National · Pearson VUE

ICC G29 Master Mechanical Exam (2018 IMC/IFGC) Practice Exam

100 questions 240 minutes 70% to pass 7 topics 2:24 per question Open book 422 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$9.95

Complete exam simulation matching the real Pearson VUE test format.

  • 100 questions (same as real exam)
  • 240 minute time limit
  • 7 topic areas covered
  • 422 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 7 topic quizzes and this full exam. $59.95/month.
See the study course

ICC G29 Master Mechanical (2018 IMC/IFGC) Practice Exam Guide

Built from the official Pearson VUE exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 100
Administration General Regulations30
Appliances & Mechanical Equipment27
Duct Systems12
Exhaust and Ventilation Systems11
Chimneys and Vents8
Combustion Air6
Fuel Supply Systems6

This practice exam follows the official content outline for the ICC G29 Master Mechanical (2018 IMC/IFGC) exam: Administration General Regulations, Appliances & Mechanical Equipment, Exhaust and Ventilation Systems, Duct Systems, Combustion Air, Chimneys and Vents, Fuel Supply Systems.

You have two ways to practice. The free practice exam gives you 10 questions per attempt, and you can retake it as often as you like. The full practice exam gives you 100 questions on a 4 hours clock, with a new draw from our question bank every attempt.

7 topics

Administration General Regulations 30 items

Our study plan for this topic: General Installation Requirements; Code Definitions and Terms; Plan Reading; Testing; Permits and Permit Applications; Code Official Authority and Enforcement; Inspections and Inspection Procedures; Violations, Stop Work Orders, and Penalties.

Appliances & Mechanical Equipment 27 items

Our study plan for this topic: Heating Equipment & Gen App Installation; Water Heaters and Boilers; Cooling and Refrigeration Systems; Hydronic and Other Systems; Refrigerant Classification and Safety Groups (ASHRAE 34 toxicity/flammability designations); Machinery Room Requirements (construction, ventilation rates, refrigerant detectors, emergency controls); Refrigerant Piping Materials, Joints, and Installation Restrictions; Maximum Allowable Refrigerant Quantities by Occupancy Type.

Exhaust and Ventilation Systems 11 items

Our study plan for this topic: Exhaust Fan & Product Conveying Systems; Commercial Hoods & Kitchen Ventilation; Clothes Dryer Exhaust Systems; Domestic Cooking Exhaust Equipment; Hazardous Exhaust Systems; Smoke Control Systems; Exhaust Discharge Location & Outlet Termination Requirements; Mechanical Ventilation Rates & Outdoor Air Requirements.

Duct Systems 12 items

Our study plan for this topic: Duct Construction, Installation & Plenums; Smoke and Fire Dampers; Return Air Openings and Restrictions; Duct Insulation, Coverings, and Vapor Retarders; Flexible Ducts and Air Connectors; Duct Joints, Seams, and Sealing Requirements; Smoke Detection Systems Control for Air Distribution; Air Filters in HVAC Systems.

Combustion Air 6 items

Our study plan for this topic: Venting of Fuel Burning Appliances; Indoor combustion air requirements — standard method (50 cubic feet per 1,000 Btu/h); Known air-infiltration-rate method for determining required volume (Equations 3-1 and 3-2); Outdoor combustion air — two-permanent-openings and one-permanent-opening methods with sizing criteria; Combination indoor and outdoor combustion air method; Mechanical combustion air supply systems and appliance interlock requirements; Louvers, grilles, and screens — net free area calculations and motorized louver interlocks; Combustion air duct construction, installation, and termination requirements.

Chimneys and Vents 8 items

Our study plan for this topic: Venting of Fuel Burning Appliances; Chimney and Vent Connectors; Appliance categories and vent system type selection (Table 503.4/802.2); Vent and chimney termination height and location requirements; Sizing of Category I appliance venting systems using code tables; Masonry chimney construction, lining, and flue requirements; Factory-built chimney listing, installation, and clearance requirements; Draft hoods, draft controls, and vent dampers.

