Alabama Runway Contractor
Practice at the real exam's pace
Every practice exam shows your time per question against the real exam's clock (2:30 here), and each topic lands in one of these:
What's on the exam
Questions per topic, out of 30Topics
Sitework
Alabama Runway Contractor | 10 questions (33%)
Key Concepts
Excavation classification & embankment (FAA P-152) - Boulders containing a volume of more than 1/2 cubic yard (0.4 m³) are classified "rock excavation" (152-1.2b, p. 83). - Borrow outside airport property: Contractor locates the supply subject to Engineer approval and must notify the Engineer at least 15 days prior to beginning excavation (152-2.3, p. 87). - Embankment 4 feet (120 cm) or less: remove all sod/vegetable matter and break up the cleared surface by plowing or scarifying to a minimum depth of 6 in (150 mm), then compact. Where fill is greater than 4 feet, sod not required to be removed is disked and recompacted (152-2.5, p. 87). - Embankments are built in horizontal layers not more than 8 in (200 mm) loose depth; moisture within +/- 2 percent of optimum. Rolling continues to not less than 95 percent maximum density for noncohesive soils and 90 percent for cohesive soils. Outside pavement areas, no compaction is required on the top 4 in (100 mm) (152-2.6, pp. 88-89). - Stones/rock fragments larger than 4 in (100 mm) are not permitted in the top 6 in (150 mm) of subgrade (152-2.2e and 152-2.6). - Predominantly oversize rock may be placed in layers not exceeding 2 feet (60 cm), leveled with spalls and finer fragments, but not above an elevation 4 feet (120 cm) below finished subgrade (152-2.6, p. 89). - Tolerance where subbase/base will be placed: 16 ft (4.8 m) straightedge, deviation not in excess of 1/2 in (12 mm), and not more than 0.05 ft from true grade; safety areas and other designated areas 0.10 ft (152-2.9, p. 90). - Quantities by average end area; final field cross sections required if plan width changes more than ±1.0 ft (0.3 m) or plan elevation changes more than ±0.5 ft (0.15 m); verification sections randomly at intervals not exceeding 500 linear feet (152-3.4, p. 91).
Runways
Key Concepts
Portland cement concrete (P-501) - Aggregates are accepted when ASTM C 1260 expansion does not exceed 0.10% at 28 days; if any aggregate exceeds 0.10%, test the combined materials per ASTM C 1567, accepted at not more than 0.10% at 28 days (501-2.1a, p. 285). - GGBF slag is used at a rate between 25 and 55 percent of total cementitious material; but for slip-form paving with air temperature expected below 55 °F (13 °C), slag shall not exceed 30 percent (501-2.3b; 501-3.2b, p. 292). - Elapsed time from adding cementitious material until concrete is deposited: not over 30 minutes in non-agitating trucks, 90 minutes in truck mixers or agitators; water to increase slump may be added only within 45 minutes after initial mixing (501-4.6, p. 297). - Compacted underlying surface widened approximately 3 ft (1 m) beyond the paving machine track (501-4.3, p. 296). - Equipment on previously constructed pavement: planers, pavers, and finishing equipment may ride edges at 400 psi flexural; hauling/other mechanical equipment requires 550 psi (3,792 kPa), average of four field-cured specimens per 2,000 cu yd (501-4.8, p. 300). - Slip-form edge slump: not more than 15 percent of the total free edge of each 500 ft (150 m) may exceed 1/4 in (6 mm), and none shall exceed 3/8 in (10 mm) (501-5.2e(5), p. 318). - Impervious membrane cure: 1 gallon (4 liters) to not more than 150 sq ft (14 sq m) by mechanical sprayer; hand spraying requires double application (501-4.14a, p. 306).
FAA Regulations
Key Concepts
Order of precedence (Section 50-03, Page 20). Contract, plans, specifications and cited standards are complementary; a requirement in one is as binding as in all. In case of discrepancy: calculated dimensions govern over scaled dimensions; contract technical specifications govern over contract general provisions, plans, cited standards for materials or testing, and cited FAA advisory circulars; general provisions govern over plans, cited standards and cited ACs; plans govern over cited standards and cited ACs. If any paragraph in the Special Provisions conflicts with the General Provisions or Technical Specifications, the Special Provisions shall govern.
Award and execution (Sections 30-06 and 30-08, Pages 12-13). The successful bidder shall sign the necessary agreements and return the signed contract with the executed surety bond(s) within 15 calendar days from the date mailed or otherwise delivered. Failure within that period is just cause for cancellation of the award and forfeiture of the proposal guaranty.
Claims (Section 50-16, Page 25). Notify the Engineer in writing before beginning the work on which the claim is based; failure to notify, or to afford the Engineer opportunity to keep strict account of actual cost, waives the claim. After that work is completed, submit the written claim to the Engineer within 10 calendar days.
Control of materials (Section 60-01, Page 27). Statements of origin, composition and manufacture are due promptly after execution of the contract but in all cases prior to delivery of the materials. Where an FAA specification for airport lighting equipment is cited, equipment must be listed in AC 150/5345-53 and the Addendum in effect on the date of advertisement, and produced by the manufacturer listed in that Addendum for the certified part number.
Test data (Section 60-02, Page 28). A legible handwritten copy of all test data goes to the Engineer daily, with printed reports in an approved format weekly; a final report with all test data, ranges, averages and corrective actions is due after completion and prior to final payment.
Lighting
Key Concepts
Rotating beacons (Item L-101) - Mount the base first, bolt it in place, then raise the drum and assemble it to the base; mounting holes must be checked for correct spacing and the base/legs shall not be forced to fit (101-3.2). Leveling follows the manufacturer's instructions and is checked in the Engineer's presence (101-3.3). - Final beam adjustments shall be made at night, as directed by the Engineer or shown on the plans, except that in no case shall the elevation of the beams be less than 2 degrees above the horizontal (101-3.5, Page 507). - Unless otherwise specified, install at the top of the tower or mounting platform a circuit-breaker panel of four 15-ampere breakers in a weatherproof cabinet, giving separate protection to beacon lamps, motor, obstruction lights, and other equipment (101-3.8, Page 507). Cabinets: steel not less than No. 16 USS gauge (101-2.4). - Exposed wiring runs in not less than ¾ in (19 mm) galvanized rigid steel conduit; no conduit on top of the platform floor; straps approximately 5 feet apart on steel towers (101-3.9). - Two L-810 obstruction lights on opposite corners, on conduit extensions not less than 4 in (100 mm) above the top of the beacon, series-connected into the tell-tale circuit (101-3.12). - Photoelectric control energizes when northern sky illuminance falls below 60 foot candles but before reaching 35 foot candles, and de-energizes when illuminance rises to a level of not more than 60 foot candles (101-3.11). - Testing: insulation resistance to ground of the beacon supply circuit not less than 50 megohms (101-3.14). Lightning protection, if specified, is installed per 103-2.3 of Item L-103 (101-3.7).