Kansas · Pearson VUE

Kansas Journeyman Plumber with Gas Exam (ICC KGR, 2018 IPC/IFGC) Practice Exam

70 questions 180 minutes 75% to pass 8 topics 2:34 per question Open book 293 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$9.95

Complete exam simulation matching the real Pearson VUE test format.

  • 70 questions (same as real exam)
  • 180 minute time limit
  • 8 topic areas covered
  • 293 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 8 topic quizzes and this full exam. $59.95/month.
See the study course

Kansas Journeyman Plumber with Gas (ICC KGR, 2018 IPC/IFGC) Practice Exam Guide

Built from the official Pearson VUE exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 70
Administration General Regulations24
Gas Piping13
Plumbing Fixtures8
Water Supply and Distribution8
Sanitary Drainage6
Plumbing Vent Requirements5
Traps, Interceptors, and Separators5
Storm Drainage1

This practice exam follows the official content outline for the Kansas Journeyman Plumber with Gas (ICC KGR, 2018 IPC/IFGC) exam: Administration General Regulations, Plumbing Fixtures, Water Supply and Distribution, Sanitary Drainage, Plumbing Vent Requirements, Traps, Interceptors, and Separators, Storm Drainage, Gas Piping.

You can practice two ways. The free practice exam gives you 10 questions per attempt, and you can retake it whenever you like. The full practice exam gives you 70 questions on a 3 hours clock, with a new draw from our question bank each attempt.

8 topics

Administration General Regulations 24 items

Our study plan for this topic: General Installation Requirements; Code Definitions and Terms; Plan Reading; Testing; Materials; Permits: application, issuance, expiration, and exemptions; Duties and authority of the code official; Inspections: types, sequence, and approval requirements.

Plumbing Fixtures 8 items

Our study plan for this topic: Water Heaters; Water Closets and Urinals; Specialty Fixtures; Bathtubs, Showers, Sinks, and Lavatories; Minimum Number of Required Plumbing Fixtures by Occupancy; Fixture Installation Requirements and Clearances; Faucets, Fixture Fittings, and Shower Valve Temperature Limits; Flushing Devices for Water Closets and Urinals.

Water Supply and Distribution 8 items

Our study plan for this topic: Service Distribution and Piping; Water Supply and Pressure; Protection of Potable Water Supply; Pipe Materials and Approved Standards for Water Service and Distribution; Joining Methods and Connection Types by Pipe Material; Fixture Supply Pipe Sizing and Flow Rate Requirements; Hot Water System Requirements and Temperature Controls; Valve Placement and Shutoff Requirements.

Sanitary Drainage 6 items

Our study plan for this topic: Building Sanitary Drainage; Sumps and Ejectors; Indirect and Special Waste Systems; Drainage pipe materials and applicable standards (above-ground, underground, and building sewer); Pipe joint types and methods by material; Slope and installation requirements for horizontal drainage piping; Drainage fixture unit values and system sizing; Cleanout requirements, placement, sizing, and access.

Plumbing Vent Requirements 5 items

Our study plan for this topic: Vent Connections and Grades; Vent Terminals; Vent Pipe Sizing and Developed Length; Trap-to-Vent Distance and Fixture Vents; Air Admittance Valves; Wet Venting Systems; Vent Stack and Relief Vent Requirements; Venting Methods (Individual, Common, Circuit, Combination Waste and Vent).

Traps, Interceptors, and Separators 5 items

Our study plan for this topic: Installation of Traps; Interceptors and Separators; Trap seal depth requirements and protection methods; Prohibited trap types; Trap sizing and dimensional requirements; Grease interceptor capacity and flow-through ratings; Oil separator design and capacity requirements; Sand, clothes washer, and specialty interceptors.

