West Virginia Electrical Contractor exam prep checklist: bulletin facts, topics and question counts, reference books, sample questions with answers, test-day steps.

75 questions 180 minutes 70% to pass 10 topics 2:24 per question Open book 479 questions in pool Bulletin: October 2026
Full practice exam $9.95
  • 75 questions on a 180-minute clock, like the real exam
  • Every answer explained; code questions cite the book and section so you can find it in your own copy
  • A fresh draw from 479 questions each attempt
Try 10 free questions
Study Course $59.95/month
  • Unlimited full exams, topic quizzes and study briefs
  • Cancel anytime
See the study course
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
On this page

West Virginia Electrical Contractor Exam Prep Checklist

Everything for the West Virginia Electrical Contractor exam in one place: the bulletin's key facts, the topics and how many questions each carries, the reference books, sample questions with answers, and a prep checklist. Prov gives the exam.

West Virginia Electrical Contractor Exam Facts

From the official bulletin:

Questions 75 questions
Time limit 3 hours
Passing score 70% correct
Books in the exam room Open book
Exam fee $59

On exam day

  • Answers are selected by clicking a number (1, 2, 3, or 4) on the screen.
  • You must present current, valid government-issued photo identification bearing your signature and matching your admission documents, sign the log, and be photographed.
  • Doors open at least 15 minutes before scheduled appointments and candidates should arrive early enough to be seated when testing begins.
  • Reference books must match the listed title (older/newer editions allowed), photocopies only when stated, nothing may be added or taped into a book, and a non-recommended book may be used only after signing a waiver.
  • Permanent tabs are allowed but repositionable tabs or Post-its are not; highlighting and underlining in pen are allowed; handwritten notes and formulas are not allowed.
  • Electronic devices and personal items such as notebooks, study materials, wallets, writing devices and food must be left out of the testing room in secure storage, and no note taking is allowed.

References you may bring

  • American Electrician's Handbook (17th Edition)
  • NFPA 70 - National Electrical Code 2023

Scheduling, changes and retakes

  • Candidates schedule online at Prov's scheduling site or by calling or texting Prov at (801) 733-4455.
  • You may reschedule or cancel online for free at least 3 days before your exam date, otherwise you forfeit the exam fee.
  • Arriving late after the testing session has begun means you are turned away, forfeit your exam fee, and must reschedule for a future date.
  • Your exam is graded immediately upon completion and results are automatically forwarded to your licensing authority.
  • There is no limit on attempts for the Electrical exam, but a candidate who does not pass must wait 30 days before retesting.

Source: Contractor Licensing Board — Candidate Information Bulletin, WV CIB 2026.10.27 (Version 1.0, effective October 27, 2026). Check the bulletin before test day: fees and rules can change.

West Virginia Electrical Contractor Exam Topics

The official content outline has 10 topics:

Topic Questions Share of the exam
Motors & Controls 5 7%
Equipment for General Use 6 8%
Special Occupancies 2 3%
Special Equipment 4 5%
Special Conditions 4 5%
Wiring Methods & Materials 20 27%
Communication Systems 3 4%
General Electrical Knowledge 12 16%
Plan Reading 2 3%
Wiring & Protection 17 23%

West Virginia Electrical Contractor Exam Prep Checklist

  • Get the reference books the bulletin lists, in the editions it names.
  • Learn each book's table of contents and index first.
  • Highlight the sections you use most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
  • Start with the biggest topics: Wiring Methods & Materials and Wiring & Protection (49% of the exam).
  • Take our timed practice exams until you pass several in a row.
  • After each attempt, look up every question you missed in your book.
  • Practice at the real exam's pace: about 2 minutes 24 seconds per question.

West Virginia Electrical Contractor Exam Reference Books

The Electrical Contractor exam lists the American Electrician's Handbook, 17th Edition and NFPA 70 - National Electrical Code 2023, both permitted as open book.

