South Carolina · PSI

South Carolina - Air Conditioning Practice Exam

80 questions 240 minutes 70% to pass 41 topics 3:00 per question Open book 562 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$9.95

Complete exam simulation matching the real PSI test format.

  • 80 questions (same as real exam)
  • 240 minute time limit
  • 41 topic areas covered
  • 562 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 41 topic quizzes and this full exam, plus the Business Management and Law exam. $59.95/month.
See the study course

South Carolina - Air Conditioning Practice Exam Guide

Built from the official PSI exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 80
Load Calculations7
Duct System Components5
Piping Systems4
Heat Pumps4
General Duct Systems Knowledge and Principles4
Duct Conversions/Equivalencies4
Air Conditioning Systems3
Chimneys, Flues, Vents, and Vent Connectors3
Metal Ducts3
Pumps2
Heating and Cooling Principles2
Testing, Adjusting, and Balancing (TAB)2
Furnaces (Warm Air Heating Equipment)2
Specialized Heaters2
Combustion Air2
Natural Gas2
LP Gas2
Mechanical Sheet Metal Devices/Systems2
Exhaust Systems2
Safety2
General Piping1
General Tubing1
Pipe Assembly1
Drain Piping1
Valves1
Piping Specialties1
Piping Insulation1
Hangers and Supports (General)1
Mechanical Sound, Vibration, and Seismic Control1
Water Treatment for Mechanical Systems1
Refrigerants1
Heating and Cooling Equipment1
Air Compressors1
HVACR Control Fundamentals1
Control Schematics and Wiring Diagrams1
HVACR Control Systems1
Machine Room1
General Fuel Knowledge1
Fiberglass Ducts1
Filtering Systems1
Ventilation Equipment and Devices1

This practice exam follows the official content outline for the South Carolina - Air Conditioning exam: General Piping, General Tubing, Pipe Assembly, Piping Systems, Drain Piping, Valves, Piping Specialties, Pumps, Piping Insulation, Hangers and Supports (General), Mechanical Sound, Vibration, and Seismic Control, Water Treatment for Mechanical Systems, Heating and Cooling Principles, Refrigerants, Load Calculations, Heating and Cooling Equipment, Air Compressors, Testing, Adjusting, and Balancing (TAB), HVACR Control Fundamentals, Control Schematics and Wiring Diagrams, HVACR Control Systems, Machine Room, Air Conditioning Systems, Heat Pumps, Furnaces (Warm Air Heating Equipment), Specialized Heaters, Chimneys, Flues, Vents, and Vent Connectors, Combustion Air, General Fuel Knowledge, Natural Gas, LP Gas, General Duct Systems Knowledge and Principles, Duct Conversions/Equivalencies, Mechanical Sheet Metal Devices/Systems, Duct System Components, Metal Ducts, Fiberglass Ducts, Filtering Systems, Ventilation Equipment and Devices, Exhaust Systems, Safety.

You can practice two ways. The free practice exam gives you 10 questions per attempt, and you can retake it whenever you like. The full practice exam gives you 80 questions on a 4 hours clock, with a new draw from our question bank each attempt.

41 topics

General Piping 1 item

Our study plan for this topic: Gas piping system sizing methods and sizing tables (longest length, branch length, hybrid pressure); Approved piping and tubing materials for fuel gas systems (steel, copper, CSST, polyethylene, aluminum); Piping joints, fittings, and connection methods (threaded, brazed, welded, press-connect, flared); Pressure testing, leak detection, and purging of gas piping systems; Piping support intervals and protection against physical damage; Shutoff valves and pressure regulators in gas piping systems; Hydronic piping materials, joints, and testing requirements; Refrigerant tubing types, cutting, bending, flaring, brazing, and soldering procedures.

General Tubing 1 item

Our study plan for this topic: ACR copper tubing types and specifications (soft vs. hard-drawn, Type K and L wall thickness, sizing by OD); Cutting tubing procedures and tools (tubing cutter, hacksaw blade selection, squaring, reaming, and deburring); Bending tubing methods and minimum bend radius (bending springs, lever-type benders, kinking prevention); Flared connections and fittings (single and double flares, flaring procedure, SAE vs. JIC angles, flare nut sizing); Soldering and brazing procedures (flame types, filler metals, flux application, capillary action, purging with nitrogen); Swaged connections (swaging tools, overlap length, preparation for soldered or brazed joints); Non-refrigerant tubing and pipe types (copper water tubing, ABS/PVC/CPVC plastic pipe, steel pipe, joining methods); Specialized tube couplings and dissimilar metal connections (mechanical and compression fittings for aluminum-to-copper joints).

