Mississippi HVAC Practice Exam
Free Practice Exam
Test your knowledge with 10 questions from our pool of 20 free questions.
- 10 questions per attempt
- 30 minute time limit
- Unlimited attempts
- A new mix each time
- Instant results
Full Practice Exam
Complete exam simulation matching the real PSI test format.
- 80 questions (same as real exam)
- 240 minute time limit
- 20 topic areas covered
- 530 questions in pool
- Detailed explanations
Texts preferred · 9am–9pm Central
Mississippi HVAC Practice Exam Guide
What's on the exam
Questions per topic, out of 80This practice exam follows the official content outline for the Mississippi HVAC exam: Piping, Insulation, Hangers and Supports, Sound, Vibration and Seismic Control, Heating and Cooling Principles, Refrigerants and Refrigeration, Load Calculations, Testing, Adjusting and Balancing, Controls, A/C and Heat Pump Equipment, Furnaces and Heaters, Chimneys, Flues and Vents, Combustion Air, Fuel Gas Systems, LP Gas Systems, Ducts, Boilers and Hydronics, Machine Room, Evaporative Cooling, Safety.
You can practice two ways. The free practice exam gives you 10 questions per attempt, and you can retake it whenever you like. The full practice exam gives you 80 questions on a 4 hours clock, with a new draw from our question bank each attempt.
Piping 4 items
Our study plan for this topic: Gas piping materials, specifications, and approved pipe types (steel, copper, CSST, PE, polyamide); Gas piping sizing methods — longest length, branch length, and hybrid pressure approaches; Allowable pressure drop and maximum operating pressure for gas piping systems; Pipe joint types and connection methods (threaded, brazed, welded, press-connect, flared); Hydronic piping materials, fittings, and joint standards (IMC Chapter 12); LP-Gas piping service limitations, pressure ratings, and installation requirements (NFPA 58); Piping support, protection, and spacing requirements; Fuel oil piping materials, joints, and system installation requirements (IMC Chapter 13).
Insulation 1 item
Our study plan for this topic: R-values of common building materials (batt, board, loose fill, spray-on insulation types); Duct wall insulation R-value requirements and correction factors (R-2 through R-8); Effect of insulation R-value on heating and sensible cooling duct loads; Opaque panel U-values and HTM calculation for walls, ceilings, roofs, and floors; Vapor retarders for externally insulated ducts in humid climates; Duct insulation fire and smoke ratings (flame spread and smoke-developed index requirements per IMC Section 604); Double-wall duct insulation construction and liner installation standards; Compression correction factors for batt and blanket insulation.
Hangers and Supports 3 items
Our study plan for this topic: Hanger spacing requirements for horizontal ducts (maximum intervals and proximity to elbows and branch intersections); Minimum hanger sizes for rectangular duct by half-perimeter and support spacing; Minimum hanger sizes for round duct by diameter and support spacing; Upper attachment methods and allowable load limits (safety factor of 4 relative to failure load); Lower attachment methods for connecting hangers to duct; Trapeze hanger selection and load calculation; Riser support methods and spacing intervals for vertical ducts; Effects of flexible duct sag and compression on pressure drop and equivalent length.
Sound, Vibration and Seismic Control 1 item
Our study plan for this topic: Noise sources in HVAC systems (blower, fittings, dampers, outlets); Air velocity limits for noise control in duct runs and outlets; Duct geometry design to acoustically decouple noise sources from occupied spaces; Vibration isolation methods for equipment and ductwork; Crosstalk prevention through duct layout and line-of-sight avoidance; Noise attenuation using duct liner, duct board, and sound traps; Noise Criteria (NC) values for residential and multi-family occupancies; Vibration isolation connectors and flexible duct connections per IMC Chapter 6.
Heating and Cooling Principles 3 items
Our study plan for this topic: Heat transfer mechanisms (conduction, convection, radiation); Sensible heat and latent heat distinctions; Compression refrigeration cycle components and operation; Thermal resistance values (K-value, C-value, R-value, U-value); Indoor and outdoor design temperatures for load calculations; Manual J residential and Manual N commercial load calculation methods; Heat pump heating and cooling modes and efficiency ratings; Refrigerant classification, environmental impact, and pressure-temperature relationships.
