South Carolina - NASCLA-Accredited Trade for Residential Electrical Contractor Exam Prep Checklist
Everything for the South Carolina - NASCLA-Accredited Trade for Residential Electrical Contractor exam in one place: the bulletin's key facts, the topics and how many questions each carries, the reference books, sample questions with answers, and a prep checklist. PSI gives the exam.
South Carolina - NASCLA-Accredited Trade for Residential Electrical Contractor Exam Facts
From the official bulletin:
| Questions | 100 questions |
| Time limit | 270 minutes |
| Passing score | 70 correct answers out of 100 scored questions |
| Books in the exam room | Open book |
| Exam fee | $116 |
On exam day
- You must bring one valid, unexpired photo and signature identification matching your registration name, such as a state driver's license, state ID card, US passport, US military ID, US alien registration card, or Canadian government ID.
- You should arrive at the examination center at least 30 minutes before your appointment.
- Only the reference books listed in the bulletin may be brought in, they must be unmarked apart from highlighting/underlining/indexing, must contain no extra papers, and are not supplied at the center.
- Highlighting and underlining are allowed, writing in the book is not, and only permanent tabs may be used.
- A silent, battery-operated, nonprinting, non-programmable calculator without an alphabetic keyboard may be brought into the examination center.
- Candidates are given a physical diagram/blueprint packet at the testing center for this exam.
References you may bring
- National Electrical Code or National Electrical Code Handbook (2020 or 2023)
- Code of Federal Regulations - 29 CFR 1926 - OSHA Construction Industry Regulations (2024)
- NASCLA Contractors Guide to Business, Law and Project Management, Basic (14th Ed.)
- NFPA 70E - Standard for Electrical Safety in the Workplace (2024)
- Ugly's Electrical References (2023 Edition)
- NFPA 72 - National Fire Alarm and Signaling Code (2022 Edition)
- Understanding Electrical Theory for NEC Applications
- ANSI Z535.4-2023, Product Safety Signs and Labels, American National Standard for Product Safety Signs and Labels
- International Residential Code (IRC) (2024)
Scheduling, changes and retakes
- You schedule your examination online at PSI's website or by calling PSI registrars at (855) 340-3701.
- Approval from the state comes first, and the resulting Examination Eligibility letter is valid for 1 year with 3 attempts allowed in that 12-month period.
- Cancel or reschedule at least 2 days before the exam date to avoid forfeiting your fee, using the PSI website or by speaking directly with a representative.
- Missing the appointment, cancelling late, arriving too late to start without disrupting the schedule, or lacking proper ID invalidates the registration and forfeits the fee.
- Results are given on screen immediately after the exam, with a performance summary for passers and a diagnostic report for those who do not pass.
- You get 3 attempts within a 12-month period, and after three failures you must wait twelve months from the last attempt to test again.
- After passing, candidates can send transcripts through NASCLA's National Examination Database and must still follow the state agency's license application requirements, including a business and law examination.
Source: Residential Builders and Residential Specialty Examinations Candidate Information Bulletin, Updated 10/9/2026. Check the bulletin before test day: fees and rules can change.
South Carolina - NASCLA-Accredited Trade for Residential Electrical Contractor Exam Topics
The official content outline has 10 topics:
| Topic | Questions | Share of the exam |
|---|---|---|
| Theory | 9 | 9% |
| Personal Jobsite Safety (OSHA, NFPA 70E) | 8 | 8% |
| Project Design, Estimating, and Measurement | 8 | 8% |
| Grounding and Bonding | 14 | 14% |
| Special System and Special Equipment Installations | 7 | 7% |
| Tools and Equipment | 7 | 7% |
| Circuit Protection and Installation | 16 | 16% |
| Wiring Methods and Practices | 17 | 17% |
| Equipment for General Use | 13 | 13% |
| Energy Efficiency/Management | 1 | 1% |
South Carolina - NASCLA-Accredited Trade for Residential Electrical Contractor Exam Prep Checklist
- Get the reference books the bulletin lists, in the editions it names.
- Learn each book's table of contents and index first.
- Highlight the sections you use most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
- Start with the biggest topics: Wiring Methods and Practices and Circuit Protection and Installation (33% of the exam).
- Take our timed practice exams until you pass several in a row.
- After each attempt, look up every question you missed in your book.
