EN ES
Study Course

Louisiana Foundations and Pile Driving

60 questions 150 minutes 70% to pass 8 topics 2:30 per question Open book
Try 10 free questions Free Cheat Sheet Official Bulletin

Practice at the real exam's pace

Every practice exam shows your time per question against the real exam's clock (2:30 here), and each topic lands in one of these:

Ready Find it faster Study it Needs both Rushing: slow down

What's on the exam

Questions per topic, out of 60
Equipment and Technique8
Compaction8
Excavation and Grading9
Soil Types8
Piles7
Concrete Formwork5
General Concrete8
Safety7

Topics

Open a topic to read its key concepts

Equipment and Technique

8 on exam · 34 practice questions

Key Concepts

Front shovels (Construction Planning, Equipment, and Methods, 9th ed., Ch. 9 – Excavators) - Hydraulic shovels for construction work range in capacity from 3 to 14 cy; mining shovels typically 28 to 68 cy (Size Rating of Front Shovels). - Both PCSA and SAE use a 1:1 angle of repose for heaped bucket capacity; CECE specifies 2:1 (Size Rating of Front Shovels). - The front-end attachment (shovel) weighs about one-third as much as the superstructure with its power parts and cab (General Information). - If a shovel is digging at optimum depth and swing is reduced from 90° to 60°, production increases 16%. One manufacturer states optimum production at a 70° swing, with productivity decreased 12% for each 30° of added swing (Angle of Swing Effect on Shovel Production). - One study found shovel travel was necessary after about 20 bucket loads, averaging 36 seconds per move (Calculating Shovel Production). - Haul-unit capacity should be about five times the excavator bucket size; drill and blast cost is typically 15% of total cost…

Compaction

8 on exam · 37 practice questions

Louisiana Foundations and Pile Driving — 8 questions (13% of exam)

Key Concepts

Laboratory compaction tests - Standard Proctor (ASTM D-698 / AASHTO T 99): 5.5-lb rammer with a 2-in. circular base, dropped 25 times from 12 in. on each of three equal layers; mold 4.0-in. inside diameter, 4.59-in. height (CPEM 9th ed., Ch. 5 — COMPACTION TESTS; Soils and Foundations, Sec. 4-2, Table 4-1, pp. 86–88). - Modified Proctor (ASTM D-1557 / AASHTO T 180): 10-lb hammer dropped 18 in. on each of five layers — about five times the energy of the Standard test; developed for airfield pavement subgrades, embankments, earthen dams and heavily loaded fills (CPEM Ch. 5; S&F Sec. 4-2). - Compaction energy per unit volume: 12,400 ft-lb/ft³ (600 kN·m/m³) Standard; 56,000 ft-lb/ft³ (2700 kN·m/m³) Modified (S&F Sec. 4-3, p. 91). - Sample prep: dry until friable under a trowel; if a drying oven is used, its temperature should not exceed 60°C (140°F) (S&F Sec. 4-2, p. 86).

Excavation and Grading

9 on exam · 70 practice questions

Louisiana Foundations and Pile Driving — 9 questions (15%)

Key Concepts

Site grading (IBC 2018) - Ground immediately adjacent to the foundation shall be sloped away from the building not less than 5 percent (one unit vertical in 20 units horizontal) for a minimum of 10 feet measured perpendicular to the face of the wall — IBC 1804.4, pp. 431–432. - Where a lot line or obstruction prevents the 10 ft of sloped ground and an approved alternative method of diverting water is used, swales within 10 feet of the foundation shall slope not less than 2 percent; impervious surfaces within 10 feet shall likewise slope not less than 2 percent away from the building — IBC 1804.4. - Compacted fill supporting shallow foundations must comply with an approved geotechnical report, except fill 12 inches or less in depth, which is acceptable if in-place dry density is not less than 90 percent of maximum dry density at optimum moisture content (ASTM D1557), verified by special inspection — IBC 1804.6, p. 432. Appendix J, **Section…

Soil Types

8 on exam · 45 practice questions

Key Concepts

Particle-size limits (ASTM, as given in Construction Planning, Equipment, and Methods, 9th ed., Ch. 4, p. 167–168) - Gravel: rounded or semi-round rock particles passing a 3-in. sieve and retained on a 2.0 mm (No. 10) sieve; sizes larger than 10 in. are boulders. - Sand: 2.0 mm down to 0.075 mm (No. 200 sieve); granular, non-cohesive, bulky particle shape. - Silt: smaller than 0.075 mm but larger than 0.005 mm; non-cohesive, little or no strength. - Clay: particles less than 0.005 mm; cohesive, particles "shaped like thin wafers, hence the use of the term platy." - Organic matter: partly decomposed vegetation; should be removed and replaced with more suitable soil.

Coarse vs. fine (Soils and Foundations, Sec. 2-1): gravel and sand, grains coarser than 0.075 mm (No. 200), are coarse-grained (granular); silt and clay, finer than 0.075 mm, are fine-grained.

