Mississippi · PSI

Mississippi Mechanical Contractor Practice Exam

100 questions 240 minutes 70% to pass 23 topics 2:24 per question Open book 598 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$9.95

Complete exam simulation matching the real PSI test format.

  • 100 questions (same as real exam)
  • 240 minute time limit
  • 23 topic areas covered
  • 598 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 23 topic quizzes and this full exam. $59.95/month.
See the study course

Mississippi Mechanical Contractor Practice Exam Guide

Built from the official PSI exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 100
Gas Systems10
Isometric Analysis8
Boilers and Hydronics6
Sheet Metal and Ducts6
Plumbing Fixtures and Equipment5
Piping, valves, controls5
Water Supply5
Drain, Waste, and Vent5
Load Calculations5
Hangers and Supports4
Traps and Interceptors4
Safety4
Fire Sprinklers4
Refrigerants and Refrigeration4
Heating and Cooling Principles4
HVAC Equipment4
Cleanouts3
Developed length3
Joints and Connections3
General Plumbing Regulations3
Water Heaters2
Backflow2
Testing, Adjusting and Balancing1

This practice exam is built around the official content outline for the Mississippi Mechanical Contractor exam: Boilers and Hydronics, Gas Systems, Cleanouts, Plumbing Fixtures and Equipment, Water Heaters, Piping, valves, controls, Sheet Metal and Ducts, Water Supply, Hangers and Supports, Drain, Waste, and Vent, Backflow, Traps and Interceptors, Developed length, Isometric Analysis, Safety, Joints and Connections, General Plumbing Regulations, Fire Sprinklers, Refrigerants and Refrigeration, Heating and Cooling Principles, Load Calculations, Testing, Adjusting and Balancing, HVAC Equipment.

There are two ways to practice. The free practice exam gives you 10 questions per attempt, and you can take it as many times as you like. The full practice exam gives you 100 questions on a 4 hours clock, with a new draw from our question bank each time.

23 topics

Boilers and Hydronics 6 items

Our study plan for this topic: Boiler types and classifications (conventional vs. condensing, cast-iron vs. steel vs. copper-tube, wet-base vs. dry-base); Safety and relief valve requirements and discharge piping installation; Boiler controls (aquastat, low-water cutoff, high-limit control, flow switch, pressure-reducing valve); Hydronic system piping configurations (series loop, one-pipe, two-pipe direct/reverse return, zoned systems); Expansion tank types, sizing, and installation requirements; Hydronic piping materials, joints, and connection methods per IMC Chapter 12; Air removal components and procedures (air vents, air scoops, air separators, bleeding and purging); Radiant hydronic systems (wet and dry underfloor installation methods, embedded piping requirements, insulation and thermal break).

Gas Systems 10 items

Our study plan for this topic: Gas piping materials, fittings, and allowable pipe types (metallic pipe, copper tubing, CSST); Gas piping sizing methods and capacity tables (longest length, branch length, hybrid pressure methods); Gas piping pressure requirements and pressure testing; LP-Gas container types, installation, and separation distances (NFPA 58); LP-Gas pressure relief devices and container appurtenances; Venting system types and appliance categories (Type B, B-W, single-wall, direct-vent, Category I–IV); Chimney and vent sizing, termination requirements, and clearances; Combustion air requirements for gas appliances.

Cleanouts 3 items

Our study plan for this topic: Cleanout placement intervals for horizontal drains, building drains, and building sewers; Cleanout requirements at changes of horizontal direction greater than 45 degrees; Cleanout requirement at the building drain and building sewer junction; Cleanout sizing relative to pipe size served; Cleanout installation arrangement and direction of flow requirement; Required clearance distances at cleanout openings; Cleanout access requirements and prohibition against concealed locations; Cleanout plugs: approved materials, head types, and trim cover provisions.

Plumbing Fixtures and Equipment 5 items

Our study plan for this topic: Minimum number and type of plumbing fixtures by occupancy classification; Fixture installation requirements (clearances, spacing, and setting); Fixture materials, standards, and product approvals; Flushing devices for water closets and urinals; Shower and bathtub valves, temperature limits, and anti-scald requirements; Water heater safety devices, relief valves, and installation requirements; Accessible plumbing fixtures and facilities (ICC A117.1 dimensional requirements); Grease interceptors, oil separators, and trap requirements.

Water Heaters 2 items

Our study plan for this topic: Temperature and pressure relief valve requirements and discharge piping specifications; Water heater installation requirements including access, clearances, and attic installations; Safety devices including antisiphon devices, vacuum relief valves, and shutdown provisions; Cold water supply valve and drain valve requirements; Water heater labeling, certification, and pressure marking of storage tanks; Combination potable water heating and space heating systems with temperature limiting; Drain pan requirements including materials, dimensions, and drain termination; Unfired hot water storage tank insulation requirements.