Storm Drainage 1 item

Our study plan for this topic: Storm Drainage; Sizing of vertical conductors, leaders, and horizontal storm drains using rainfall rate tables; Primary and secondary (emergency overflow) roof drains and scuppers; Prohibited connections and disposal requirements for storm water; Approved pipe materials for inside conductors, underground storm drains, and building storm sewers; Roof drain installation requirements and flow rate calculations; Storm drainage traps: requirements, sizing, and cleanouts; Subsoil drain pipe materials and installation.

Gas Piping 13 items

Our study plan for this topic: Gas Piping for Service & Distribution Piping; Gas Piping Requirements, Specific Appliances Equipment; Source of Combustion Air & Duct Openings; Fuel-burning Appliance, Vent, Connector; CSST bonding and electrical continuity requirements; Piping materials, standards, and prohibited materials; Pipe sizing methods and use of sizing tables; Pressure testing, inspection, and purging of piping systems.

3 questions

Sample 1 — Administration General Regulations

Question: A building sewer has been laid and inspected, and your crew is ready to backfill the trench with loose earth free of rocks and frozen chunks. In what layer thickness must the backfill be placed and tamped, and to what cover depth over the pipe must this procedure continue?

  • A. 6-inch layers; crown covered by 12 inches
  • B. 6-inch layers; crown covered by 6 inches
  • C. 12-inch layers; crown covered by 24 inches
  • D. 4-inch layers; crown covered by 12 inches

Correct Answer: A

Per IPC 306.3, loose earth free from rocks, broken concrete and frozen chunks shall be placed in the trench in 6-inch (152 mm) layers and tamped in place until the crown of the pipe is covered by 12 inches (305 mm) of tamped earth.

Reference: IPC 2018 Chapter 3 — Section 306.3 Backfilling

Sample 2 — Gas Piping

Question: What is the minimum vertical clearance required above the cooking top of a household cooking appliance to combustible material when no protective measures are installed?

  • A. 18 inches
  • B. 36 inches
  • C. 24 inches
  • D. 30 inches

Correct Answer: D

Per IFGC Section 623.7, household cooking appliances shall have a vertical clearance above the cooking top of not less than 30 inches (760 mm) to combustible material and metal cabinets. This clearance may be reduced to 24 inches when specific protective measures are installed.

Reference: IFGC 2018 Section 623.7

Sample 3 — Plumbing Fixtures

Question: A drain valve installed at the bottom of a tank-type water heater must have an inlet of what minimum nominal iron pipe size, and what type of threads at the outlet?

  • A. 1/2-inch nominal with male garden hose threads
  • B. 1-inch nominal with female garden hose threads
  • C. 3/4-inch nominal with male garden hose threads
  • D. 3/4-inch nominal with female pipe threads

Correct Answer: C

Per IPC Section 501.3, drain valves for emptying shall be installed at the bottom of each tank-type water heater. The drain valve inlet shall be not less than 3/4-inch nominal iron pipe size and the outlet shall be provided with male garden hose threads.

Reference: IPC 2018 Section 501.3

Your first attempt tells you where you're starting from. After every attempt, the results page shows your score for each outline topic, so you can see what to study next. Compare your score with the real exam's passing score, a minimum score of 75, and keep going until you pass consistently.

  • Answer the questions you know first, and bookmark the rest. Our practice exams let you bookmark and come back.
  • Return to your bookmarks on the second pass.
  • Keep a steady pace. The real exam works out to about 2 minutes 34 seconds per question.
  • After each attempt, look up each missed question's reference and read the section.

Questions 70 questions
Time limit 3 hours
Passing score a minimum score of 75
Books in the exam room Open book
Exam fee $115
  • Results for examinations taken electronically are available immediately after completion of the examination.
  • You must wait 10 days before retaking a failed exam.

Source: State of Kansas Contractor/Trades Examination Information Bulletin, PUBLISHED August 20, 2026 (page headers read "December 9, 2025"). Check the bulletin before test day: fees and rules can change.

Reference books

2 books on the bulletin
As an Amazon Associate we earn from qualifying purchases.
10 free questions30 min · no account