EN ES
Study Course

California General Building (B) Contractor Exam

115 questions 210 minutes 72% to pass 5 topics 1:49 per question Closed book
Try 10 free questions Free Cheat Sheet Official Bulletin

Practice at the real exam's pace

Every practice exam shows your time per question against the real exam's clock (1:49 here), and each topic lands in one of these:

Ready Find it faster Study it Needs both Rushing: slow down

What's on the exam

Questions per topic, out of 115
Planning and Estimating17
Framing and Structural Components23
Core Trades35
Finish Trades23
Safety17

Topics

Open a topic to read its key concepts

Planning and Estimating

17 on exam · 78 practice questions

Key Concepts

Plans, scale, and drawing conventions - Residential plan views are generally drawn at 1/4" = 1'-0"; each 1/4" on the drawing equals 1'-0" of building (Modern Carpentry, 14th Ed., Ch. 7 — Scale). - Schedules (window schedule, door schedule) list quantity, rough opening sizes, descriptions, and sometimes the manufacturer, keyed by marks to the plans and elevations (Ch. 7 — Schedules). - On a cutting-plane line, the top number is the drawing number and the lower designation is the sheet; arrowheads show the direction of view (Ch. 7 — Section and Detail Drawings). - Footings on a foundation plan are shown with thin dashed hidden lines, because grade/slab conceals them (Ch. 7 — Floor, Foundation, and Plot Plans / Alphabet of Lines). - Plot plans express boundaries and elevations in feet and decimals of a foot, read with an engineer's scale (Ch. 7 — Scale / Plot Plans). "S4S" means surfaced four sides (Appendix B — Standard Abbreviations).

Documents, delivery, and administration - Bidding requirements (advertisement/invitation, instructions to bidders, bid forms, bid bond forms) are not part of the contract for construction; the agreement, bonds, certificates, general and supplementary conditions, and addenda issued before acceptance of bids do become part of it (Olin's 9th Ed., 1.6.3.3). - A bid bond guarantees the bidder will sign an agreement based on the submitted bid or forfeit the bond (Olin's 1.7.2.1). - In CSI's three-part section format, Part 3 — Execution covers examination, preparation, installation, field quality control and testing, cleaning, protection, and coordination (Olin's 1.6.3.4). - Uniformat organizes by systems and assemblies for preliminary cost estimates and cost models; MasterFormat is organized by materials and uses; MasterFormat Division 07…

Framing and Structural Components

23 on exam · 97 practice questions

California General Building (B) Contractor Exam — 23 questions / 20%

Key Concepts

Sills, girders, posts (Modern Carpentry Ch. 10) - Sill anchor bolts: maximum spacing 6' OC, one bolt within 12" of each end, at least two bolts in each sill board (Sec. 10.3). Anchoring to unit masonry: 1/2" bolts extending at least 15 in. into filled cores; 7 in. is the embedment for concrete walls (Olin's 6.6.1.2). - Girder in a foundation pocket: minimum 4" bearing, with 1/2" clearance at sides and end (Sec. 10.2). - Wood posts shorter than 9': greater post dimension equals girder width — a 6" girder takes a 6x6; an 8" girder requires a 6x8 or 8x8 (Sec. 10.2).

Joists and subfloor - I-joists: flanges may never be cut; leave at least 1/8" of web above and below each hole; between two holes, uncut web must be at least twice the longest dimension of the largest adjacent hole; a 1 1/2" hole may be made anywhere in the web (Sec. 10.5). Bearing nailing: two 8d nails, one each side, no closer than 1 1/2" from the joist end (Sec. 10.4). - OSB subfloor: fasteners 6" at supported panel ends, 12" in the field, penetrating the joist 1". Plywood subfloor uses 6" along edges, 10" at intermediate members (Sec. 10.7). - Solid lumber joists deeper than nominal 12 in.: bridging at intervals not exceeding 8 feet (Fundamentals of Building Construction, 6th Ed., Ch. 5).