Piles

7 on exam · 42 practice questions

Key Concepts

Load transfer. Load carried by skin friction between pile surface and soil = friction pile; load carried through the pile's lower tip = end-bearing pile. A pile driven through a mud deposit to rest on solid rock is an end-bearing pile (Construction Planning, Equipment, and Methods 9th ed., Ch. 17 — Introduction; Resistance of Piles to Penetration).

Timber piles. Acceptance is established under ASTM D 25–12 Standard Specification for Round Timber Piles. A straight line from center of butt to center of tip must lie entirely within the body of the pile; piles must be free from short crooks deviating more than 2.5 in. from straightness in any 5-ft length; sound knots no larger than one-sixth the circumference at the knot (Ch. 17 — Timber Pile Quality). Treated piling lasts 50 years in northern marine waters, 20 years in southern waters, southern defined as south of Cape Hatteras (East Coast) and below San Francisco (West Coast) (Ch. 17 — Treated Timber Piles).

Concrete Formwork

5 on exam · 26 practice questions

Louisiana Foundations and Pile Driving · 5 questions (8%)

Key Concepts

Vertical loads on horizontal forms. Minimum live load is 50 lb/ft² of horizontal projection for both vertical supports and horizontal framing components, to account for workers, runways, screeds, and other equipment; 75 lb/ft² when motorized carts are used (SP-4 §5.3.2). Regardless of slab thickness, the minimum unfactored (ASD) combined dead plus live load is 100 lb/ft² (4.8 kPa), or 125 lb/ft² (6.0 kPa) if motorized carts are used (ACI 347R-14 §4.2.1, SP-4 Appendix E, p. E-7; restated in SP-4 §8.1). For LRFD, the minimum factored dead plus live load is 140 lb/ft², or 180 lb/ft² with motorized carts (SP-4 §5.3.2). CPEM Ch. 20 agrees: live load not less than 50 lb/sf, increased for heavier/dynamic loads such as power buggies.

General Concrete

8 on exam · 63 practice questions

Key Concepts

Water-cementitious materials ratio (w/cm) - Complete hydration of portland cement requires about 40% water by mass of cement — a w/cm of 0.40. Below about 0.40 some cement remains unhydrated for lack of water (Ch. 2 — Water (Evaporable and Nonevaporable), p. 43). - To maximize chloride (corrosion) resistance, specify a maximum w/cm of 0.40 or less together with at least seven days of moist curing (Ch. 11 — Materials and Methods to Control Corrosion, pp. 229–230). - Concrete placed underwater: not less than 390 kg/m³ (650 lb/yd³) cementing materials, maximum w/cm 0.45 (Ch. 13 — Cementitious Materials Content, p. 271). - Concrete placed directly on a vapor retarder: keep w/cm low (0.45 or less), because excess water can escape only as bleed water (Ch. 15).

Safety

7 on exam · 34 practice questions

Key Concepts

Fall protection criteria (Subpart M; §§1926.104–1926.106 are in Subpart E). A personal fall arrest system must limit maximum arresting force to 1,800 lb (8 kN) with a body harness and 900 lb with a body belt — §1926.502(d)(16)(ii) and (d)(16)(i). PFAS anchorages must support 5,000 lb per employee attached — §1926.502(d)(15). Positioning-device anchorages must support at least twice the potential impact load or 3,000 lb (13.3 kN), whichever is greater — §1926.502(e)(2). Each employee normally gets a separate vertical lifeline, §1926.502(d)(10)(i); in elevator shaft construction two employees may share one lifeline only when both work atop a false car with guardrails and the lifeline has 10,000 lb strength (5,000 lb per employee) — §1926.502(d)(10)(ii). Guardrails must withstand 200 lb applied within 2 in of the top edge, §1926.502(b)(3), and must not deflect below 39 in above the walking/working level, §1926.502(b)(4); nominal top rail height is 42 in, §1926.502(b)(1). Safety nets are drop-tested with a 400-lb (180 kg) sand bag 30 ±2 in in diameter, dropped from the highest walking/working surface but not…

Final Practice Exam
60 questions · 150 min · timed simulation of the real exam
Never the same exam twice. Every attempt is drawn fresh from 351 questions, about 5 full exams' worth, and questions you haven't seen come first.

Required Books

Open-book exam
OSHA Standards for the Construction Industry
Buy on Amazon
17th Edition
Design and Control of Concrete Mixtures
Buy on Amazon
9th Edition, 2018
Construction Planning, Equipment, and Methods
Official source
7th (2008)
Soils and Foundations
Buy on Amazon
Revised
Pipe and Excavation Contracting
Buy on Amazon
2018 Edition
International Building Code 2018
Buy on Amazon
8th Edition (2014)
SP-4 Formwork for Concrete
Official source
As an Amazon Associate we earn from qualifying purchases.
$59.95/monthCancel anytime. Instant access.