- Practice at the real exam's pace: about 2 minutes 42 seconds per question.
South Carolina - NASCLA-Accredited Trade for Residential Electrical Contractor Exam Reference Books
The bulletin lists nine reference materials under the NASCLA-Accredited Trade Examination for Residential Electrical Contractor.
Where to get them:
- OSHA 29 CFR 1926
- Standard for Electrical Safety in the Workplace, NFPA 70E
- IRC 2024
- Ugly's Electrical References 2023
- Holt Understanding Electrical Theory 2022
- NFPA 72 2022
- NEC 2023
- NASCLA Contractors Guide 14th (national)
Test Day Checklist
- First pass: answer every question you know. Bookmark the rest. Every exam lets you return to bookmarked questions (some lock them once you take a break).
- Second pass: work through your bookmarks.
- Pace: 270 minutes for 100 questions, which is about 2 minutes 42 seconds per question.
- Last step: answer anything still blank. A blank can't earn a point.
Study Tips
Skim the answer choices before you commit. You're hunting for the key term or vocabulary word that signals the right concept. The more you've practiced, the faster the right wording jumps out at you.
You're given plenty of time, so use as much of it as you need. Don't get rattled when other people finish early — finishing first isn't a prize. Work at your own steady pace and review your answers before you submit.
After each practice test, note the topics you miss most and spend your next session there. Re-testing weak areas yields far more score gain than re-reading what you already know.
On tough multiple-choice questions, rule out the options you know are wrong before choosing. Narrowing to two choices sharply improves your odds even when you're unsure.
South Carolina - NASCLA-Accredited Trade for Residential Electrical Contractor Sample Questions
From our practice question bank, with answers and references:
Sample 1 — Equipment for General Use
Question: What is the minimum conductor size required for lighting track systems?
- A. 14 AWG
- B. 10 AWG
- C. 16 AWG
- D. 12 AWG
Correct Answer: D
According to NEC 410.155(A), the track conductors shall be a minimum 12 AWG or equal and shall be copper.
Reference: NEC 2023 Section 410.155(A)
Sample 2 — Theory
Question: What is the total resistance in a series circuit with three resistors of 20 ohms, 25 ohms, and 15 ohms?
- A. 25 ohms
- B. 20 ohms
- C. 6.67 ohms
- D. 60 ohms
Correct Answer: D
In a series circuit, the total resistance equals the sum of all resistances. RT = R1 + R2 + R3 = 20 + 25 + 15 = 60 ohms. This follows Rule 3 for series circuits.
Reference: Ugly's Electrical References, 2023 ed., Series Circuits, Page 3
Sample 3 — Personal Jobsite Safety (OSHA, NFPA 70E)
Question: Under OSHA regulations, an emergency action plan must include the name or job title of a specific individual. What is the role of this person?
- A. The plan administrator who coordinates the emergency procedures
- B. The company's chief financial officer responsible for insurance claims
- C. The OSHA compliance officer assigned to the employer's region
- D. The site superintendent who authorizes overtime during emergencies
Correct Answer: A
OSHA regulations require that the emergency action plan include the name or job title of the plan administrator. This person is responsible for coordinating emergency procedures and ensuring the plan is properly implemented and communicated to employees.
Reference: NASCLA Contractors Guide (14th ed.), Chapter 11 — Emergency Action Plan section
Sample 4 — Project Design, Estimating, and Measurement
Question: When using the optional dwelling unit calculation method, the general calculated load is determined by taking 100 percent of the first ______ plus 40 percent of the remainder.
- A. 10 kVA
- B. 8 kVA
- C. 5 kVA
- D. 15 kVA
Correct Answer: A
Per NEC 220.82(B), the general calculated load for a dwelling unit under the optional method shall be not less than 100 percent of the first 10 kVA plus 40 percent of the remainder of the listed loads.
Reference: NEC 2023 Section 220.82(B)
Online Practice vs. a PDF
- Timed: you practice finding answers under time pressure, not just reading them.
- Bookmarks: flag questions and come back, the way you will on test day.
- New sets: each attempt draws new questions from our bank.
- Scored by topic: your results show which outline topics need more study.
Next Step
- Take the free South Carolina - NASCLA-Accredited Trade for Residential Electrical Contractor practice exam.
- Study the topics where you scored lowest.
- Read the exam bulletin for the official rules, and see the licensing board's website.