EN ES
Study Course

South Carolina Grading

40 questions 120 minutes 70% to pass 3 topics 3:00 per question Open book
Try 10 free questions Free Cheat Sheet Official Bulletin

Practice at the real exam's pace

Every practice exam shows your time per question against the real exam's clock (3:00 here), and each topic lands in one of these:

Ready Find it faster Study it Needs both Rushing: slow down

What's on the exam

Questions per topic, out of 40
General Knowledge15
Excavating and Grading20
Safety - Code of Federal Regulations5

Topics

Open a topic to read its key concepts

General Knowledge

15 on exam · 76 practice questions

Key Concepts

Equipment economics (Construction Planning, Equipment, and Methods, 9th ed., Ch. 2) - Purchase expense is the total delivered (drive-away) cost including all options, shipping and taxes, less the cost of the tires; tires are carried as an operating cost (pp. 72, 88). - Major repairs and overhauls that extend service life are an ownership cost added to basis and depreciated; normal maintenance repairs are an operating cost (pp. 80, 93). - MACRS: cars and light-duty trucks (under 13,000 lb unloaded) are 3-year property; most other construction equipment is 5-year property (p. 78). - Like-kind exchange: unadjusted basis of the new machine = adjusted basis of the traded machine + cash paid; no gain recognized (pp. 75–76). - Rentals are priced daily (8 hr), weekly (40 hr), or monthly (176 hr = 8 hr/day × 22 days) (p. 104). - PCSA repair/maintenance guidelines: 80 to 95% of depreciation for crawler-mounted excavators, 80 to 85% wheel-mounted excavators, 55% crawler cranes, 50% wheel-mounted cranes (p. 97). - Replacement analysis is based on cumulative hours; keeping a machine past minimum total cost applies the hourly difference to every cumulative operating hour (pp. 101–102).

Power requirements (Ch. 6) - Rolling resistance increases about 30 lb/ton per inch of tire penetration (pp. 245–247). - Published crawler drawbar pull assumes a 110 lb/ton haul road (Nebraska tests); pull changes by tractor tons × variation from 110 lb/ton (p. 259). - Altitude: a four-cycle engine loses about 3% per 1,000 ft above sea level; a two-cycle diesel holds full power to 1,000 ft, then loses about 0.9% for each additional 1,000 ft. A 1-in. barometer drop ≈ a 900-ft altitude increase (pp. 265–266).

Earthwork planning (Ch. 3) - Average-end-area volumes are slightly in excess of actual; precision ±1.0%; the trapezoidal end-area formula is about ±0.5% (pp. 127, 130). - For embankments greater than 5 ft in height, most specifications allow organic material to remain if its thickness is only a few inches (p. 131). - Type 1 differing site condition = conditions differ from those "indicated in the contract"; Type 2 = differ from reasonable expectations (p. 121). - Mass diagram: curve above the balance line = haul left to right (up stationing); below = right to left, down stationing (pp. 140–141). - Grid method: single-cell volume = average of the four corner elevation differences × grid area (p. 151).

