Understanding Electrical Theory for NEC Applications Textbook (2022)
- NFPA 70E - Standard for Electrical Safety in the Workplace (2024)
- NASCLA Contractors Guide to Business, Law and Project Management (14th)
- Code of Federal Regulations, Title 29 Labor Pt 1926 (2024)
- ANSI/ASHRAE/IES Standard 90.1-2022
- A Guide to the Project Management Body of Knowledge (2020)
- OSHA 29 CFR 1910
Scheduling, changes and retakes
- Candidates register and schedule online at Prov's website or by calling Prov at 866-720-7768.
- Only the CMC and CMC-A examinations require Board approval before a candidate may schedule.
- Changes or cancellations must be made at least three business days before the test date, and rescheduling by that deadline is free.
- Late arrivals are turned away and forfeit their fees, as do candidates who fail to appear.
- Results are reported immediately by email with a numerical score and pass/fail result, plus a diagnostic report for candidates who fail.
- Failed exams may be retaken an unlimited number of times with no waiting period, at $53 per attempt.
- Passing candidates must submit a license application to the Board, which decides whether they qualify for licensure.
Source: Tennessee Board for Licensing Contractors Candidate Information Bulletin, TNCONT_CIB 2026.08.18. Check the bulletin before test day: fees and rules can change.
What the Tennessee - NASCLA-Accredited Trade For Electrical Contractor Exam Covers
The official content outline breaks the exam into 9 topics:
| Topic | Questions | Share of scored questions |
|---|---|---|
| Project Design & Management | 8 | 8% |
| Safety | 9 | 9% |
| Electrical Theory and Principles | 11 | 11% |
| General Code Requirements | 17 | 17% |
| Wiring and Protection | 17 | 17% |
| Wiring Methods & Materials | 16 | 16% |
| General Equipment Use | 13 | 13% |
| Special Occupancies, Special Equipment, and Special Conditions | 8 | 8% |
| Communication Systems | 1 | 1% |
How to Get Ready for the Tennessee - NASCLA-Accredited Trade For Electrical Contractor Exam
Treat your reference books like your tools. On an open-book exam you don't need every rule memorized. You need to know which book holds it and where to find it.
Buy the books the bulletin lists. Prov's reference rules let you bring an older or newer edition, but a different edition can put the answer on a different page, or change it, so the listed editions are the safest choice.
Learn your way around each book before you study anything else. The table of contents and the index are your layout.
Highlight what you look up most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
Do the big jobs first. General Code Requirements and Wiring and Protection make up 34% of the scored questions.
Put in the reps with timed practice exams. The clock trains you to find answers at the pace the real exam needs: about 2 minutes 27 seconds per question.
Measure twice. When you miss a practice question, find the section in your book, read it and mark it. Keep at it until you pass practice exams consistently.
The Books for the Tennessee - NASCLA-Accredited Trade For Electrical Contractor Exam
The bulletin lists ten references for this exam, all of which may be brought into the open-book examination.
Where to get them:
- OSHA 29 CFR 1926
- NEC 2023
- Standard for Electrical Safety in the Workplace, NFPA 70E
- NASCLA Contractors Guide 14th (national)
- Ugly's Electrical References 2023
- PMBOK Guide 7th
- ASHRAE 90.1-2022
- Holt Understanding Electrical Theory 2022
- OSHA 29 CFR 1910 (2024)
Working the Exam on Test Day
Work the exam in two passes. On the first pass, answer everything you know and bookmark the rest. You can flag questions and come back to them, but Prov freezes every question you were shown before a break, answered or not, and the exam clock keeps running while you are away, so finalize your answers before you take one. On the second pass, go back to your bookmarks and take them one at a time.
Don't get hung up on one question. You have 270 minutes for 110 questions (100 scored, 10 unscored), which is about 2 minutes 27 seconds per question. Before you finish, make sure nothing is left blank.
Study Tips
Take this practice exam several times. The goal is to consistently clear your exam's passing score — often around 70–75% — so passing feels routine before you walk into the real test.
Our practice exam is specifically designed to mimic the testing conditions at all exam centers. While untimed PDF study guides might help with studying, they don’t prepare you for the challenge of managing your time during an actual test.