Refrigerants and Refrigeration 6 items
Our study plan for this topic: Refrigerant classification by chemical type (CFC, HCFC, HFC, HFO, HC); Environmental regulations and refrigerant phasedown (Montreal Protocol, Clean Air Act, AIM Act, Kigali Amendment); Refrigerant identification, numbering system, and safety classifications (ASHRAE 34, ODP, GWP); Refrigerant cylinders: types, color coding, DOT regulations, and safe handling; Refrigerant recovery, recycling, and reclamation procedures and equipment; System evacuation procedures and vacuum measurement; Checking refrigerant charge by superheat and subcooling methods; IMC Chapter 11 refrigeration system classification, occupancy requirements, and machinery room provisions.
Load Calculations 10 items
Our study plan for this topic: Heating and cooling design temperature selection (indoor and outdoor design conditions); Thermal resistance and transmittance values (R-value, U-value, K-value, C-value) for building components; Fenestration heating and cooling load calculations using HTM values; Opaque panel heating and cooling load calculations (walls, ceilings, floors, doors); Infiltration load estimation methods (ACH method, component leakage area method); Duct system load calculations (heat loss, sensible and latent gain factors, leakage and insulation effects); Internal loads (occupants, appliances, lighting) for cooling load estimates; Engineered ventilation sensible and latent load calculations.
Testing, Adjusting and Balancing 1 item
Our study plan for this topic: Air-side balancing procedures and damper adjustment; Airflow measurement instruments and methods (flow hood, anemometer, pitot tube, velometer); Blower door testing for building envelope airtightness and duct leakage; Duct leakage testing using duct blaster pressurization; System operating point determination using blower curves and system resistance curves; Available static pressure calculation and friction rate design values; Air velocity limits for ducts, grilles, registers, and diffusers; Duct system noise problems and draft identification and correction.
Controls 3 items
Our study plan for this topic: Thermostat types, sensing elements, and operational principles; Motor starting relays (current, potential, PTC, and solid-state); Pressure motor controls (high-pressure, low-pressure, oil pressure, and safety controls); Control system fundamentals (range adjustment, differential adjustment, cut-in and cut-out settings); Direct digital control (DDC) systems and building automation systems (BAS); Zoned system controls (dampers, zone control panels, bypass dampers, and freezestats); Heat pump controls (reversing valve operation, defrost controls, and thermostat wiring terminals); Electronic expansion valves (EEVs) and solenoid valve control applications.
A/C and Heat Pump Equipment 4 items
Our study plan for this topic: Split system configurations (central, mini-split, multi-split, VRF); Heat pump operating principles and reversing valve operation; Compressor types and protection devices (reciprocating, rotary, scroll); Metering device types and selection (capillary tube, fixed orifice, TXV, biflow valves); Packaged and self-contained equipment types (room AC, PTAC, PTHP, rooftop units); Geothermal and water-source heat pump system types and components; Heat pump efficiency ratings and defrost controls (SEER2, HSPF2, reverse cycle defrost, auxiliary heat); Commercial system types (chillers, VRF, cooling towers, compressor capacity control).
Furnaces and Heaters 4 items
Our study plan for this topic: Gas furnace sequence of operation and heat exchanger types (primary vs. secondary, condensing vs. noncondensing); Gas burner types and ignition systems (atmospheric, power, standing-pilot, intermittent-pilot, DSI, HSI); Gas furnace safety and operational controls (high-limit switch, rollout switch, pressure switch, ignition control module lockout functions); Combustion principles and efficiency testing (CO2, O2, CO content, stack temperature, gas pressure measurement); Oil furnace components and operation (gun burner, fuel unit, primary control unit, cad cell relay, stack relay); Electric heating systems and controls (resistance elements, sequencers, duct heaters, baseboard units, safety cutoffs); Heat pump heating operation, defrost controls, and auxiliary heat; Venting categories, vent types, and installation requirements for gas-fired appliances (Type B, direct-vent, Category I–IV, chimney sizing).
Chimneys, Flues and Vents 3 items
Our study plan for this topic: Vent system types and appliance matching (Type B, BW, L, single-wall metal pipe, special gas vent); Chimney and vent termination height and location requirements; Sizing of Category I venting systems using code tables (single and multiple appliances); Vent connector installation requirements (slope, length, clearances, materials, joints); Masonry chimney requirements (lining, cleanouts, inspection, reuse with gas appliances); Factory-built chimney listing, installation, and support requirements; Draft hoods, draft controls, and mechanical draft systems; Direct-vent and Category II/III/IV appliance venting requirements.
