50 questions 120 minutes 70% to pass 6 topics 2:24 per question Open book
Try 10 free questions Free Cheat Sheet Official Bulletin

Practice at the real exam's pace

Every practice exam shows your time per question against the real exam's clock (2:24 here), and each topic lands in one of these:

Ready Find it faster Study it Needs both Rushing: slow down

What's on the exam

Questions per topic, out of 50
Estimating and Plan Reading5
Surface Preparation and Planning5
Steep and Low Slope Roofing including BUR and Waterproofing18
Roofing Components10
Safety5
Repairs and Reroofing7

Topics

Open a topic to read its key concepts

Estimating and Plan Reading

5 on exam · 51 practice questions

Key Concepts

Measuring irregular roof plans — two equivalent methods (Roofing Construction and Estimating, Ch. 1, pp. 7–8, Examples 1-1 and 1-2): - Positive method: divide the roof into rectangles and add their areas. - Negative method: extend the roof lines to form one large rectangle, then subtract the areas that lie outside the actual roof. - Both yield identical results; use whichever requires fewer calculations.

Net vs. gross roof area (Ch. 1): The net area is the deck area to be covered. The gross area adds starter course, hip and ridge units, extra felt at ridges/hips/valleys, and cutting allowances at rakes, hips and valleys. A roofing square is 100 square feet.

Separate takeoff per slope (Ch. 1, Example 1-13): When the slope changes from one section to another, do a separate takeoff for each area with a different slope (e.g., a porch at 3:12 is figured separately from a 6:12 main roof).

Slope-factor conditions (Ch. 1, Figure 1-19 / Appendix A): The universal net-area formula applies only when all roof planes have the same slope and all hips and valleys are framed at 45 degrees with respect to the eaves.

Unequal slopes at a valley (Ch. 1, p. 22, Example 1-15): Multiply the run of the low-sloping roof by the appropriate factor from Appendix B (valley length factors).

Surface Preparation and Planning

5 on exam · 39 practice questions

Key Concepts

Deck inspection and acceptance criteria. Before applying roofing materials, NRCA recommends the roofing contractor and appropriate parties (general contractor, deck contractor, architect/engineer or designer, owner's representative) make a visual inspection of the deck surface to verify it is clean, dry, smooth and ready for roof system application. A deck should be broom clean, reasonably smooth, free of voids or depressions, and adequately attached, and should remain rigid so as not to deflect excessively under live loads. A roofing contractor only can inspect the surface and cannot assume responsibility for slope, structural integrity or method of attachment. If defects are found, corrections should be made and a second inspection held before roofing work begins, attended by the same parties. (NRCA Roofing Manual: Steep-slope Roof Systems—2025, Chapter 2—Roof Decks)

Plywood thickness by rafter spacing (asphalt shingles). NRCA recommends four-ply, nominal ¾-of-an-inch-thick (actual 23⁄32-of-an-inch) plywood for 24-inch rafter spacings, to provide adequate support and fastener pull-out resistance. (Section 2.1—Wood Panels)

Panel edge clips. NRCA recommends panel edge clips (H-clips) be used when wood panel sheathing of ½-inch nominal thickness (actual 15⁄32-inch) or less is installed over supporting members spaced at 24 inches on center. Plywood sheathing panels should be installed with about ⅛-of-an-inch minimum gaps at panel edges for expansion. (Section 2.1—Wood Panels)

Steep and Low Slope Roofing including BUR and Waterproofing

18 on exam · 162 practice questions

Key Concepts

Asphalt shingles (NRCA Steep-slope Roof Systems 2025, Sec. 4 / 4.2) - Standard three-tab shingles are commonly 12 in. × 36 in.; laminated shingles are also called "dimensional" or "architectural." - Minimum four roofing nails per full-length three-tab strip shingle, in a horizontal line about ⅝ in. above the tops of the cutouts. At 18:12 and greater, NRCA recommends six nails plus hand-tabbing (asphalt roof cement spots ~1 in. diameter). - Nails must extend a minimum of ⅛ in. through the underside of plywood/wood panel decks less than ¾ in. thick; on wood plank or board decks nails should penetrate at least ¾ in. - Typical exposure: 5 in. for standard 36-in. strip shingles; 5⅝ in. for metric 39⅝-in. shingles. Most common offset is the 6-in. method for 36-in. shingles. - Starter course: end joints offset a minimum of 5 in. from the first course's end joints; fasten along a line 1½ in. to 3 in. above the downslope perimeter edges. - Wind classes: ASTM D3161 — Class A 60 mph, Class D 90 mph, Class F 110 mph. ASTM D7158 — Class D 90 mph, Class G 120 mph, Class H 150 mph. - Roofing Construction & Estimating, Ch. 4: offset patterns are 6-in. (halves), 5-in. (random) and 4-in. (thirds); the 4-in. pattern is used on low slopes 2 through 3 in 12, with full shingle again at the…

