Louisiana Earthwork, Drainage and Levees
Practice at the real exam's pace
Every practice exam shows your time per question against the real exam's clock (2:30 here), and each topic lands in one of these:
What's on the exam
Questions per topic, out of 30Topics
Earthwork/Surveying
Key Concepts
Plans and stationing - Utility site plans are normally drawn in two scales, with the horizontal scale usually ten times the vertical (e.g., 1" = 50' horizontal, 1" = 5' vertical), which exaggerates slopes on the profile (Page 109). - Stationing runs in multiples of 100 feet; the number left of the plus is hundreds of feet. Sta 3 + 75 = 375 feet from Sta 0 + 00 (Page 111). - In utility work a slope ratio gives horizontal first, vertical second: 3:1 means 1 foot of vertical fall per 3 horizontal feet. Carpenters and plumbers reverse the order; the ratio method is not precise enough for utility line grades (Pages 118–119). - Existing contours are dashed, proposed contours solid. A proposed contour moving out over lower existing contours means fill; movement toward higher existing contours means cut (Pages 257–258). - For final design of local drainage systems, mapping typically requires 1 inch = 100 feet to 1 inch = 200 feet with 1- or 2-foot contour intervals (Design and Construction of Urban Storm Water Management Systems, Page 41).
Concrete
Key Concepts
Water-cementitious materials ratio (w/cm) - Complete hydration of portland cement requires about 40% water by mass of cement (w/c of 0.40); below about 0.40 some cement stays unhydrated — Ch. 2, Water (Evaporable and Nonevaporable), p. 43. - Concrete placed underwater: not less than 390 kg/m³ (650 lb/yd³) cementing materials, maximum w/cm 0.45 — Ch. 13, Cementitious Materials Content, p. 271. - To maximize chloride (corrosion) resistance: maximum w/cm of 0.40 or less plus at least seven days moist curing — Ch. 11, Materials and Methods to Control Corrosion, pp. 229–230. - Concrete placed directly on a vapor retarder: w/cm kept low, 0.45 or less — Ch. 15, p. 316.
Cement types and sulfate/marine exposure - Type V (high sulfate resistance): C3A not more than 5%; Type II (moderate) limit is 8% — Ch. 2, Types of Portland Cements, pp. 26–27. - ASTM C1012 mortar bars in 5% (33,800 ppm) sodium sulfate: expansion less than 0.10% at 6 months = moderate sulfate resistance; less than 0.05% at 6 months (or less than 0.10% at 12 months) = high — Ch. 20, Sulfate Resistance, p. 443. - Marine environment: cements with C3A of 4% to 10% give satisfactory performance; w/cm should not exceed 0.40; in northern climates at least 6% air — Ch. 11, Marine Environment, p. 240.
Curbs and Gutters
Key Concepts
Gutter and crown geometry (Ch. 8, "General Guidance," p. 251) - Gutter grade is the grade parallel to the direction of flow. The maximum allowable gutter grade is not governed by drainage; the minimum allowable gutter grade to facilitate proper drainage should be 0.4%. - The maximum allowable crown slope is not affected by drainage requirements, but the minimum crown slope of the street should be 2%. - The standard gutter, together with a curb, should be at least 6 inches deep and 2 feet wide, with the deepest portion adjacent to the curb. Other configurations may be used as conditions require. - Some cities use higher curbs to maintain runoff capacity after repaving, though there are no recognized design criteria for this.
Cross fall and intersections (pp. 253, 258) - With cross fall, the upper gutter fills quickly and flow proceeds across the crown into the opposite gutter. To preserve capacity in the higher gutter, the crown should be maintained within the one-quarter points of the street (p. 253). - For a local street intersecting a major street (Figure 8.10, p. 258), the figure assumes major street grade 6%, maximum allowable crown slope 4%, minimum allowable crown slope 1%, and the crown maintained within the one-quarter points. - Inverted crown (dished) streets should not be used, since during flooding they cannot function as a vehicular traffic carrier; other disadvantages…
Culverts
Key Concepts
Culvert rating (outlet control). When the tailwater is below the top of the culvert, the outlet depth term h₀ is taken as the average of critical depth and culvert diameter, (d_c + D)/2, or the tailwater depth, whichever is greater (Ch. 8 — Culverts, Design Procedure/Culvert Rating, pp. 302–305).
Culvert sizing with debris. Localities often stipulate that the engineer assume 25% debris blockage when computing required culvert size; greater blockage may be justified under certain conditions (Ch. 8 — Design Considerations, Culvert Sizing, p. 307).
Debris/safety racks at culverts. Hinged at the top to permit lifting and cleaning; sloped 3:1 to 5:1 (horizontal to vertical) so debris rides up as water rises; bar spacing such that a child cannot pass (typically maximum 6 inches clear); net open surface area at least four times the cross-sectional area of the pipe; located a considerable distance out from the entrance so entrance velocities stay low (Ch. 8, Sec. X.A.4, p. 308).
Trash racks on piped drainage systems. Assume at least 50% blockage when designing for the maximum storm runoff, and provide four times the clear opening area of the pipe being protected — both criteria apply (Ch. 13 — Maintenance of Piped Drainage Systems, Design and Construction Stage, p. 536).
One Call
All content below is from the Louisiana 811 Brochure.
Key Concepts
Notification is mandatory. Anyone planning demolition or excavating work in Louisiana must notify Louisiana 811 by calling 811 or 1-800-272-3020, or via LOUISIANA811.COM, at least two full business days before the project's start date. (Page 1 — "It's the Law!")
Call-center hours and the 6:00 p.m. rule. Louisiana 811 accepts calls Monday through Friday, excluding holidays, for normal locate requests. Damage and emergency locate requests may be called in 24 hours a day, seven days a week. Locate requests made after 6:00 p.m. are considered the next business day. (Page 1 — "It's the Law!")
Counting the wait. Member owners/operators have two business days to mark their lines, and by law you may not perform any excavation work during this time (Page 2 — Excavator FAQ). Wait two business days "excluding weekends, ticket submission date, and holidays" (Page 2 — "For Best Results").
Positive response is required by law. A utility operator or pipeline company must notify the excavator prior to the mark-by time if there is no conflict, or determine that its facilities are not fully marked for locating purposes. (Page 2 — Excavator FAQ)
Heavy Equipment/Safety
Key Concepts
Cave-in protection triggers. Each employee in an excavation must be protected by an adequate protective system except where the excavation is made entirely in stable rock, or is less than 5 feet (1.52 m) deep and a competent person's examination of the ground shows no indication of a potential cave-in (§1926.652(a)(1)). Pipe and Excavation Contracting (Page 171) adds the field rule of thumb: some cemented soils are quite stable, but it is wise to consider all trench walls over 5 feet high dangerous.
Maximum allowable slopes (Subpart P, Appendix B, Figure B-1 (B-1.1); §1926.652(b)(2)): - Type A simple slope, 20 ft or less deep: 3/4:1 - Type A short-term exception: 1/2:1, but only for simple slope excavations open 24 hours or less and 12 feet or less in depth - Type B simple slope: 1:1; Type C: 1 1/2:1
Manufacturer's tabulated data. Deviation from the specifications, recommendations and limitations issued by the manufacturer of a shield or shoring system is allowed only after the manufacturer issues specific written approval, and that approval must be in written form at the jobsite during construction of the protective system (§1926.652(c)(2)(ii)).