Pipe Assembly 1 item

Our study plan for this topic: Types of refrigerant and non-refrigerant tubing and pipe (ACR copper, plastic, steel); Cutting, reaming, and bending tubing techniques and tools; Flared connections: single and double flare procedures and fittings; Soldering and brazing procedures, equipment, and filler materials; Swaged connections and specialized tube couplings; Gas piping materials, joints, and fittings per SC Fuel Gas Code; Gas pipe sizing methods, pressure drop, and allowable operating pressure; Hydronic piping materials, joint types, and installation requirements per SC Mechanical Code.

Piping Systems 4 items

Our study plan for this topic: Gas piping sizing methods and pressure drop calculations; Approved piping and tubing materials for gas, refrigerant, and hydronic systems; Piping joints and connection types (brazed, soldered, flared, threaded, mechanical); Refrigerant line components (filter-driers, sight glasses, liquid receivers, check valves, solenoid valves); Hydronic piping system designs and installation requirements; Fuel oil piping materials, joints, and installation requirements; Piping system testing and pressure requirements; Tubing cutting, bending, and fabrication techniques.

Drain Piping 1 item

Our study plan for this topic: Condensate drain pan requirements and placement relative to cooling coils; Condensation prevention on duct exteriors; Slope requirements for drainage in underground duct installations; Plastic piping and tubing in plenums (flame spread and smoke-developed index requirements); Plumbing and mechanical products in plenums listing and labeling requirements; Duct Systems.

Valves 1 item

Our study plan for this topic: Refrigerant flow control valves: shutoff, check, and solenoid valve types and operation; Service valve positions and procedures: back seated, front seated, mid-position, and cracked open; Pressure-regulating valves: crankcase pressure regulators (CPRs) and evaporator pressure regulators (EPRs); Relief valves and safety pressure devices for refrigerant systems and cylinders; Metering devices as valves: thermostatic expansion valves (TXVs), automatic expansion valves (AXVs), and electronic expansion valves (EEVs); Hydronic system valves: mixing valves, balancing valves, pressure-reducing valves, flow-control valves, backflow preventers, and zone valves; Shutoff valve placement requirements in hydronic piping systems per SC Mechanical Code; Gas piping valve and regulator requirements per SC Fuel Gas Code.

Piping Specialties 1 item

Our study plan for this topic: Refrigerant flow control valves (shutoff, check, solenoid, and service valves); Filter-driers and sight glasses/moisture indicators for refrigerant systems; Pressure-regulating valves (crankcase pressure regulators, evaporator pressure regulators, relief valves); Gas piping materials, fittings, and joint types (SC Fuel Gas Code Chapter 4); Gas piping sizing methods and pressure drop requirements; Gas piping shutoff valves and appliance connections; Hydronic piping materials, fittings, and joint types (SC Mechanical Code Chapter 12); Tubing cutting, bending, flaring, brazing, and swaging techniques.

Pumps 2 items

Our study plan for this topic: Circulating pump types and components (wet-rotor centrifugal pumps, impellers); Pump placement relative to expansion tank; Cavitation causes and effects on circulating pumps; Water circulation troubleshooting (air-bound systems, bleeding and purging procedures); Pump operation sequences in hydronic system controls; Hydronic system pressure testing requirements (100 psi minimum, 15-minute duration); Shutoff valve requirements at pumps and system equipment per SC Mechanical Code; Hydronic Heating Fundamentals.

Piping Insulation 1 item

Our study plan for this topic: Insulation flame spread and smoke-developed index requirements (ASTM E84/UL 723); Required insulation thickness per International Energy Conservation Code; Insulation characteristics for air plenum installations; Heat loss factors for bare vs. insulated hot water and steam piping (Btuh/foot); Heat gain factors for chilled water piping insulation by pipe size and R-value; Effect of pipe location (conditioned vs. unconditioned space) on piping load; Pipe heat loss calculation using temperature difference, pipe length, and insulation factor; Radiant floor system insulation and thermal break requirements.

