EN ES
Mississippi · PSI

Mississippi Municipal Practice Exam

60 questions 120 minutes 70% to pass 8 topics 2:00 per question Open book 336 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$6.95

Complete exam simulation matching the real PSI test format.

  • 60 questions (same as real exam)
  • 120 minute time limit
  • 8 topic areas covered
  • 336 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 8 topic quizzes and this full exam, plus the Law and Business Exam. $59.95/month.
See the study course

Mississippi Municipal Practice Exam Guide

Built from the official PSI exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 60
Concrete15
Steel10
Excavation, Compaction and Grading8
Safety7
Underground Utilities-Concrete Pipe Installation7
Underground Utilities-Ductile Pipe Installation7
General Knowledge3
MS One-Call3

This practice exam follows the official content outline for the Mississippi Municipal exam: Excavation, Compaction and Grading, Safety, Steel, Concrete, General Knowledge, Underground Utilities-Concrete Pipe Installation, Underground Utilities-Ductile Pipe Installation, MS One-Call.

  • Free practice exam: 10 questions per attempt, retake as often as you like.
  • Full practice exam: 60 questions on a 2 hours clock, a new draw from our bank every attempt.

8 topics

Excavation, Compaction and Grading 8 items

Our study plan for this topic: Backhoe components, hydraulics, and operating principles; Backhoe production rate calculation and operator efficiency; Trench safety, shoring systems, and cave-in prevention; Soil compaction methods, Proctor testing, and density determination; Cut and fill volume estimation using cross section and average end area methods; Rock classification, rippability, and blasting techniques; Groundwater management and dewatering methods; Site preparation, clearing, pavement removal, and material layout.

Safety 7 items

Our study plan for this topic: General safety and health provisions and employer accident prevention responsibilities; Personal protective equipment (PPE) selection, use, and employer payment requirements; Fall protection systems — guardrail, safety net, and personal fall arrest system requirements; Scaffold erection, capacity, and fall protection requirements; Excavation hazards, cave-in protective systems, and competent person inspections; Fire protection, fire prevention, and flammable liquid storage and handling; Confined space entry procedures, permit requirements, and atmospheric monitoring; Medical services, first aid requirements, and emergency action planning.

Steel 10 items

Our study plan for this topic: Reinforcing bar types, grades, and identification markings; Concrete cover requirements and placement tolerances for reinforcing bars; Bar supports: types, sizes, and placement; Fabrication of reinforcing bars: bending shapes, splices, and spirals; Placing reinforcing bars in footings, walls, columns, floors, and roofs; Open web steel joist and joist girder products: types, erection, and bridging requirements; Post-tensioning tendon installation, stressing, and elongation measurement; Unloading, storing, handling, and inspection of steel reinforcement and joist products.

Concrete 15 items

Our study plan for this topic: Formwork design loads: vertical dead and live loads, lateral concrete pressure; Formwork materials: lumber, plywood, engineered wood, steel, and aluminum; Design of formwork members: slab, wall, beam, and column forms; Shoring and reshoring design for multi-story concrete structures; Formwork safety requirements and OSHA compliance; Form removal and stripping criteria based on concrete strength; Concrete mixture properties and field testing (slump, air content, compressive strength); Formed concrete surface quality, tolerances, and surface finish classifications.

General Knowledge 3 items

Our study plan for this topic: Estimating direct costs: labor, equipment, and materials; Overhead calculation: direct job overhead and indirect office overhead; Markup, profit, contingency, and escalation in bidding; Bonding types: bid bonds, performance bonds, payment bonds, and maintenance bonds; Contract provisions: change orders, liquidated damages, warranties, and indemnity; Crew and equipment productivity: cycle times, operator ability, and job efficiency factors; Trench excavation quantity calculations: soil states, swell, and volume formulas; Reading plans and surveying: elevations, grades, optical levels, and laser alignment.

Underground Utilities-Concrete Pipe Installation 7 items

Our study plan for this topic: Pre-construction ordering, receiving, and inspection of concrete pipe and box culverts; Unloading, handling, and stockpiling concrete pipe without damage; Trench excavation dimensions, trench width requirements, and dewatering; Pipe bedding types and compaction requirements (Standard Installations Types 1–4, Class A–D beddings); Jointing procedures, gasket types, and sealant materials for concrete pipe; Backfill placement, compaction equipment selection, and soil density testing; Acceptance testing methods (infiltration, exfiltration, low-pressure air, vacuum, and visual inspection); Box culvert installation including alignment, placement sequence, jointing, and minimum cover for construction loads.