Core Trades

35 on exam · 145 practice questions

Key Concepts

Drainage, waste & vent (CPC) - Horizontal drainage piping slopes not less than 1/4 in. per foot; where the depth of the street sewer, structural features, or building arrangement make that impractical, building drain piping 4 inches and larger may slope not less than 1/8 in. per foot when first approved by the AHJ (CPC §708.1). - Vents may not be flagpoled except where the roof is used for assembly or parking; vents within 10 ft of such an area extend not less than 7 feet above the roof and are securely stayed (CPC §906.3). - Fixtures on a floor level lower than the next upstream manhole cover must be protected by a backwater valve; fixtures above that elevation shall not discharge through it. Cleanouts on drains through the valve are labeled "backwater valve downstream" (CPC §710.1). - Other than single-dwelling units, an ejector receiving water closets/urinals must pass a 2 in. solid ball, discharge piping not less than 3 in. with backwater valve and gate valve, capacity not less than 20 gpm. Single dwelling units: 1-1/2 in. ball, 2 in. piping (CPC §710.3).

Traps & interceptors - Tailpiece (fixture outlet to trap weir) shall not exceed 24 inches (CPC §1001.2). - Trap seal not less than 2 in. and not more than 4 in., unless the AHJ finds a deeper seal necessary (CPC §1005.1). - "S" traps, bell traps, and crown-vented traps are prohibited; drum and bottle traps are for special conditions only (CPC §1004.1). - Fixture capacity discharging to a hydromechanical grease interceptor shall not exceed 2.5 × the certified gpm (CPC §1014.2.1).

Finish Trades

23 on exam · 102 practice questions

California General Building (B) Contractor Exam — Finish Trades

Key Concepts

Floor covering — wood - Blind nail succeeding strips through the tongue at about 50°, countersinking the fastener; only the starter strip (and the last few strips) is face nailed (Modern Carpentry 14th Ed., Ch. 20, Installing Wood Strip Flooring—Nailing). - Installation moisture content: about 6% in the dry southwestern states, about 10% in the more humid southern states, 7%–8% elsewhere (Ch. 20, Installing Wood Strip Flooring). Flooring stock is kiln-dried to 6% to 9% before milling (Olin's 9th Ed., 9.10.2.1). - Sleepers in mastic over slab: lap at least 3" with 2 1/4" flooring, 4" with 3 1/4" flooring; sleeper centers normally 12"–16" (Ch. 20, Wood Flooring over Concrete). - Plywood subfloor over slab: 3/4" spacing at walls, 1/4"–1/2" between panels, at least nine concrete nails per panel (Ch. 20). - Parquet/unit block: mastic spread 3/32" thick; about 1/2" expansion space at the wall (Ch. 20, Wood Block (Parquet) Flooring). - Laminate plank: end joints in adjacent rows offset at least 8"; don't start a row with a cutoff shorter than 8" (Ch. 20, Installing Laminate Flooring). - Board subfloor joists: not more than 16 in. o.c. when 3/4 in. strip/plank runs parallel to joists; 24 in. o.c. applies only when finish flooring runs at right angles (Olin's 9.10.1.3). - MFMA edge grain (quarter-sawn): annual rings at over 30 degrees to the face (Olin's 9.10.3.2).