Roofing Components

10 on exam · 68 practice questions

Key Concepts

Asphalt shingle materials and standards - Mineral additives ("fillers") are added to coating asphalt to "stabilize the bitumen, reduce its natural flow characteristics and increase fire resistance, making it more suitable as a coating material." Increasing UV transparency is not a purpose — granule surfacing protects against UV degradation. (NRCA Steep-slope Roof Systems 2025, §4.1—Asphalt Shingle Materials) - ASTM D3161 wind-resistance classes: Class A passes a fan-induced wind test at 60 mph; Class D at 90 mph; Class F at 110 mph. (NRCA §4.1—Wind Resistance) - AC438, "Acceptance Criteria for Alternative Asphalt Roofing Shingles," is a performance-based alternative to ASTM D3462 as a basis for code compliance. (NRCA §4.1—Asphalt Shingle Standards)

Roof decks and sheathing - NRCA recommends plywood roof sheathing meet or exceed PS 1, "Construction and Industrial Plywood." This applies across asphalt shingle, slate, tile, metal shingle, and wood shake/shingle systems. (NRCA §2.1—Wood Panels) - NRCA does not recommend OSB panels as a substrate for slate roof systems — because of concerns about long-term OSB performance and the long-term life expectancy of slate roof systems. (NRCA §2.1—Wood Panels, Slate Ch. 2) - Wood boards: widths typically 4 to 12 inches; NRCA suggests nominal 6-inch-wide boards "to prevent excessive movement and splitting." Boards thinner than nominal 1 inch are not strong enough to support roof loads. (NRCA §2.2—Wood Planks and Wood Boards) - Separately, Roofing Handbook Ch. 2 gives…

Safety

5 on exam · 21 practice questions

Key Concepts

Fall protection triggers and systems (Subpart M) - Roofing work on low-slope roofs requires fall protection at 6 ft (OSHA 1926 Subpart M trigger height). - A low-slope roof is "a roof having a slope less than or equal to 4 in 12 (vertical to horizontal)" (§1926.500(b)). - Warning line systems on low-slope roofs: line placed a minimum of 6 ft from the edge. - A personal fall arrest system must limit free fall to a maximum of 6 ft. - Vertical lifelines require 5,000 lb minimum breaking strength (29 CFR 1926). In the verified problem using a 250-lb worker and a maximum arresting force of 1,800 lb, the required lifeline breaking strength is still 5,000 lb — the figure does not scale with worker weight. - Key definitions at §1926.500(b): free fall distance, deceleration distance (additional vertical distance traveled, excluding lifeline elongation and free fall, before stopping), lanyard, lifeline, anchorage, hole (gap or void 2 inches or more in least dimension), opening (30 inches or more high and 18 inches or more wide).

Repairs and Reroofing

7 on exam · 35 practice questions

Key Concepts

Reroofing terminology (NRCA Roofing Manual: Membrane Roof Systems—2023, Chapter 9, §9.1; NRCA Steep-slope Roof Systems—2025, Chapter 6, §6.1) - Reroofing: re-covering or tearing off and replacing an existing roof covering. - Re-covering: installing an additional roof covering over a prepared existing roof covering without removing it. - Replacement: removing the existing roof covering, repairing damaged substrate, installing new covering ("tear-off and replacement"). - Roof assembly = structural deck/substrate plus the roof system; roof system = every component above the deck.

Existing deck evaluation (NRCA Membrane Roof Systems—2023) - Steel decks: NRCA is concerned with structural capacity and fastener-holding power of decks lighter than 22 gauge (0.028 inches thick) (p. 289). - Lightweight insulating concrete: NRCA suggests a minimum of four pullout tests per continuous pour area; if results are below the minimum required system-specific pullout resistance, the LWIC should be removed and replaced (p. 289). A minimum ½-inch-thick insulation layer may be adhered over a mechanically attached base sheet to cover minor deck irregularities and begin reroofing (p. 289). - Wood panel (plywood/OSB) decks: holes up to approximately 10 inches wide may be covered with 24-gauge (0.025-inch-thick) steel plate overlapping the wood deck a minimum of 4 inches, secured with fasteners 4 inches on center (p. 293).

Final Practice Exam
50 questions · 120 min · timed simulation of the real exam
Never the same exam twice. Every attempt is drawn fresh from 376 questions, about 7 full exams' worth, and questions you haven't seen come first.

Required Books

Open-book exam
OSHA Standards for the Construction Industry
Buy on Amazon
2025 Edition
NRCA Roofing Manual: Steep Slope Roof Systems
Buy on Amazon
2023 Edition
NRCA Roofing Manual: Membrane Roofing Systems
Buy on Amazon
2018 Edition
International Building Code 2018
Buy on Amazon
1995 (13th printing 2022)
Roofing Construction and Estimating
Buy on Amazon
2018 Edition
International Residential Code for One-and Two-Family Dwellings
Buy on Amazon
As an Amazon Associate we earn from qualifying purchases.
$59.95/monthCancel anytime. Instant access.