Hangers and Supports (General) 1 item

Our study plan for this topic: Duct support requirements per SMACNA standards; Hanger and support spacing intervals for hydronic piping per Section 305; Flexible duct and factory-made duct support per manufacturer instructions; Pipe support requirements for ground-source heat pump loop systems; Protection of supported ducts from mechanical damage and weather; Structural integrity requirements for duct bracing and reinforcement; Duct Systems.

Mechanical Sound, Vibration, and Seismic Control 1 item

Our study plan for this topic: Vibration isolator selection and installation for HVAC equipment; Flexible duct and pipe connections for vibration attenuation; Seismic restraint requirements for mechanical equipment; Sound transmission control and STC ratings in HVAC systems; Noise criteria (NC) levels for occupied spaces; Acoustic duct lining and sound attenuator applications; Equipment placement and mounting to minimize structure-borne noise; General Regulations.

Water Treatment for Mechanical Systems 1 item

Our study plan for this topic: Glycol additives and freeze protection (propylene vs. ethylene glycol, mixture ratios); Scale formation and impurity limits in boiler water; Corrosion causes and prevention (chemical scavengers, corrosion inhibitors, deaeration); Water pH requirements and embrittlement prevention; Initial system preparation and boiling-out procedures (trisodium phosphate treatment); Air removal and its role in corrosion control (dissolved, free, and entrained air); Transfer fluid compatibility and flash point requirements per SC Mechanical Code; Chemical compatibility of antifreeze with piping materials in ground-source heat pump systems.

Heating and Cooling Principles 2 items

Our study plan for this topic: Heat transfer modes (conduction, convection, radiation); Sensible heat and latent heat distinctions; Thermal resistance values (R-value, U-value, K-value, C-value); Indoor and outdoor design temperatures (HTD and CTD); Heating loads: envelope conduction, infiltration, and ventilation sources; Cooling loads: solar gain, internal gains, and fenestration components; Heat pump operating principles (heating mode and cooling mode); Compression refrigeration cycle fundamentals.

Refrigerants 1 item

Our study plan for this topic: Refrigerant classification (CFC, HCFC, HFC, HFO, HC, inorganic); Ozone depletion potential (ODP) and global warming potential (GWP); Refrigerant numbering system and cylinder color codes; Refrigerant toxicity and flammability classifications (ASHRAE Standard 34 safety groups); Pressure-temperature (P/T) charts and pressure-enthalpy diagrams; Refrigerant phaseout schedules and EPA Section 608 requirements; Refrigerant recovery, recycling, and reclaiming procedures and equipment; SC Mechanical Code refrigerant quantity limits, machinery room requirements, and system classification.

Load Calculations 7 items

Our study plan for this topic: Heating and cooling temperature difference (HTD and CTD) calculations; Thermal resistance, conductance, and U-values for building assemblies; Fenestration load procedures using Heat Transfer Multipliers (HTM); Opaque panel heating and cooling loads (walls, ceilings, floors, doors); Infiltration load estimation methods (ACH table, component leakage area, blower door); Duct load factors for heating, sensible cooling, and latent cooling; Internal loads (occupants, appliances, lighting); Engineered ventilation sensible and latent load calculations.

Heating and Cooling Equipment 1 item

Our study plan for this topic: Heating and cooling load calculations (Manual J methodology); Thermal resistance, conductance, and transmittance values (R-, C-, U-, K-values); Indoor and outdoor design temperatures for heating and cooling; Gas-fired furnace components, ignition systems, and combustion efficiency; Heat pump types, components, and operating modes (air-source and ground-source); Hydronic heating system components, boiler types, and controls; Oil-fired heating system operation, combustion testing, and fuel delivery; Electric heating systems, element types, and equipment sizing.

Air Compressors 1 item

Our study plan for this topic: Compressor drive configurations (open-drive, semi-hermetic, and fully hermetic); Reciprocating compressor components and operation (pistons, crankshaft, connecting rods, valves, valve plates); Rotary compressor types (rotating-vane and stationary-blade operation); Scroll compressor operation and applications; Screw compressor operation and capacity control; Centrifugal compressor components and operation; Compressor lubrication systems (splash vs. pressure systems); Crankcase heaters and compressor cooling systems.

Testing, Adjusting, and Balancing (TAB) 2 items

Our study plan for this topic: Airflow measurement instruments and techniques (flow hoods, anemometers, pitot tubes, manometers); Balancing damper adjustment procedures for achieving design CFM at each outlet; Duct leakage testing methods (duct blaster/calibrated airflow matching system) and maximum allowable leakage limits; Blower door testing procedures and ACH50 calculations for building envelope airtightness; Maximum air velocity limits for trunk ducts, branch ducts, supply outlets, and return grilles (Table N3-1); System operating point determination using blower performance curves and duct system resistance curves; Duct noise identification and correction (noise sources, carriers, and amplifiers); Duct system cleaning procedures, tools, and IAQ considerations.

