What's on the exam
Questions per topic, out of 60Topics
Excavation, Compaction and Grading
Key Concepts
Trench safety and soil classification - It is dangerous and illegal to have anyone working in a trench over 5 feet deep unless the trench is protected with some kind of cave-in deterrent (Page 167). - Some cemented soils are quite stable, but it is wise to consider all trench walls over 5 feet high to be dangerous (Page 171). - Changing soil conditions make a wall unsafe: a vertical wall may be safe in cemented gravel, but a pocket of loose sand or heavy loam makes it dangerous — protection must account for the weakest soil present (Page 171). - Disturbed earth can become unstable — equipment digging another trench or nearby vibratory compaction equipment may destabilize a previously safe area; piling spoil near the ditch edge also destabilizes walls (Page 171). - Wet sandy spoil from the trench bottom piled on the banks drains, seeps into the bank, lubricates the soil and can make an otherwise stable bank slip (Page 164). - Trench box bottom should sit **2 to 3…
Safety
Key Concepts
General provisions & employer duties (Subpart C). The employer must initiate and maintain programs necessary to comply with Part 1926, provide for frequent and regular jobsite, material and equipment inspections by competent persons designated by the employer, prohibit use of noncomplying machinery or equipment (tag/lock out or physically remove it), and permit only employees qualified by training or experience to operate equipment (§1926.20(b)(1)–(4)). Compliance duties are owed per employee: each failure to provide PPE to an employee may be considered a separate violation (§1926.20(f)(1)), and each failure to train an affected employee may be considered a separate violation (§1926.20(f)(2)). Employees handling poisons, caustics and other harmful substances must be instructed in safe handling and use and made aware of potential hazards, personal hygiene, and personal protective measures required (§1926.21(b)(3)). "Shall" is mandatory; "should" is recommended (§1926.32(q), (r)).
Steel
Key Concepts
Reinforcing bar sizes, grades, identification - Deformed bars are designated by a number denoting the approximate diameter in eighths of an inch — a #8 bar is 8/8 in. = 1 inch (Placing Reinforcing Bars, 10th ed., Ch. 7, Reinforcing Bar Sizes). Twelve standard sizes, #3 through #20. - Table 7-1: #9 bar — diameter 1.128 in., 3.400 lbs/ft, area 1.00 sq in. - The grade designation equals the minimum yield strength in ksi; Grade 60 = 60 ksi (Ch. 7, Types and Grades of Steel). - Grade marks (Fig. 7-2): Grade 60 = "60" or one line; Grade 75 = "75" or two lines; Grade 80 = 3 lines; Grade 120 = 4 lines. Grade lines must be continued at least 5 deformation spaces. No grade mark is required for Grades 40 and 50. Type-of-steel marks: S (A615), W (A706), SS (A955), R/I/A (A996).
Concrete
Key Concepts
Formwork economics and safety factors - Formwork costs range from 35 to 60 percent of the cost of a concrete structure (Contractor's Guide, p. 54). - The usual safety factor for form ties is 2:1 — working load of new ties limited to one-half the ultimate tensile strength (Contractor's Guide, p. 66). ACI 347R recommends a minimum safety factor of 2 based on ultimate strength of the assembly for all form ties. - The minimum safety factor for form anchors, including live loads and impact, is 3, because anchors are often loaded while the embedding concrete is still "green" (Contractor's Guide, p. 67).
Loads and pressures (SP-4 Ch. 5 / ACI 347R-14) - Dead load: 150 lb/ft³ including reinforcing steel is commonly assumed for horizontal formwork design (SP-4 §5.3.1, p. 5-3). - Minimum live load on both vertical supports and horizontal framing: 50 lb/ft² of horizontal projection; 75 lb/ft² when motorized carts are used (SP-4 §5.3.2, p. 5-4). - Minimum unfactored combined dead + live load: 100 lb/ft², or **125 lb/ft² when…
General Knowledge
Source: Pipe and Excavation Contracting
Key Concepts
Escalation (Page 27). Escalation is the increase in costs of labor, materials, and equipment between the time the bid is submitted and the time the work is actually done and paid for. It is very important during high inflation periods; include a small allowance for escalation when costs are expected to increase before the job is completed.