Where to get them:

Test Day Checklist

  • First pass: answer every question you know. Bookmark the rest. Every exam lets you return to bookmarked questions (some lock them once you take a break).
  • Second pass: work through your bookmarks.
  • Pace: 3 hours for 75 questions, which is about 2 minutes 24 seconds per question.
  • Last step: answer anything still blank. A blank can't earn a point.

Study Tips

Take this practice exam several times. The goal is to consistently clear your exam's passing score — often around 70–75% — so passing feels routine before you walk into the real test.

Our practice exam is specifically designed to mimic the testing conditions at all exam centers. While untimed PDF study guides might help with studying, they don’t prepare you for the challenge of managing your time during an actual test.

Know your way around each book's index and table of contents. Open-book exams reward speed: you need to find specific items quickly.

A little anxiety before an exam is completely normal — acknowledge it instead of fighting it. If you feel yourself spiraling on a question, pause and take a few slow breaths to reset. If your test center allows a short break, use it; just remember the clock usually keeps running.

West Virginia Electrical Contractor Sample Questions

From our practice question bank, with answers and references:

Sample 1 — Equipment for General Use

Question: As the contractor, you are installing a dead-front switchboard that is not of the totally enclosed type in an electrical room with a wood-joist (nonfireproof) ceiling, and no fireproof shield is being installed between the board and the ceiling. What minimum clearance must be maintained between the top of the switchboard and that ceiling?

  • A. 1.2 m (4 ft)
  • B. 600 mm (2 ft)
  • C. 900 mm (3 ft)
  • D. 450 mm (18 in.)

Correct Answer: C

American Electricians' Handbook, Sec. 82 (Location of switchboards) states that a clearance of at least 900 mm (3 ft) must be left between the top of a board and a nonfireproof ceiling unless an adequate fireproof shield is provided between the board and the ceiling or the switchboard is totally enclosed. Because this board is neither shielded nor totally enclosed, the full 3-ft clearance applies.

Reference: American Electricians' Handbook, 17th ed., Page 4.67 (Sec. 82, Location of switchboards)

Sample 2 — Motors & Controls

Question: A control circuit transformer installed in a motor starter enclosure supplies a Class 2 remote-control circuit. The Class 2 circuit must comply with the requirements of which of the following?

  • A. Section 450.3 transformer protection
  • B. Column A of Table 430.72(B)(2)
  • C. Part II of Article 725
  • D. Sections 724.30 through 724.52

Correct Answer: C

NEC 430.72(C)(1) requires that where the control circuit transformer supplies a Class 1 power-limited circuit, the circuit comply with 724.30 through 724.52, and where it supplies a Class 2 or Class 3 remote-control circuit, the circuit comply with the requirements of Part II of Article 725.

Reference: NEC 2023 Section 430.72(C)(1)

Sample 3 — Special Equipment

Question: The authority having jurisdiction has permitted a building's paging and background music system to be combined with the fire alarm system. The wiring of the combined system must comply with which article?

  • A. Article 722
  • B. Article 800
  • C. Article 760
  • D. Article 645

Correct Answer: C

NEC 2023, 640.3(K) states that where the authority having jurisdiction permits audio systems for paging or music, or both, to be combined with fire alarm systems, the wiring shall comply with Article 760 (power-limited and non-power-limited fire alarm circuits).

Reference: NEC 2023 Section 640.3(K)

Sample 4 — Special Conditions

Question: You are installing a Class 1 remote-control circuit fed from the secondary of a single-phase control transformer, and you intend to rely on the overcurrent device on the primary side to protect the Class 1 secondary conductors. This is permitted only where the transformer secondary is:

  • A. Rated 30 volts or less
  • B. 2-wire, single-voltage
  • C. Fed through current-limiting impedance
  • D. 3-wire with a grounded neutral

Correct Answer: B

NEC 2023, 724.45(D) permits Class 1 circuit conductors supplied by the secondary of a single-phase transformer having only a 2-wire (single-voltage) secondary to be protected by primary-side overcurrent protection (not exceeding the secondary conductor ampacity multiplied by the secondary-to-primary voltage ratio). Transformer secondaries other than 2-wire are not considered protected by the primary device.