HVACR Control Fundamentals 1 item

Our study plan for this topic: Thermostat types and sensing elements (bimetal, thermistor, mercury switch, hydraulic); Low-voltage, line-voltage, and millivolt thermostat operation and wiring; Heat anticipators and cooling anticipators; Programmable and digital thermostat features, programming, and Wi-Fi/smart controls; Control system fundamentals: set point, cut-in, cut-out, range, and differential adjustment; Pressure motor controls (high-pressure, low-pressure, oil pressure safety controls); Motor starting relays (current relay, potential relay, solid-state relay, PTC relay) and contactors; Electrical test instruments and procedures (voltmeter, ohmmeter, ammeter, multimeter, megohmmeter).

Control Schematics and Wiring Diagrams 1 item

Our study plan for this topic: Pictorial diagrams vs. ladder diagrams; Schematic symbols for HVACR electrical components; Control system fundamentals: cut-in, cut-out, range, and differential adjustments; Temperature motor controls: sensing bulbs, bimetal devices, and electronic sensors; Pressure motor controls: high-pressure, low-pressure, and oil pressure controls; Motor starting relays: current, potential, solid-state, and PTC relays; Motor protection devices: fuses, circuit breakers, and bimetal/thermistor overload protectors; Direct digital control (DDC) systems: open-loop vs. closed-loop control, sensors, controllers, and actuators.

HVACR Control Systems 1 item

Our study plan for this topic: Thermostat types and sensing elements (line-voltage, low-voltage, millivolt, bimetal, thermistor); Thermostat wiring terminals and circuit diagrams (ladder and pictorial diagrams); Heat and cooling anticipators (system lag, system overshoot, temperature swing); Programmable and digital thermostats (Wi-Fi, learning, scheduling, DIP switches); Pressure motor controls (high-pressure, low-pressure, oil pressure safety controls); Motor starting relays (current, potential, solid-state, PTC relays); Motor protection devices (fuses, circuit breakers, overload protection); Zoned systems and free cooling (dampers, economizers, zone control).

Machine Room 1 item

Our study plan for this topic: Machinery room design and construction requirements (Section 1105 general requirements); Machinery room ventilation requirements (normal and emergency airflow rates); Refrigerant detector requirements and emergency system activation; Means of egress requirements for machinery rooms over 1,000 square feet; Fuel-burning appliance restrictions in machinery rooms; Special requirements for flammable refrigerant machinery rooms (Groups A2, A3, B2, B3); Special requirements for Group A2L refrigerant machinery rooms; Remote controls and emergency shutoff switches for machinery room equipment.

Air Conditioning Systems 3 items

Our study plan for this topic: Compression refrigeration cycle components and operation; Residential central air-conditioning system types (unitary vs. field-erected, split systems); Ductless and self-contained air-conditioning systems (room units, PTAC, mini-splits); Commercial air-conditioning systems (rooftop units, chillers, cooling towers); Heat pump operation, types, and components (air-source, ground-source, reversing valve); Metering devices (capillary tubes, TXV, EEV, fixed-orifice); Heating and cooling load calculations (Manual J, heat transfer values, design temperatures); Thermostat types, wiring, and controls for cooling systems.

Heat Pumps 4 items

Our study plan for this topic: Heat pump operating modes (heating and cooling cycle refrigerant flow); Types of heat pumps (air-source vs. ground-source); Reversing valve operation and connections; Heat pump system components (accumulator, compressor, metering devices, coils); Defrost methods and controls (reverse cycle and electric heat defrost); Auxiliary heat and balance point; Heat pump efficiency ratings (EER, SEER, HSPF, COP); Heat pump installation, maintenance, and troubleshooting.

Furnaces (Warm Air Heating Equipment) 2 items

Our study plan for this topic: Gas furnace combustion principles and fuel types (natural gas vs. LP gas); Gas ignition systems (standing-pilot, intermittent-pilot, DSI, and HSI); Gas furnace safety controls (high-limit switch, rollout switch, pressure switch); Gas furnace efficiency ratings and categories (AFUE, Category I–IV venting); Oil furnace components and operation (gun burner, fuel unit, primary control unit, cad cell relay); Electric furnace heating elements and sequencer controls; Combustion venting systems and vent connector requirements (SC Fuel Gas Code); Heat pump auxiliary heat, defrost controls, and reversing valve operation.