Fuel Supply Systems 6 items

Our study plan for this topic: Fuel Supply Installation, Testing and Sizing; Piping materials, fittings, and joint types for gas systems; CSST bonding and electrical continuity requirements; Pressure regulators, shutoff valves, and flow controls; Piping support intervals and protection against physical damage; Prohibited locations and underground installation requirements for gas piping; Purging procedures and leak detection methods; Fuel oil piping materials, joints, valves, and system installation.

3 questions

Sample 1 — Administration General Regulations

Question: Which device is defined as one responsive to changes in pressure, temperature or level for turning on, shutting off or throttling the gas supply to an appliance?

  • A. Limit control
  • B. Automatic vent damper device
  • C. Flame safeguard
  • D. Interlock

Correct Answer: A

IMC 2018, Section 202, defines LIMIT CONTROL as 'a device responsive to changes in pressure, temperature or level for turning on, shutting off or throttling the gas supply to an appliance.' A flame safeguard shuts off fuel when the means of ignition becomes inoperative or flame failure occurs; an interlock governs succeeding operations of associated devices; an automatic vent damper device opens and closes the venting system as the appliance cycles.

Reference: IMC 2018 Section 202 — Limit Control

Sample 2 — Appliances & Mechanical Equipment

Question: You are conducting a safety inspection of an existing forced-air furnace. With the furnace operating, you want to check for heat exchanger leaks. Which method does the inspection procedure recommend?

  • A. Perform a static pressure test on the vent connector
  • B. Measure the temperature differential across the supply and return plenums
  • C. Check for flame disturbance before and after the blower comes on
  • D. Introduce tracer gas into the flue and sample at the supply register

Correct Answer: C

Per IFGC Appendix D, Section D.6(1)(e), the inspector should check for flame disturbance before and after the blower comes on, which can indicate heat exchanger leaks. This is a practical operating test listed in the appliance-specific inspection procedures for forced-air furnaces.

Reference: IFGC 2018 Appendix D, Section D.6(1)(e)

Sample 3 — Duct Systems

Question: You are locating a return air opening for a forced-air system in a large open space that also contains an appliance equipped with a draft hood. Measured in any direction from that draft hood, the return air opening shall not be located less than:

  • A. 3 feet
  • B. 15 feet
  • C. 6 feet
  • D. 10 feet

Correct Answer: D

IMC 2018 Section 601.5, Item 1 requires that return air openings be located not less than 10 feet, measured in any direction, from an open combustion chamber or draft hood of another appliance located in the same room or space. The same 10-foot separation is used in the exception permitting return air from a kitchen relative to cooking appliances.

Reference: IMC 2018 Chapter 6 — Section 601.5 Return air openings

Treat your first attempt as a checkup, not a verdict. After every attempt, the results page breaks your score down by outline topic, so you can see which topics need work. Compare your score with the real exam's passing score, 70% correct, and keep practicing until you pass consistently.

  • Answer what you know first. Go through every question once, answer the ones you know, and bookmark the rest. Our practice exams let you bookmark and come back.
  • Come back to your bookmarks. Work them out on your second pass.
  • Watch your pace. The real exam works out to about 2 minutes 24 seconds per question.
  • Look up every miss. After each attempt, find each missed question's reference in your book and read the section.

Questions 100 questions
Time limit 4 hours
Passing score 70% correct
Books in the exam room Open book
Exam fee $120
  • Results for examinations taken electronically are available immediately after the examination is completed.
  • You must wait 10 days before retaking a failed exam.

Source: National Contractor/Trades Examination Information Bulletin, PUBLISHED June 30, 2026; ICC Exam Catalog, checked October 6, 2026. Check the bulletin before test day: fees and rules can change.

Reference books

2 books on the bulletin
As an Amazon Associate we earn from qualifying purchases.
10 free questions30 min · no account