Piping, valves, controls 5 items

Our study plan for this topic: Pipe and tubing materials selection and standards (steel, copper, plastic, brass, stainless steel); Pipe joining methods (threaded, welded, grooved, brazed, soldered, solvent-cemented, press-connect); Pipe sizing and gas piping capacity tables (longest length, branch length, and hybrid pressure methods); Pipe support, hanger spacing, and hanger rod sizing requirements; Valve types and functions (isolation, pressure-reducing, backflow prevention, expansion, solenoid, pressure-relief); Refrigerant metering devices and expansion valves (TXV, AXV, EEV, float controls); Hydronic piping system components (fittings, flexible connectors, expansion compensators); Protection of piping against freezing, corrosion, and mechanical damage.

Sheet Metal and Ducts 6 items

Our study plan for this topic: Rectangular duct gauge selection and reinforcement schedules based on static pressure class; Transverse joint types and longitudinal seam options for rectangular duct; Round and oval duct wall thickness and seam types for positive and negative pressure; Duct sealing requirements and seal classes by pressure classification; Hanger and support systems for rectangular, round, and flat oval ducts; Flexible duct installation, support, and connection requirements; Duct fittings, elbows, transitions, and branch connections; Duct accessories including volume dampers, access doors, and duct liner installation.

Water Supply 5 items

Our study plan for this topic: Potable water protection and cross-connection control (backflow prevention devices, air gaps, vacuum breakers); Water service pipe materials, standards, and joint types; Water distribution system design criteria (flow rates, pressures, and fixture supply sizing); Water piping system sizing methods (segmented loss method, fixture unit loads, pressure calculations); Water pressure regulation and booster systems (pressure-reducing valves, booster pumps, tanks); Individual water supply sources (wells, pumps, disinfection requirements); Fire suppression water supply requirements (NFPA 13 water supply types, flow/pressure/duration demands); Underground private fire service main installation (pipe materials, burial depth, restraint, hydrostatic testing).

Hangers and Supports 4 items

Our study plan for this topic: Maximum hanger spacing by pipe type and material; Hanger rod sizing requirements by pipe diameter; Fastener types and installation requirements for concrete, steel, and wood; Trapeze hanger design and section modulus selection; Support of risers and riser clamp requirements; HVAC duct hanger sizing and upper attachment methods for rectangular and round duct; Pipe support spacing for water, gas, steam, and plastic pipe lines; Seismic bracing and earthquake protection requirements for hangers.

Drain, Waste, and Vent 5 items

Our study plan for this topic: Drainage fixture unit (DFU) values and system sizing; Slope and installation requirements for horizontal drainage piping; Cleanout placement, sizing, and access requirements; Trap requirements, prohibited traps, and trap seal protection; Vent types, sizing, and maximum developed length; Grease interceptors, oil separators, and other interceptor requirements; Indirect waste connections, air gaps, and air breaks; Pipe materials, fittings, and joint methods for DWV systems.

Backflow 2 items

Our study plan for this topic: Types of backflow (backsiphonage vs. backpressure) and hazard levels (high vs. low); Backflow preventer device selection per Table 608.1 (air gap, reduced pressure principle assembly, double check assembly, vacuum breakers, dual check valve); Specific application requirements for backflow protection (boilers, sprinkler systems, lawn irrigation, carbonated beverage dispensers, hose connections, humidifiers); Minimum air gap dimensions per Table 608.16.1; Cross-connection control and prohibition of cross connections without approved protection; Location, access, and installation requirements for backflow prevention assemblies; Inspection and testing of backflow prevention assemblies (annual inspections, test standards per Section 312.10); Water Supply and Distribution.

Traps and Interceptors 4 items

Our study plan for this topic: Fixture trap requirements: dimensions, seal depth, and prohibited trap types; Trap seal protection methods: primer valves, barrier devices, and fixture drain connections; Grease interceptor requirements: where required, sizing, and installation; Automatic grease removal devices and hydromechanical grease interceptors; Oil separators: where required, design requirements, and capacity calculations; Sand, solids, and specialty interceptors: clothes washers, bottling plants, and slaughterhouses; Venting, access, and maintenance of interceptors and separators; Trap sizing relative to fixture drain size and drainage fixture unit values.

Developed length 3 items

Our study plan for this topic: Calculating total effective length of duct runs using fitting equivalent lengths; Equivalent length values for duct fittings by group (elbows, tees, takeoffs, transitions); Determining available static pressure and design friction rate for duct sizing; Equivalent length of pipe fittings and valves for gas piping systems; Developed length calculations for pipe bends including setback and arc length; Equivalent length allowances for fittings in water supply piping systems; Longest length method for gas piping system sizing using developed pipe length; Full Text.