Excavating and Grading

20 on exam · 133 practice questions

Key Concepts

Erosion control (SCDOT Section 815) - Inlet filter selection: Type A for peak flow less than 1 ft³/sec, inlet drain area grade less than 5%, and immediate (5-ft radius) grade less than 1%, not for concentrated flow (815.1.1.3.1). Type B for peak flow less than 3 ft³/sec, inlet drain area grade less than 5%, velocity not exceeding 3 ft/sec, where overflow capacity is not required (815.1.1.3.2). Type D for drainage areas up to 2 acres with peak flows greater than 3 ft³/sec and grades greater than 5% (815.1.1.3.3). Type E protects Catch Basin Types 1, 16, 17, 18 after the road surface course is placed (815.1.1.3.4). - Type A filter fabric inlet protection: posts spaced a maximum of 3 feet apart, driven a minimum of 24 inches, fabric to a minimum height of 24 inches above grade (815.4.11.2.2.1). Type B hardware fabric posts: maximum 3 feet apart, driven a minimum of 18 inches (815.4.11.2.3.1). - RECP slope installation: 6-inch deep × 12-inch wide anchor trench; extend the upslope terminal end 30 inches past the trench; staple on 12-inch centers (815.4.2.2.2). Channels: anchor trenches/staple check slots perpendicular to flow across the full channel width at 25-foot intervals, with 6-in × 6-in check slots every 25 feet (815.4.2.2.3). - Sediment tubes: trench depth 20% of tube diameter, do not completely bury, lap adjacent ends a minimum of 6 inches (815.4.5.2). - Silt fence: inspect every 7 days; remove within 30 days after final stabilization or when temporary BMPs are no longer needed (815.4.6). - Temporary flexible pipe slope drains: sized for anticipated flow, in no case less than 8 inches diameter (815.4.12). - BFM: do not exceed 100-ft maximum slope length when gradients are steeper than 4H:1V; general rate 3500 lb/acre (815.4.15.1). Fiber roving: Type A 0.30 lb/SY minimum, Type B 0.15 lb/SY minimum; asphalt 0.25–0.35 gal/SY (815.4.4). - Brush barriers are not measured and not paid directly — incidental to Clearing and Grubbing lump sum (815.5, 815.6).

Safety - Code of Federal Regulations

5 on exam · 25 practice questions

Key Concepts

Excavation access and egress (Subpart P) - Trench excavations 4 feet (1.22 m) or more in depth must have a stairway, ladder, ramp, or other safe means of egress located so that no more than 25 feet (7.62 m) of lateral travel is required — §1926.651(c)(2). - Structural ramps used solely by employees for access/egress must be designed by a competent person; ramps for equipment access must be designed by a competent person qualified in structural design — §1926.651(c)(1)(i).

Protective systems - Each employee in an excavation must be protected from cave-ins except where the excavation is made entirely in stable rock, or is less than 5 feet (1.52 m) deep and a competent person's examination of the ground gives no indication of a potential cave-in — §1926.652(a)(1). - Deviating from a manufacturer's specifications, recommendations and limitations for a shield or other manufactured system is allowed only after the manufacturer issues specific written approval, which must be in written form at the jobsite — §1926.652(c)(2)(ii). - Type C soil, excavations 20 feet or less deep with vertically sided lower portions: shielded or supported to at least 18 inches above the top of the vertical side, maximum slope 1 1/2:1 above — Appendix B, Figure B–1.3. - Type A soil, more than 8 feet but not more than 12 feet deep with an unsupported vertically sided lower portion: maximum slope 1:1, maximum vertical side 3 1/2 feet — Appendix B, Figure B–1.1.

Soil classification (Appendix A) - Type A requires unconfined compressive strength of 1.5 tsf or greater, but soil that meets that strength and is fissured or subject to vibration is Type B. - A layered system must be classified by its weakest layer; layers may be classified individually only where a more stable layer lies UNDER a less stable layer — Appendix A, paragraph (c)(4).

Other excavation hazards - Flammable gas: ventilation or other adequate precautions to keep exposure not in excess of 20 percent of the lower flammable limit — §1926.651(g)(1)(iii). - Spoil/equipment kept at least 2 feet (.61 m) from the edge, or sufficient retaining devices, or both — §1926.651(j)(2).

Final Practice Exam
40 questions · 120 min · timed simulation of the real exam
Never the same exam twice. Every attempt is drawn fresh from 234 questions, about 5 full exams' worth, and questions you haven't seen come first.
Business Management and Law exam included
11 topics · 50 questions · 125 min

Required Books

Open-book exam
OSHA Standards for the Construction Industry
Buy on Amazon
9th Edition, 2018
Construction Planning, Equipment, and Methods
Buy on Amazon
2007 Edition
SCDOT Standard Specifications for Highway Construction
Official source
2024 Edition
South Carolina 811 Excavator Manual
Official source
3rd (2006)
Excavation and Grading Handbook
Buy on Amazon
9th Edition
NASCLA Contractors Guide South Carolina
Buy on Amazon
As an Amazon Associate we earn from qualifying purchases.
$59.95/monthCancel anytime. Instant access.