Give yourself at least three to six weeks. Use your exam's candidate bulletin as your roadmap for what's tested, and spend your time on finding-it-fast skills over rote memorization. In practice, aim for three clean passes at 80% or higher — setting your practice bar above the real cut score gives you a comfortable margin on test day.
Know your way around each book's index and table of contents. Open-book exams reward speed: you need to find specific items quickly.
On an open-book exam, the winners aren't the smartest people in the room — they're the fastest at finding answers. Buy the required book, practice with it open, and tab and highlight each section the first time a question sends you there. Learn the index and table of contents until you can land on any topic in seconds. That speed is what separates a pass from a fail.
Sample Tennessee - NASCLA-Accredited Trade For Electrical Contractor Questions
These come from our practice question bank, each with its answer and the reference behind it.
Sample 1 — General Equipment Use
Question: You are installing an electric-discharge (neon) lighting system in a storefront sign. The supply transformer is enclosed, listed, and identified for the use, and it has a rated open-circuit voltage of 9000 volts. What is the maximum secondary short-circuit current rating this transformer is permitted to have?
- A. 300 mA
- B. 500 mA
- C. 100 mA
- D. 150 mA
Correct Answer: D
Per NEC 2023, 410.143(C), transformers for electric-discharge lighting systems of more than 1000 volts shall have a secondary short-circuit current rating of not more than 150 mA if the open-circuit voltage is over 7500 volts, and not more than 300 mA if the open-circuit voltage rating is 7500 volts or less. Because the rated open-circuit voltage here is 9000 volts (over 7500 volts), the limit is 150 mA. The 300 mA figure applies only at 7500 volts or less.
Reference: NEC 2023 Section 410.143(C)
Sample 2 — Electrical Theory and Principles
Question: In Ohm's Law, if an electrical appliance is rated at 1200 watts and is connected to 120 volts, how much current will it draw?
- A. 10 amperes
- B. 20 amperes
- C. 5 amperes
- D. 15 amperes
Correct Answer: A
Using the Power Formula (Watt's Law), Amperes = Watts ÷ Volts. Therefore, I = 1200W ÷ 120V = 10 amperes. While commonly grouped with Ohm's Law in electrical references (such as Ugly's Electrical References power wheel), this is technically the Power Formula (P = V × I), solved for current.
Reference: Ugly's Electrical References, 2023 ed., Ohm's Law, Page 1
Sample 3 — Safety
Question: What is the maximum OSHA worker exposure limit for lead in the air, averaged over an 8-hour day?
- A. 25 micrograms per cubic meter
- B. 100 micrograms per cubic meter
- C. 50 micrograms per cubic meter
- D. 75 micrograms per cubic meter
Correct Answer: C
OSHA regulates the amount of lead that workers can be exposed to at no more than 50 micrograms of lead per cubic meter of air averaged over an 8-hour day.
Reference: NASCLA Contractors Guide, Jobsite Safety and Environmental Factors chapter — Lead section
Sample 4 — Project Design & Management
Question: What is the primary advantage of using a calendar scheduling method for a construction project?
- A. It allows you to link project tasks to specific dates such as delivery dates, payment schedules, and holidays
- B. It automatically calculates the critical path of the project
- C. It graphically shows the interdependencies between all project activities
- D. It displays simultaneous events and float time for each activity
Correct Answer: A
The primary advantage of calendar scheduling is that you can link project tasks to specific dates, such as dates of other projects, delivery dates of materials, payment schedules, and employee vacations and holidays. However, calendar scheduling works best for smaller, less complex projects and does not show interdependencies between activities.
Reference: NASCLA Contractors Guide, Scheduling and Project Management chapter — Calendar Scheduling section
Why Practice Online Instead of With a PDF
A PDF is like reading about a job instead of doing it. Our practice exams are timed and on a screen, so you practice finding answers with the clock running. Each attempt draws a new set of questions from our bank, and your results break your score down by topic so you know where to put in more work.
Get Started
Take the free Tennessee - NASCLA-Accredited Trade For Electrical Contractor practice exam to see where you stand, then put your time into the topics that need it. For the official rules, read the exam bulletin, and see the licensing board's website.