Isometric Analysis 8 items

Our study plan for this topic: Reading and interpreting pipe isometric drawings; Calculating offset dimensions including travel, run, and offset relationships; Determining setback and arc length for standard bend angles; Rolling offset calculations using the Pythagorean theorem; Pipe fitting allowances and laying lengths in isometric layouts; Locating bend starting and ending points along pipe runs; Multi-bend layouts including double offsets and 90-degree turns; Full Text.

Safety 4 items

Our study plan for this topic: Lockout/tagout (LOTO) procedures and requirements; Personal protective equipment (PPE) selection and use; Fall protection systems (guardrails, safety nets, personal fall arrest); Fire protection, prevention, and extinguisher selection; Electrical safety and ground-fault circuit interrupter (GFCI) requirements; Confined space entry requirements and permit procedures; Hazard communication, safety data sheets (SDS), and toxic/hazardous substance exposure limits; Ladder and stairway safety requirements.

Joints and Connections 3 items

Our study plan for this topic: Soldered and brazed joint procedures for copper tubing and pipe; Threaded pipe joints and connection requirements; Mechanical and grooved coupling connections; Solvent-cement joints for plastic pipe (ABS, PVC, CPVC); Flared and swaged tubing connections; Push-fit, press-connect, and compression-type fittings; Heat-fusion joints for polyethylene and polypropylene pipe; Duct seams, joints, and connection requirements for metallic and nonmetallic duct systems.

General Plumbing Regulations 3 items

Our study plan for this topic: Permit requirements and code administration; Required inspections and testing procedures; Pipe support, protection, and installation requirements; Trenching, excavation, and backfill requirements; Materials identification, approval, and third-party certification; Prohibited materials and connections to drainage and water supply systems; Flood hazard resistance requirements for plumbing systems; Minimum plumbing fixture counts by occupancy type.

Fire Sprinklers 4 items

Our study plan for this topic: Sprinkler system types (wet pipe, dry pipe, preaction, deluge); Sprinkler location requirements and allowable omissions; Sprinkler spacing, coverage areas, and deflector positioning by sprinkler type; Piping installation requirements (materials, schedules, fittings, and joining methods); Pipe hangers, support spacing, and seismic bracing requirements; Hydraulic calculations and working plan submittal requirements; Storage occupancy protection (commodity classification, CMDA, CMSA, ESFR, and in-rack sprinklers); System acceptance testing (hydrostatic tests, operational tests, and contractor certification).

Refrigerants and Refrigeration 4 items

Our study plan for this topic: Refrigerant classification (CFCs, HCFCs, HFCs, HFOs, HCs) and environmental impact (ODP, GWP); EPA regulations, Clean Air Act Section 608, and refrigerant handling certification requirements; Refrigerant cylinders: storage, disposable, and recovery cylinder types, DOT regulations, and safe handling; Refrigerant recovery, recycling, and reclaiming procedures and equipment; Leak detection methods and equipment (electronic, ultrasonic, fluorescent dye, halide torch); System evacuation procedures, vacuum pumps, and micron gauge use; Refrigerant charging methods: checking charge by superheat and subcooling; Pressure-temperature relationships and gauge manifold use in refrigeration service.

Heating and Cooling Principles 4 items

Our study plan for this topic: Heat transfer mechanisms (conduction, convection, radiation); Sensible heat and latent heat calculations; Thermal resistance and insulation values (R-value, U-value, K-value, C-value); Heating and cooling load calculation methods (Manual J, Manual N); Compression refrigeration cycle operation (evaporation, condensation, compression, metering); Heat pump heating and cooling modes and efficiency ratings (COP, SEER, HSPF); Design temperatures and indoor/outdoor temperature differentials; Gas laws and pressure-temperature relationships in refrigerant systems.

Load Calculations 5 items

Our study plan for this topic: Heat transfer principles and thermal properties (K-value, C-value, R-value, U-value); Outdoor and indoor design temperatures and conditions (Manual N Table 1A); Fenestration heating and cooling loads (HTM calculations, U-value, SHGC, PSF, CLF); Opaque panel heating and cooling loads (walls, roofs, ceilings, floors, CLTD method); Infiltration load calculations (air change method, tightness categories, door traffic); Internal loads (lighting, occupants, equipment heat gains); Duct system loads (conduction, leakage, insulation R-value, supply and return systems); Ventilation loads (engineered ventilation, sensible and latent heat equations, altitude correction).

Testing, Adjusting and Balancing 1 item

Our study plan for this topic: Airflow measurement instruments and methods (flow hood, anemometer, pitot tube, manometer); System air balancing procedures and damper adjustment; Duct leakage testing (blower door and duct blaster methods); Available static pressure and device pressure loss calculations; Friction rate and total effective length determination; Air velocity limits for ducts and supply outlets; Blower performance data interpretation and operating point; Filter inspection and pressure drop measurement.

