ICC G11 General Building Contractor (A) (2018 IBC) Exam Study Guide
This guide covers what you need for the ICC G11 General Building Contractor (A) (2018 IBC) exam: the key facts from the official bulletin, the topics it tests, the reference books, sample questions with answers, and a plan to prepare. Pearson VUE gives the exam.
ICC G11 General Building Contractor (A) (2018 IBC) Exam at a Glance
Here are the exam's key facts from the official bulletin:
| Questions | 90 questions |
| Time limit | 4 hours |
| Passing score | 70% correct |
| Books in the exam room | Open book |
| Exam fee | $120 |
On exam day
- The exam uses multiple-choice questions.
- NOTE: You do not need to buy all editions associated with the Concrete Manual references. Since all answers associated with those references can be found in any of the listed editions, you will need only one of the reference editions to study for your exam.
You may bring copyrighted, bound books to the test administration, including those specifically listed as approved references. However, training materials such as presentations, study guides, or practice questions are not permitted. All exam questions are based solely on the approved reference list, and only those references may be used as the basis for appealing exam questions.
References you may bring
- International Building Code® (2018)
- Concrete Manual: Based on the 2021 IBC and ACI 318-19
- Concrete Manual: Based on the 2015 IBC and ACI 318-14
Scheduling, changes and retakes
- Exams are scheduled through PearsonVUE at www.pearsonvue.com/ICC, where candidates can create an account, schedule an exam, locate a test center, purchase vouchers and request accommodations.
- Results for examinations taken electronically are available immediately after the examination is completed.
- You must wait 10 days before retaking a failed exam.
- After passing, contact the jurisdiction in which you wish to be licensed for any other requirements, because ICC is not a licensing agency.
Source: National Contractor/Trades Examination Information Bulletin, PUBLISHED June 30, 2026; ICC Exam Catalog, checked October 2, 2026. Check the bulletin before test day: fees and rules can change.
What the ICC G11 General Building Contractor (A) (2018 IBC) Exam Covers
The official content outline has 4 topics:
| Topic | Questions | Share of the exam |
|---|---|---|
| Permits and General Regulations | 17 | 19% |
| Building Planning and Life Safety | 28 | 31% |
| Structural Systems | 38 | 42% |
| Building Envelope | 7 | 8% |
How to Prepare for the ICC G11 General Building Contractor (A) (2018 IBC) Exam
Start with the books. This is an open-book exam, so the references on the bulletin's list are your main study tool. Get the editions the bulletin names.
Learn where things are. Read the table of contents and the index of each book until you know where every major subject lives. On test day, finding an answer fast matters more than memorizing it.
Highlight the sections you use most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
Spend most of your time on the biggest topics. Structural Systems and Building Planning and Life Safety make up 73% of the exam.
Take timed practice exams. The clock trains you to find answers at the pace the real exam needs: about 2 minutes 40 seconds per question.
Aim to pass more than once. One passing score can be luck. Several in a row means you're ready.
Reference Books for the ICC G11 General Building Contractor (A) (2018 IBC) Exam
The listed references are the 2018 International Building Code and either the Concrete Manual: Based on the 2021 IBC and ACI 318-19 or the Concrete Manual: Based on the 2015 IBC and ACI 318-14.
Where to get them:
On Test Day
- Go through the whole exam first. Answer every question you know and bookmark the ones you don't. Every exam lets you come back to bookmarked questions, but some lock the questions you've seen once you take a break, so work your bookmarks before any break.
- Then go back to your bookmarks and work them out.
- Don't let one question eat your time. You have 4 hours for 90 questions, which is about 2 minutes 40 seconds per question.
- Before you finish, answer anything you skipped. A blank can't earn a point.
Sample ICC G11 General Building Contractor (A) (2018 IBC) Practice Questions
These questions come from our practice question bank, each with its answer and reference.
Sample 1 — Building Envelope
Question: Gypsum lath and gypsum wallboard are generally prohibited as a backing for cement plaster. Where the limited exception applies on interior walls and on horizontal supports of ceilings or roof soffits, the gypsum backing must be used with a water-resistive barrier and which type of lath?
- A. Rib metal lath
- B. Paperbacked woven wire lath
- C. Self-furred metal lath
- D. Welded wire lath
Correct Answer: C
IBC Section 2510.5.2.1 prohibits gypsum lath or gypsum wallboard as a backing for cement plaster, except that it is permitted with a water-resistive barrier as a backing for self-furred metal lath or self-furred wire fabric lath on horizontal supports of ceilings or roof soffits and on interior walls.
Reference: IBC 2018 Section 2510.5.2.1
Sample 2 — Structural Systems
Question: A precast supplier on your commercial project substitutes a high-early-strength (Type III) cement for the Type I cement originally proposed. Compared with Type I, what should you expect of the setting times of the paste?
- A. Setting times about one-fourth as long
- B. Final set about twice as long
- C. Initial set about half as long
- D. Nearly the same setting times
Correct Answer: D
Concrete Manual, Chapter 1, Section 1.2 states that the rate of setting is not necessarily the same as the rate of hardening: a high-early-strength cement can have nearly the same setting times as a common Type I cement, but it develops strength much more rapidly once it has set.
Reference: Concrete Manual (2015 IBC / ACI 318-14), Chapter 1 — Section 1.2 (The Hydration Reaction)
Sample 3 — Building Planning and Life Safety
Question: A commercial building has an upper story whose finished floor is located 58 feet above the lowest level of fire department vehicle access. An automatic sprinkler system is required throughout the building when such a story has an occupant load of at least how many persons?
- A. 300
- B. 50
- C. 30
- D. 100
Correct Answer: C
IBC 903.2.11.3 requires sprinklers throughout buildings having one or more stories with an occupant load of 30 or more located 55 feet or more above the lowest level of fire department vehicle access, measured to the finished floor.
Reference: IBC 2018 Page 221
Sample 4 — Permits and General Regulations
Question: After your commercial project is completed, how long must the building official keep the one set of approved construction documents retained by the department?
- A. Not less than 90 days from completion of the permitted work
- B. For the period required for retention of public records
- C. Not less than 180 days from completion of the permitted work
- D. Until the certificate of occupancy has been issued
Correct Answer: C
IBC Section 107.5 requires that one set of approved construction documents be retained by the building official for a period of not less than 180 days from the date of completion of the permitted work, or as required by state or local laws. The 'period required for retention of public records' applies to department records under Section 104.7.
Reference: IBC 2018 Chapter 1 (Scope and Administration), Section 107.5
Why Practice Online Instead of With a PDF
A PDF shows you questions. It doesn't show you the clock. Our practice exams are timed and on a screen, so you practice finding answers under time pressure, not just reading them. Each attempt draws a new set of questions from our bank, and your results break the score down by outline topic so you know what to study next.
Start Practicing
Take the free ICC G11 General Building Contractor (A) (2018 IBC) practice exam to see where you stand, then work through the topics that need attention. For the official rules, read the exam bulletin, and see the licensing board's website.