Specialized Heaters 2 items

Our study plan for this topic: Electric heating element types (open wire, open ribbon, tubular cased wire); Electric furnace and duct heater controls (sequencers, contactors, airflow switches); Electric baseboard heating unit installation and controls; Electric radiant heating systems (direct and indirect infrared, radiant floor and ceiling panels); Safety controls for electric heating systems (high-limit switches, fusible links, overcurrent protection); Gas-fired specialized heaters (vented/unvented room heaters, wall furnaces, floor furnaces, unit heaters, infrared radiant heaters); Sauna heater installation requirements (guards, temperature/timer controls, ventilation, warning notices); Pool and spa heater installation requirements.

Chimneys, Flues, Vents, and Vent Connectors 3 items

Our study plan for this topic: Appliance venting categories (Category I, II, III, IV) and vent type selection; Vent and chimney termination height and location requirements; Sizing of venting systems using code tables for Category I appliances; Vent connector materials, clearances, slope, and installation requirements; Masonry chimney construction, flue lining systems, and cleanout requirements; Draft hoods, draft controls, and barometric draft regulators; Direct-vent, mechanical draft, and power exhauster systems; Condensate drainage requirements for Category II and IV appliances.

Combustion Air 2 items

Our study plan for this topic: Indoor combustion air requirements (volume and standard method calculations); Outdoor combustion air provisions (two-opening and one-opening methods); Combustion air opening sizing, location, and minimum dimensions; Combustion air ducts (materials, termination, and installation requirements); Louvers, grilles, and screens for combustion air openings; Mechanical combustion air supply and appliance interlock requirements; Combustion air requirements for oil-fired appliances (NFPA 31); Dampered combustion air openings and interlock with firing cycle.

General Fuel Knowledge 1 item

Our study plan for this topic: Combustion process and chemistry (stoichiometric, complete, and incomplete combustion); Properties and characteristics of natural gas and LP/propane gas; Gas piping materials, sizing, and pressure requirements; Fuel oil grades, properties, and storage systems; Combustion air requirements for gas-fired and oil-fired appliances; Venting and chimney systems for fuel-burning appliances; Ignition systems and gas valve controls for gas-fired equipment; Combustion efficiency testing (CO2, stack temperature, draft, and smoke tests).

Natural Gas 2 items

Our study plan for this topic: Gas piping materials and fittings (steel, copper, CSST, polyethylene); Gas piping sizing methods and pressure drop calculations; Allowable operating pressures and pressure testing requirements; Combustion air requirements for gas-fired appliances; Venting system types and appliance categories (Category I–IV); Vent and chimney sizing, termination, and clearance requirements; Gas furnace components, ignition systems, and safety controls; Combustion efficiency, flue gas analysis, and AFUE ratings.

LP Gas 2 items

Our study plan for this topic: LP gas piping system design and sizing (pressure drop, pipe sizing tables, and methods); Approved piping materials and fittings for LP gas systems (steel, copper, CSST, polyethylene); LP gas storage tank installation requirements and NFPA 58 compliance; Two-stage regulator systems for LP gas (first-stage and second-stage pressure regulation); LP gas system pressure testing, leak checks, and purging procedures; Combustion characteristics of LP gas (specific gravity, BTU content, flammability limits, air-fuel ratios); Venting requirements for LP gas appliances (categories, vent types, termination clearances); LP gas appliance installation requirements (clearances, ignition source elevation, prohibited locations).

General Duct Systems Knowledge and Principles 4 items

Our study plan for this topic: Pressure units and blower performance curves (IWC, ESP, CFM relationships); Available static pressure calculation and component pressure losses; Total effective length and friction rate determination; Fitting equivalent lengths and duct run resistance; Air velocity limits for supply and return ducts; Duct system types and configurations (radial, extended plenum, reducing trunk, perimeter loop); Duct materials, construction standards, and insulation requirements; Duct leakage, sealing methods, and system efficiency.