HVAC Equipment 4 items

Our study plan for this topic: Compression refrigeration cycle components (compressor, condenser, metering device, evaporator); Compressor types and classifications (reciprocating, rotary, scroll, screw, centrifugal; hermetic vs. semi-hermetic vs. open-drive); Gas-fired heating systems (furnace types, heat exchangers, combustion, burners, ignition systems, AFUE ratings); Air-source heat pumps (reversing valve operation, heating/cooling modes, efficiency ratings, defrost controls); Split and self-contained air-conditioning systems (central, ductless mini-split, VRF, PTAC, packaged units); Electric heating systems (resistance elements, electric furnaces, duct heaters, baseboard units); Hydronic heating systems (boilers, circulating pumps, expansion tanks, terminal units, hydronic controls); Oil-fired heating systems (fuel oil properties, oil burner components, combustion efficiency testing).

3 questions

Sample 1 — Gas Systems

Question: A factory-built chimney is being selected for a medium-heat appliance producing flue gases at a temperature above 1,000°F measured at the entrance to the chimney. The chimney must be listed and labeled in accordance with which standard?

  • A. UL 641
  • B. UL 103
  • C. UL 441
  • D. UL 959

Correct Answer: D

Per IFGC 506.3, factory-built chimneys for medium-heat appliances producing flue gases above 1,000°F shall be listed and labeled in accordance with UL 959. UL 103 covers factory-built chimneys for building heating appliances at or below 1,000°F (506.1); UL 441 covers Type B and BW vents and UL 641 covers Type L vents (503.6.1).

Reference: IFGC 2021 Sections 506.1 and 506.3

Sample 2 — Isometric Analysis

Question: You are replacing a leaking gate valve in a process piping system. The existing valve has butt welding ends and operates at 600 psi. When ordering the replacement, which types of laying length tables should you consult to verify the replacement valve fits the existing piping layout?

  • A. Laying lengths for solid wedge and double disc steel gate valves with butt welding ends at 600 psi
  • B. Laying lengths for flanged wedge gate valves at 600 psi
  • C. Laying lengths for cast iron flanged wedge gate valves at 600 psi
  • D. Laying lengths for steel globe valves with butt welding ends at 600 psi

Correct Answer: A

When replacing a gate valve with butt welding ends at 600 psi, the correct table is 'Laying Lengths of Solid Wedge and Double Disc Steel Gate Valves with Butt Welding Ends' at the 600 psi pressure rating column to ensure the replacement valve has the correct Dimension A for the existing pipe layout.

Reference: Pipefitter's Handbook (3rd ed.), Chapter 1 (Full Text), Laying Lengths of Solid Wedge and Double Disc Steel Gate Valves with Butt Welding Ends

Sample 3 — Boilers and Hydronics

Question: In a lift check valve, the disc is designed to move in which direction when the valve opens and closes?

  • A. Pivoting on a hinge pin in an arc
  • B. Rotating around a central spindle axis
  • C. Vertical, rising and falling freely
  • D. Horizontal, sliding across the seat

Correct Answer: C

The working parts of lift check valves consist of a valve disc positioned so that it is free to rise and fall in a vertical direction. Pressure from the flowing liquid raises the disc, and when flow stops, the disc drops back to a closed position by gravity.

Reference: Pipefitter's Handbook (3rd ed.), Chapter 1 (Full Text), Check Valves — Description

Your first score is just a starting point. After every attempt, the results page shows how you did on each outline topic, so you can see what to work on next. Compare your score with the real exam's passing score, 70% correct, and keep at it until you pass consistently.

  • Start with the questions you know. Go through the whole exam once and bookmark anything you're unsure about. Our practice exams let you bookmark and come back.
  • Circle back to your bookmarks on the second pass.
  • Keep an eye on your pace. The real exam works out to about 2 minutes 24 seconds per question.
  • Turn every miss into a lesson. After each attempt, look up each missed question's reference in your book and read the section.

Questions 100 questions
Time limit 4 hours
Passing score 70% correct
Books in the exam room Open book
Exam fee The examination fee is $120 for one examination portion and $240 for two examination portions, charged for each registration whether it is a first attempt or a retake.
  • Results are given immediately on screen, with a performance summary for passers and a diagnostic report of strengths and weaknesses for those who fail.
  • You may retest an unlimited number of times during your 6-month eligibility period, paying the fee each time.

Source: State of Mississippi Contractor Examinations Candidate Information Bulletin, Updated 4/23/2026. Check the bulletin before test day: fees and rules can change.

10 free questions30 min · no account