Reference: NEC 2023 Section 724.45(D)

Online Practice vs. a PDF

  • Timed: you practice finding answers under time pressure, not just reading them.
  • Bookmarks: flag questions and come back, the way you will on test day.
  • New sets: each attempt draws new questions from our bank.
  • Scored by topic: your results show which outline topics need more study.

Next Step

Frequently Asked Questions

How much does the West Virginia Electrical Contractor exam cost?
The exam fee is $59.00, paid to Prov at the time of registration. Payment is accepted by MasterCard, Visa, or AMEX.
How many questions are on the WV Electrical Contractor exam and how long do I have?
The exam has 75 questions and you have 180 minutes (3 hours) to complete it. A score of 70% or higher is required to pass.
Is the West Virginia Electrical Contractor exam open book?
Yes, it is open book. The two listed references, both marked Open Book in the bulletin, are the NFPA 70 National Electrical Code 2023 and the American Electrician's Handbook, 17th Edition (McGraw Hill).
What are the rules for bringing reference books to the WV Electrical Contractor exam?
Book titles must be exact, though older or newer editions are permitted. Permanent tabs are allowed, but repositionable tabs and Post-it notes are not. You may highlight or underline in pen only, but you cannot mark in books during the exam. Handwritten notes, formula sheets, indexes (such as Tom Henry or Kelly), and anything glued or taped into a book are not allowed. Photocopies are not permitted for this exam.
Can I bring a book that isn't on the official reference list for the WV Electrical Contractor exam?
Yes, the Board allows candidates to bring any book of their choosing, but you must sign a waiver acknowledging that the book was not used to write the exam and may not answer its questions.
How do I register for the West Virginia Electrical Contractor exam?
Register online by going to Prov's website, clicking 'Schedule an Exam,' selecting 'New Test-taker,' and choosing 'WV - West Virginia Contractor Licensing Board' and 'Electrical Contractor.' You can also call or text Prov at (801) 733-4455, available 8:00 am to midnight ET, Monday through Friday. When registering, enter your name exactly as it appears on your government-issued photo ID, including any middle initial or middle name.
Where can I take the WV Electrical Contractor exam?
You can test at any of Prov's 6 West Virginia testing centers located in Beckley, Charleston, Fairmont, Huntington, Martinsburg, and Wheeling. You may also test at any Prov center in the United States or take the exam remotely from home using the Examroom.ai platform.
What ID do I need to bring on exam day for the WV Electrical Contractor exam?
You must bring a current, valid government-issued photo ID that includes your signature — such as a driver's license, passport, or military ID. Expired IDs are not accepted.
If I fail the WV Electrical Contractor exam, how long do I have to wait before retaking it?
You must wait 30 days before retesting. There is no limit on the number of attempts you may make.
When will I get my results after taking the WV Electrical Contractor exam?
Prov's system grades your exam immediately upon completion and automatically forwards the results to the West Virginia Contractor Licensing Board. For questions about licensing itself, contact the Board at (304) 558-7890.
Do I need to take any other exam besides the WV Electrical Contractor trade exam to get my license?
Yes. Every West Virginia contractor license also requires the separate WV Contractor Licensing Act exam (90 questions, 180 minutes, 60% to pass, open book, $59.00), which replaced the Business & Law exam effective February 2, 2026. Questions about which exams your license needs go to the West Virginia Contractor Licensing Board at (304) 558-7890.
Is the WV Electrical Contractor exam offered in Spanish?
Yes. Prov offers the Electrical Contractor exam in English and Spanish; you choose the language when you select the exam at registration.

Reference books

2 books on the bulletin
As an Amazon Associate we earn from qualifying purchases.
Took this practice exam? Tell other candidates how it went.
10 free questions30 min · no account
Start Free Exam