Duct Conversions/Equivalencies 4 items

Our study plan for this topic: Round-to-rectangular duct conversion using equal friction rate equivalency tables; Round-to-oval duct conversion using equal friction rate equivalency tables; Friction chart use to determine round duct diameter from CFM and friction rate; Friction rate calculation from available static pressure and total effective length; Duct sizing slide rule equations for round duct diameter by material type; Fitting equivalent length concept and conversion to pressure drop; Roughness factors and friction chart corrections for different duct materials; Equivalent length adjustment for non-default velocity and friction rate conditions.

Mechanical Sheet Metal Devices/Systems 2 items

Our study plan for this topic: Duct system types and configurations (radial, extended plenum, reducing trunk, perimeter loop); Duct sizing procedure using ACCA Manual D (friction rate, available static pressure, total effective length); Sheet metal duct construction materials, gauges, and fabrication standards; Duct joints, seams, and sealing methods (mastic, UL 181 tapes, mechanical fasteners); Fitting equivalent lengths and their effect on critical circulation path; Fire and smoke dampers: ratings, actuation, and installation requirements; Duct insulation requirements, vapor retarders, and R-value standards; Duct leakage testing, sealing requirements, and system efficiency impacts.

Duct System Components 5 items

Our study plan for this topic: Duct system configurations (radial, extended plenum, reducing trunk, perimeter loop); Supply and return air fitting equivalent lengths and pressure losses; Available static pressure calculation and component pressure drop deductions; Duct materials (sheet metal, fibrous glass duct board, flexible wire helix); Registers, diffusers, grilles, and supply outlet selection; Damper types and functions (balancing, fire, smoke, zone); Duct insulation requirements and vapor retarders; Duct sealing requirements and leakage testing (duct blaster, mastic, tape).

Metal Ducts 3 items

Our study plan for this topic: Metal duct sheet metal thickness requirements by duct size and static pressure classification; Duct classification by operating pressure and SMACNA construction standards; Joints, seams, and connections in metallic ducts — fastening and sealing methods; Round-to-rectangular equivalent duct sizing and aspect ratio considerations; Air velocity limits in metal supply and return trunk and branch ducts; Fitting equivalent lengths for elbows, takeoffs, boots, and transitions; Duct leakage effects on system performance and required sealing practices; Fire and smoke damper requirements for metallic ducts penetrating rated assemblies.

Fiberglass Ducts 1 item

Our study plan for this topic: Fibrous glass duct construction standards and code compliance (NAIMA, SMACNA, UL 181); EI pressure rating classifications for fiberglass duct board (475, 800, 1400); Seams, joints, and closure systems for fibrous glass ductwork (UL 181A-P, 181A-M, 181A-H tapes and mastics); Reinforcement, hangers, and supports for fiberglass duct systems; Recommended installation locations for rigid fiberglass duct board; Duct board friction rate and airway sizing using duct slide rule (vs. sheet metal equivalents); Leakage class characteristics of fibrous glass duct systems and sealing requirements; Temperature limitations for nonmetallic fiberglass ductwork (250°F maximum per SC Mechanical Code).

Filtering Systems 1 item

Our study plan for this topic: Types of air filters (disposable, washable, electrostatic, carbon, HEPA); MERV ratings and filter efficiency standards; Air filter testing and measurement methods (atmospheric dust spot efficiency, synthetic dust weight arrestance, fractional efficiency, DOP HEPA method); Electronic air cleaner operation and maintenance; Ultraviolet (UVG) germicidal light systems installation and maintenance; Ionizing air purifiers and ozone considerations; Filter pressure drop measurement and replacement intervals; Heat recovery ventilators (HRV) and energy recovery ventilators (ERV).

Ventilation Equipment and Devices 1 item

Our study plan for this topic: Minimum outdoor airflow rates and ventilation rate calculations by occupancy type; Mechanical vs. natural ventilation requirements and intake opening location/protection rules; Exhaust system requirements by occupancy and contaminant type (cooking, dryers, hazardous materials, garages); Duct construction, materials, sizing, sealing, and insulation requirements; Registers, diffusers, grilles, dampers, and airflow balancing; Fire and smoke dampers: installation, ratings, and actuation requirements; Airflow measurement instruments and testing methods (blower door, duct blaster, flow hoods, anemometers); Ventilation load calculations for heating and cooling (sensible and latent) including heat recovery equipment.