Combustion Air 2 items
Our study plan for this topic: Indoor combustion air requirements and volume calculations; Outdoor combustion air methods and opening sizing; Combustion air duct requirements and installation; Primary air, secondary air, and excess air in gas burners; Makeup air units and negative pressure prevention; Dampered openings and motorized louver interlocks; Mechanical combustion air supply systems and appliance interlocks; Protection from corrosive or flammable fumes in combustion air supply.
Fuel Gas Systems 9 items
Our study plan for this topic: Gas piping materials, fittings, and allowable pipe types (steel, copper, CSST, PE); Gas pipe sizing methods and capacity tables (longest length, branch length, hybrid pressure); Gas piping pressure requirements and maximum operating pressure limits; Gas piping installation requirements (support, identification, testing, purging, and leak detection); Venting system types and appliance category matching (Type B, BW, L, direct-vent, single-wall metal); Chimney and vent sizing, termination heights, and clearance requirements; LP-Gas container types, installation, separation distances, and location requirements (NFPA 58); Combustion air requirements for gas-fired appliances (indoor, outdoor, and combined methods).
LP Gas Systems 5 items
Our study plan for this topic: Container location and separation distance requirements; Pressure regulator types, selection, and installation; LP-Gas piping materials, joints, and installation requirements; Piping system sizing methods and tables for undiluted propane; Container appurtenances including pressure relief valves, excess-flow valves, and liquid level gauges; LP-Gas transfer operations and safety procedures; Cylinder storage requirements inside and outside buildings; Corrosion protection for underground and aboveground LP-Gas systems.
Ducts 10 items
Our study plan for this topic: Duct sizing calculations using ACCA Manual D (friction rate, available static pressure, total effective length); Rectangular duct construction standards (gauge selection, reinforcement schedules, pressure classification); Round, oval, and flexible duct construction standards (gauge, seams, joints, negative pressure requirements); Duct leakage, sealing requirements, and testing methods; Duct insulation requirements and efficiency (R-values, conduction losses, vapor retarders); Duct system types and layout (radial, extended plenum, reducing trunk, trunk-and-branch); Duct hangers, supports, and installation requirements; Fitting equivalent lengths and their effect on duct system design.
Boilers and Hydronics 4 items
Our study plan for this topic: Boiler types and classifications (conventional vs. condensing, cast-iron vs. steel vs. copper-tube, wet-base vs. dry-base); Boiler safety devices and controls (pressure-relief valves, low-water cutoff, aquastat, high-limit control, flow switch); Hydronic system piping configurations (series loop, one-pipe, two-pipe direct return, two-pipe reverse return, zoned systems); Expansion tanks and air-removal components (bladder/diaphragm tanks, air scoops, air separators, air vents); Hydronic system valves (mixing valves, balancing valves, pressure-reducing valves, backflow preventers, flow-control valves, zone valves); Hydronic piping materials, joints, and installation requirements per IMC Chapter 12; Radiant hydronic systems (wet and dry underfloor installation methods, PEX tubing, manifolds, embedded piping code requirements); Boiler water treatment, system start-up, balancing, and troubleshooting (water quality, glycol, cavitation, circulation problems).
Machine Room 1 item
Our study plan for this topic: Machinery room design and construction requirements (IMC Section 1105); Machinery room ventilation requirements: normal and emergency rates; Refrigerant detectors and emergency pressure control systems; Fuel-burning appliances and open flame restrictions in machinery rooms; Means of egress requirements for machinery rooms; Special requirements for flammable refrigerant machinery rooms (Groups A2, A3, B2, B3); Remote control and emergency shutoff systems for machinery room equipment; LP-Gas facility construction, ventilation, and heating requirements (NFPA 58 Chapter 10).