Safety

17 on exam · 77 practice questions

Key Concepts

Personnel safety / PPE - Protective equipment must be distinctly marked to identify the manufacturer; exception for employer-manufactured shields, barriers, etc. (§3380(b)). - The written hazard-assessment certification must identify the workplace evaluated, the person certifying, the date(s), and identify the document as a certification of hazard assessment (§3380(f)(2)). PPE selection is a separate duty under §3380(f)(1)(A). - §3380(f) does not apply to workplace operations regulated by the Construction Safety Orders or Mine Safety Orders (§3380(f)(8)). - Hard hats: permanent marking identifies manufacturer, ANSI standard number and date, and ANSI class and impact type (§3381(d)). - Hand protection for cuts/lacerations/abrasions is not required only when the §3380(f) assessment finds the risk infrequent and superficial (§3384(a) Exception). - Footwear purchased after 1/26/2007: ASTM F2412-05 and F2413-05 (§3385(c)(1)). Purchased on or before that date: ANSI Z41-1999 or the ASTM standards (§3385(c)(2)). - Hearing protection required at 85 decibels or above for eight hours (Modern Carpentry Sec. 2.3).

Electrical — GFCI vs. assured grounding program (§2405.4) - GFCIs required on all 120-volt, single-phase, 15- and 20-ampere construction site receptacles not part of permanent wiring; exemption for two-wire single-phase portable/vehicle-mounted generators rated not more than 5 KW with conductors insulated from the frame and grounded surfaces (§2405.4(c)). - Daily visual inspection before each day's use, except cord sets and receptacles that are fixed and not exposed to damage (§2405.4(d)(3)). - Continuity/terminal tests at intervals not to exceed 3 months; fixed, undamaged-exposure cord sets and receptacles not exceeding 6 months; also before first use, after repairs, and after a suspected damaging incident (§2405.4(d)(5)). - Identification must indicate the last test date or the interval tested (§2405.4(d)(7)).

Final Practice Exam
115 questions · 210 min · timed simulation of the real exam
Never the same exam twice. Every attempt is drawn fresh from 499 questions, about 4 full exams' worth, and questions you haven't seen come first.
Law and Business Exam included
7 topics · 115 questions · 210 min

Required Books

Closed-book exam
2025 Edition
California Plumbing Code 2025
Buy on Amazon
2025 Edition
California Mechanical Code 2025
Buy on Amazon
2025 Edition
California Green Building Standards Code 2025
Buy on Amazon
2025 Edition
California Building Code 2025
Buy on Amazon
2026 Edition
Cal/OSHA Title 8 Construction Safety Orders (Subchapter 4)
Official source
2026 Edition
Cal/OSHA Title 8 General Industry and Electrical Safety Orders (selected sections)
Official source
6th Edition
Fundamentals of Building Construction: Materials and Methods, 6th Edition
Buy on Amazon
9th Edition
Olin's Construction: Principles, Materials, and Methods, 9th Edition
Buy on Amazon
2026 Edition
California Vehicle Code (selected sections)
Official source
2025 Edition
California Energy Code 2025
Official source
2025 Edition
California Residential Code 2025
Official source
2025 Edition
California Fire Code 2025
Official source
2025 Edition
California Electrical Code 2025
Official source
5.0
North American Architectural Woodwork Standards 5.0
Official source
2014 Rev 8
California MUTCD 2014 Edition, Revision 8 - Part 6 Temporary Traffic Control
Official source
14th Edition
Modern Carpentry, 14th Edition
Buy on Amazon
14th Edition
NASCLA Contractors Guide to Business, Law and Project Management – 14th Edition
Buy on Amazon
2026 Edition
Employer's Tax Guide (Publication 15, Circular E)
Official source
2026 Edition
California Contractors License Law & Reference Book, 2026 Edition
Official source
2026 Edition
California Employer's Guide (DE 44), 2026
Official source
October 2023
California Public Works Manual (Labor Commissioner), October 2023
Official source
2023 Edition
Get Licensed to Build: A Guide to Becoming a California Licensed Contractor (CSLB)
Official source
Nov 2026
Maintain and Change Your License (CSLB)
Official source
2026 Edition
California Labor Code (selected sections)
Official source
2026 Edition
California Financial Code, Division 9, Chapter 3.5 Program Administrators (PACE)
Official source
As an Amazon Associate we earn from qualifying purchases.
$59.95/monthCancel anytime. Instant access.