Exhaust Systems 2 items

Our study plan for this topic: Exhaust discharge location requirements and minimum separation distances; Commercial kitchen Type I and Type II hood systems; Clothes dryer exhaust duct installation and length limitations; Hazardous exhaust systems for flammable vapors, dusts, and toxic materials; Smoke control system design and equipment requirements; Makeup air requirements for exhaust systems; Ventilation system balancing, airflow measurement, and duct testing; Energy recovery ventilation systems and prohibited applications.

Safety 2 items

Our study plan for this topic: Lockout/tagout (LOTO) procedures for electrical, hydraulic, pneumatic, and mechanical systems; Personal protective equipment (PPE) selection and requirements — head, eye, hearing, respiratory, and foot protection; Fire hazards and fire extinguisher classes, types, and PASS technique; Fall protection systems — guardrail systems, personal fall arrest systems, and safety nets; Confined space entry requirements — permit spaces, atmospheric testing, and attendant duties; Electrical safety — grounding, GFCI protection, working clearances, and overcurrent protection; Hazard communication — safety data sheets (SDS), GHS pictograms, and chemical/refrigerant hazards; Safe work practices — ladder and scaffold safety, proper lifting, and first aid procedures.

3 questions

Sample 1 — Load Calculations

Question: You are sizing a heating system for a single-family residence and must select an outdoor design temperature from the ASHRAE listings for the locality. Which of the listed design values is recommended for residences and small, poorly insulated office buildings?

  • A. The 99% value
  • B. The 99.6% value
  • C. The 95% value
  • D. The 97.5% value

Correct Answer: B

Per Modern Refrigeration and Air Conditioning, Section 37.3.4, ASHRAE lists three outdoor design temperatures for each locality. The 99.6% temperature (outdoor air falls below it only 0.4% of the time, about 35 hours per year) is used for residences and small, poorly insulated office buildings. The 99% value is for well-constructed, well-insulated buildings with a standard window area, and the 97.5% value is for large buildings with considerable thermal capacity and small window area.

Reference: Modern Refrigeration and Air Conditioning (20th ed.), Page 991

Sample 2 — Duct System Components

Question: A residential duct design yields an available static pressure of 0.20 in. WC and a total effective length of 250′. What design friction rate should be used to select duct sizes from the airflow friction chart?

  • A. 0.08 in. WC per 100′
  • B. 0.02 in. WC per 100′
  • C. 0.80 in. WC per 100′
  • D. 0.05 in. WC per 100′

Correct Answer: A

Modern Refrigeration and Air Conditioning, Section 29.5.2, gives Friction rate = (ASP ÷ TEL) × 100. (0.20 in. WC ÷ 250′) × 100 = 0.08 in. WC per 100′ of duct.

Reference: Modern Refrigeration and Air Conditioning (20th ed.), Page 772

Sample 3 — Piping Systems

Question: A field bend is being made in Schedule 40 steel gas pipe using bending tools intended for that purpose. What is the minimum inside radius permitted for the bend?

  • A. Ten times the inside diameter
  • B. Twenty-five times the inside diameter
  • C. Four times the outside diameter
  • D. Six times the outside diameter

Correct Answer: D

Per Section 405.2, the inside radius of a metallic pipe bend shall be not less than six times the outside diameter of the pipe, and the pipe shall not be bent through an arc of more than 90 degrees. The 25-times-inside-diameter figure applies to plastic pipe bends under Section 405.3.

Reference: SC Fuel Gas Code 2021, Chapter 4 — Section 405.2 Metallic Pipe

Your first attempt tells you where you're starting from. After every attempt, the results page shows your score for each outline topic, so you can see what to study next. Compare your score with the real exam's passing score, 56 correct answers out of 80 scored questions, and keep going until you pass consistently.

  • Answer the questions you know first, and bookmark the rest. Our practice exams let you bookmark and come back.
  • Return to your bookmarks on the second pass.
  • Keep a steady pace. The real exam works out to about 3 minutes per question.
  • After each attempt, look up each missed question's reference and read the section.

Questions 80 questions
Time limit 4 hours
Passing score 56 correct answers out of 80 scored questions
Books in the exam room Open book
Exam fee $64
  • Your score is given immediately after the examination on screen and on a printed official report, with a diagnostic report of strengths and weaknesses if you do not pass.
  • Except for Burglar and Fire Alarm, an examination may be taken only 2 times in a 12-month period and thereafter only once in six months, and a candidate who passes an exam may not take it again.

Source: Commercial Contractor Candidate Information Bulletin, Updated 8/27/2026. Check the bulletin before test day: fees and rules can change.

10 free questions30 min · no account