Variable markup methods (Pages 25–26). The 20-10-10-10 and 15-15-10-10 methods were created by estimators to compensate for differences in job makeup and risk. Labor and equipment carry the higher markup percentages (e.g., 20%) as higher-risk, more variable costs; materials and subcontracts carry the lower percentages (e.g., 10%) as more stable, fixed costs.
Unbalanced / front-end loaded bids (Pages 36–37). If markup is loaded onto particular bid items and the owner cuts back on those items, the contractor loses money because the profit was concentrated there. In the text's example, decreasing a loaded item by 50% cut the overall markup from 20% down to 10%.
Underground Utilities-Concrete Pipe Installation
Key Concepts
Pre-construction. Beyond OSHA Safety and Health Regulations for Construction, the installer should review installation practices with the engineer's design assumptions, particularly the use of trench boxes and compaction requirements of the backfill (Pre-Construction/Precautions, Page 6).
Ordering. Written order information includes project name/location; pipe size, laying length and strength; total footage; type of joint; manhole base, riser, cone sections and grade rings; fittings and specials including radius pipe; laying sequence; required specifications; material test requirements; joint material and quantity; invoicing instructions (Ordering, Receiving and Handling, Pages 6-7).
Receiving/unloading. An overall inspection of each shipment is made on arrival, before the pipe is unloaded; quantities are checked against the delivery slip and damaged or missing items recorded on the delivery document (Unloading, Pages 7-8). Slings, chain, cable and rope go around the pipe and must not be passed through it; devices passing into the pipe must not touch spigot or bell jointing surfaces. With lifting holes, the common device is a steel threaded eye bar with wing nut and bearing plate; if none is…
Underground Utilities-Ductile Pipe Installation
All citations: DIPRA Installation Guide for Ductile Iron Pipe
Key Concepts
Receiving, Inspection, and Handling (Chapter 1) - Material found defective due to manufacture, or damaged in shipment, is recorded on the delivery receipt or similar document by the carrier's agent. Shortages or errors found when verifying against shipping papers are also recorded on the bill of lading by the carrier's agent. The manufacturer or contractor is responsible for replacing defective materials. (Sec. 1.1, p. 8) - Damaged cement-mortar lining is repaired per ANSI/AWWA C104/A21.4: cut out to the metal with perpendicular or slightly undercut edges, apply stiff mortar to the wetted area, trowel smooth, cure. (Sec. 1.1, pp. 8–9) - Pipe tongs: if the pipe contacts trench bracing protruding above the ground, the tongs may release the pipe prematurely. Separately, in freezing weather keep pipe-holding pads ice-free to avoid slippage. (Sec. 1.6, pp. 13–14) - Special exterior coatings: pad slings, hooks, and tongs; inspect coatings once the handling device is removed. Polyethylene-encased pipe damage is repaired with polyethylene tape or by taping a…
MS One-Call
Key Concepts
Advance notice for standard excavation. An excavator shall provide not less than three (3) and not more than ten (10) working days' advance notice to Mississippi 811, Inc., before beginning any excavation — this excludes emergencies and submerged excavation (§77-13-5(1)(a)).
Scope of the locate request ticket. The proposed excavation location is limited to an area the excavator reasonably believes may be completed within 20 calendar days, and it "does not include any area in which the excavator has already completed the excavation work." Including already-completed areas is a violation of the chapter (§77-13-5(1)(a)). A "calendar day" is a twenty-four-hour period (§77-13-3(d)).
Approximate location (tolerance). "Approximate location of underground utility lines or underground facilities" must be accurate within eighteen (18) inches measured horizontally from the outside edge of each side of the operator's facility, or a strip of land 18 inches either side of the operator's field mark, or the marked width plus 18 inches on each side (§77-13-3(b)). For submerged facilities, approximate location must be accurate **within fifteen (15) feet of the…