Underground Utilities-Ductile Pipe Installation 7 items

Our study plan for this topic: Receiving, inspection, and safe unloading of ductile iron pipe; Trench excavation requirements, dimensions, and bedding conditions; Push-on and mechanical joint assembly procedures; Thrust restraint methods: thrust blocks, restrained joints, and tie rods; Backfill material requirements and compaction procedures; Hydrostatic pressure testing and allowable leakage; Disinfection methods for new water mains; Service taps: direct taps, saddle taps, and corporation stops.

MS One-Call 3 items

Our study plan for this topic: Advance notice requirements and timelines for excavation; Excavator pre-marking obligations before notification; Emergency and impending emergency excavation procedures; Operator marking responsibilities and APWA color codes; Tolerance zone requirements and safe digging practices; Large project excavation and preconstruction meeting process; Damage reporting requirements for struck underground facilities; Civil penalties and enforcement by the Underground Facilities Damage Prevention Board.

3 questions

Sample 1 — Concrete

Question: You are selecting form-facing materials for a project that specifies a T3 texture classification on the as-cast formed surfaces. What is the maximum acceptable surface offset of panel joints for this classification?

  • A. 1/8 in.
  • B. 1/2 in.
  • C. 1 in.
  • D. 1/4 in.

Correct Answer: D

Per SP-4 Table 13.2, the T3 texture classification specifies acceptable surface offsets of panel joints up to 1/4 in. (consistent with ACI 117-10, Section 4.8.3, Class B). T1 allows up to 1 in. (Class D), T2 allows up to 1/2 in. (Class C), and T4 allows up to 1/8 in. (Class A).

Reference: ACI SP-4 Formwork for Concrete (8th ed.), Page 13-12 (Table 13.2)

Sample 2 — Steel

Question: After a post-tensioning tendon is stressed and the wedges are seated, there is an immediate reduction in tendon stress due to seating loss, elastic shortening, and friction. Over what time period do the remaining long-term volume changes and steel relaxation losses typically occur?

  • A. 1 to 5 years
  • B. 30 to 90 days
  • C. 10 to 15 years
  • D. 6 to 12 months

Correct Answer: A

Per the PTI Field Procedures Manual, Chapter 2, over a longer period of time (from one to five years) other volume changes occur in the concrete and steel will relax slightly, resulting in additional losses that reduce the final effective prestress.

Reference: PTI Field Procedures Manual, Chapter 2 - Background of Prestressed Concrete and Post-Tensioning

Sample 3 — Excavation, Compaction and Grading

Question: You are estimating a grading project and need to calculate cut and fill volumes for a prism that contains both cut areas and fill areas. What estimating technique should you use for this prism?

  • A. The Average End Area Method, treating the cut section and fill section separately
  • B. The contour interval method using only the proposed elevations
  • C. The truncated prism method using only the highest and lowest corner elevations
  • D. The standard Cross Section Method using average corner depths for the entire prism

Correct Answer: A

According to Pipe & Excavation Contracting (Page 264), to calculate cut and fill volumes in prisms requiring both cut and fill, use the Average End Area Method. The prism is divided into two distinct sections by the zero line — one section is cut and the other is fill — and volumes are calculated separately for each using the Average End Area Method.

Reference: Pipe and Excavation Contracting, Page 264

  • Your results break the score down by outline topic.
  • The real exam's passing score: 70% correct.
  • Keep practicing until you pass consistently, not just once.

  • Answer what you know first and bookmark the rest. Our practice exams let you bookmark and come back.
  • Work your bookmarks on the second pass.
  • Real exam pace: about 1 minute 43 seconds per question.
  • After each attempt, look up every miss in your book.

Questions 60 scored questions plus up to 10 unscored experimental questions that count against your time
Time limit 2 hours
Passing score 70% correct
Books in the exam room Open book
Exam fee The examination fee is $120 for one examination portion and $240 for two examination portions, charged for each registration whether first time or repeat.
  • A failing candidate may retest an unlimited number of times during the 6-month eligibility period, paying the fee each time, and must reapply with the Board if not passing within 6 months.

Source: State of Mississippi Contractor Examinations Candidate Information Bulletin, Updated 11/11/2026. Check the bulletin before test day: fees and rules can change.

10 free questions30 min · no account