Evaporative Cooling 2 items
Our study plan for this topic: Basic principles of evaporative cooling and psychrometrics (dry-bulb, wet-bulb, relative humidity relationships); Direct evaporative cooler components and operation (wetted media/excelsior pads, blower, water supply, pump); Wet roof cooling methods (roof ponds and roof mist cooling systems); Indoor/greenhouse evaporative cooling applications; IMC Section 928 installation requirements for evaporative cooling equipment (level platform, water supply, wall/roof flashing, air intake location); Cooling towers and evaporative condensers installation requirements (location, drift eliminators, drainage, water supply per IMC Section 908); Climate suitability and limitations of evaporative cooling (hot, dry vs. humid climates); Absorption and Evaporative Cooling Systems.
Safety 4 items
Our study plan for this topic: Lockout/tagout (LOTO) procedures and requirements; Personal protective equipment (PPE) selection and use; Electrical hazards and GFCI protection on construction sites; Fire hazards, fire extinguisher classes, and PASS technique; Fall protection systems (guardrails, personal fall arrest, safety nets); Ladder and stairway safety requirements; Refrigerant and pressure vessel hazards; Hazard communication and Safety Data Sheets (SDS).
Sample 1 — Load Calculations
Question: When determining the outdoor design temperature (ODT) for a heating load calculation, which ASHRAE percentage value is recommended for use with well-constructed, well-insulated buildings having a standard number of windows?
- A. 95%
- B. 97.5%
- C. 99.6%
- D. 99%
Correct Answer: D
ASHRAE provides three ODT values for each locality. The 99.6% value is used for residences and small, poorly insulated office buildings. The 99% value is used for well-constructed and well-insulated buildings with a standard number of windows. The 97.5% value is used for large buildings with considerable thermal capacity and small total window area.
Reference: Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 32 - Heating and Cooling Loads, Page 722 (20th ed.: Page 991)
Sample 2 — Ducts
Question: You are designing rectangular duct over 120 inches wide for a 6 in. wg pressure class system. What is the maximum reinforcement spacing permitted for this construction?
- A. 2.5 ft
- B. 4 ft
- C. 3 ft
- D. 2 ft
Correct Answer: D
Per Table 2-49 (Figure 2-13) of the SMACNA HVAC Duct Construction Standards, for ducts over 120 in. wide at 6 in. wg (1500 Pa) pressure class, the reinforcement spacing is 2 ft (0.60 m), with Kt class reinforcement and 18 ga (1.31 mm) panel gage. The maximum tie rod spacing for this condition is 5 ft (1.50 m). Note that S1.28 specifies tie rod intervals not exceeding 60 in. for 6 in. wg or less, which is distinct from the reinforcement spacing.
Reference: SMACNA HVAC-DCS Table 2-49 (Figure 2-13)
Sample 3 — Fuel Gas Systems
Question: Unless one of the listed special conditions applies (such as welded or brazed joints or location in a ventilated chase), what is the maximum operating pressure permitted for a gas piping system located inside a building?
- A. 3 psig
- B. 2 psig
- C. 5 psig
- D. 10 psig
Correct Answer: C
Per IFGC 2021 Section 402.7, the maximum operating pressure for piping systems located inside buildings shall not exceed 5 psig except where one of the eight listed conditions is met (welded/brazed joints, listed fittings, ventilated chase, specific occupancy uses, temporary construction piping, agricultural use, or NFPA 58 LP-gas systems over 20 psi).
Reference: IFGC 2021 Page 4-2
Your first attempt tells you where you're starting from. After every attempt, the results page shows your score for each outline topic, so you can see what to study next. Compare your score with the real exam's passing score, 70% correct, and keep going until you pass consistently.
- Answer the questions you know first, and bookmark the rest. Our practice exams let you bookmark and come back.
- Return to your bookmarks on the second pass.
- Keep a steady pace. The real exam works out to about 3 minutes per question.
- After each attempt, look up each missed question's reference and read the section.
| Questions | 80 questions |
| Time limit | 4 hours |
| Passing score | 70% correct |
| Books in the exam room | Open book |
| Exam fee | The examination fee is $120 for one examination portion and $240 for two examination portions, charged for each registration whether it is a first attempt or a retake. |
- Results are given immediately on screen, with a performance summary for passers and a diagnostic report of strengths and weaknesses for those who fail.
- You may retest an unlimited number of times during your 6-month eligibility period, paying the fee each time.
Source: State of Mississippi Contractor Examinations Candidate Information Bulletin, Updated 4/23/2026. Check the bulletin before test day: fees and rules can change.