EN ES
South Dakota · Pearson VUE

South Dakota Electrical Contractor Exam (ICC 530, 2023 NEC)

South Dakota Electrical Contractor (ICC 530, 2023 NEC) exam prep checklist: bulletin facts, topics and question counts, reference books, sample questions with answers, test-day steps.

100 questions 300 minutes 70% to pass 9 topics 3:00 per question Open book 460 questions in pool Bulletin: August 2025
Full practice exam $9.95
  • 100 questions on a 300-minute clock, like the real exam
  • Every answer explained; code questions cite the book and section so you can find it in your own copy
  • A fresh draw from 460 questions each attempt
Try 10 free questions
Study Course $59.95/month
  • Unlimited full exams, topic quizzes and study briefs
  • Cancel anytime
See the study course
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
On this page

South Dakota Electrical Contractor (ICC 530, 2023 NEC) Exam Prep Checklist

Everything for the South Dakota Electrical Contractor (ICC 530, 2023 NEC) exam in one place: the bulletin's key facts, the topics and how many questions each carries, the reference books, sample questions with answers, and a prep checklist. Pearson VUE gives the exam.

South Dakota Electrical Contractor (ICC 530, 2023 NEC) Exam Facts

From the official bulletin:

Questions 100 questions
Time limit 5 hours
Passing score a minimum score of 70
Books in the exam room Open book
Exam fee $115

On exam day

  • Questions are four-option multiple choice with one correct answer.
  • In addition to the NEC, candidates may use Ferm's Fast Finder Index, Ugly's Electrical Reference (any edition), the NFPA National Electrical Code Handbook and Tom Henry's Key Word Index during the exam.

References you may bring

  • NFPA 70: National Electrical Code (2023)
  • Ugly's Electrical References (any edition)
  • Ferm's Fast Finder Index
  • National Electrical Code Handbook
  • Tom Henry's Key Word Index

Scheduling, changes and retakes

  • Examinations are scheduled through PearsonVUE at www.pearsonvue.com/ICC.
  • You must be approved by the South Dakota Electrical Commission before scheduling, and once approved you have 90 days in which to test or you must reapply and pay the $60 fee again.
  • Results for exams taken electronically are available immediately after you finish the exam.
  • A failed exam may be retaken after 30 days, and after a second failure there is a 90-day wait before each later attempt.
  • After passing, contact the jurisdiction for any other requirements needed to become licensed.

Source: South Dakota Contractor/Trades Examination Information Bulletin, PUBLISHED August 19, 2025. Check the bulletin before test day: fees and rules can change.

South Dakota Electrical Contractor (ICC 530, 2023 NEC) Exam Topics

The official content outline has 9 topics:

Topic Questions Share of the exam
General Knowledge and Plan Reading 12 12%
Services and Service Equipment 16 16%
Feeders 4 4%
Branch Circuits and Conductors 16 16%
Wiring Methods and Materials 19 19%
Equipment and Devices 10 10%
Control Devices 3 3%
Motors and Generators 8 8%
Special Occupancies, Equipment and Conditions 12 12%

Services and Service Equipment: Services and Fault Current; Service Load Calculations; Service Equipment & Service Conductors; Transformers; System Grounding and Bonding; Temporary Service Wiring; Overhead and underground service conductor requirements and clearances; Service disconnecting means requirements and ratings.
Wiring Methods and Materials: Raceway Installations; Underground Wiring Methods; Boxes and Enclosures; Cabinets, Panelboards, & Switchboards; Clearance and Guarding; Flexible Cords and Cables; Cable Wiring Methods (NM, MC, AC, MI, SE, UF, TC, ITC, FC, FCC, IGS, Type P); Conductor Fill and Conduit Sizing Calculations.
Special Occupancies, Equipment and Conditions: Special Occupancies; Swimming Pools and Similar Installations; Mobile Home and RV Parks; Data Processing Equipment; Miscellaneous Special Equipment; Emergency Systems; Signaling and Fire Alarm Systems; Hazardous Location Classification (Classes, Divisions, and Zones).

South Dakota Electrical Contractor (ICC 530, 2023 NEC) Exam Prep Checklist

  • Get the reference books the bulletin lists, in the editions it names.
  • Learn each book's table of contents and index first.
  • Highlight the sections you use most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
  • Take our timed practice exams until you pass several in a row.
  • After each attempt, look up every question you missed in your book.
  • Practice at the real exam's pace: about 3 minutes per question.

South Dakota Electrical Contractor (ICC 530, 2023 NEC) Exam Reference Books

The exam table lists NFPA 70: National Electrical Code, 2023 and Ugly's Electrical References (any edition), and page 4 states that in addition to the NEC candidates may also use Ferm's Fast Finder Index (IAEI), the National Electrical Code Handbook (NFPA, hardcover allowed) and Tom Henry's Key Word Index during the exam.

Where to get them:

Test Day Checklist

  • First pass: answer every question you know. Bookmark the rest. Every exam lets you return to bookmarked questions (some lock them once you take a break).
  • Second pass: work through your bookmarks.
  • Pace: 5 hours for 100 questions, which is about 3 minutes per question.
  • Last step: answer anything still blank. A blank can't earn a point.

Study Tips

Be alert to hedging words like likely, may, can, sometimes, usually, generally, and rarely—question writers use them to account for exceptions. An answer choice is often wrong simply because it allows no exceptions. Similarly, avoid choices containing absolute terms like exactly and always.

A little anxiety before an exam is completely normal — acknowledge it instead of fighting it. If you feel yourself spiraling on a question, pause and take a few slow breaths to reset. If your test center allows a short break, use it; just remember the clock usually keeps running.

Every exam you take will be different from the last. New questions, new order, but always based on the exam bulletin in terms of topics, questions and time.

South Dakota Electrical Contractor (ICC 530, 2023 NEC) Sample Questions

From our practice question bank, with answers and references:

Sample 1 — General Knowledge and Plan Reading

Question: When a conductor with a 90°C insulation rating (such as THHN) is terminated on equipment rated for 75°C, which ampacity column must be used to determine the final ampacity of the conductor?

  • A. The average of the 75°C and 90°C column values
  • B. The 60°C column, since residential equipment defaults to that rating
  • C. The 90°C column, since that is the conductor's insulation rating
  • D. The 75°C column, matching the equipment termination temperature rating

Correct Answer: D

Per NEC 110.14(C), the ampacity of a conductor must be selected based on the lowest temperature rating of any connected termination, conductor, or device. When a 90°C conductor is connected to a 75°C terminal, its ampacity is limited to the 75°C column value. However, when applying correction or adjustment factors, the 90°C ampacity may be used as the starting point, provided the final derated value does not exceed the 75°C ampacity.

Reference: NEC 2023 Section 110.14(C)

Sample 2 — Special Occupancies, Equipment and Conditions

Question: What is the maximum overall length permitted for a mobile home power-supply cord?

  • A. 9.0 m (30 ft)
  • B. 10.0 m (33 ft)
  • C. 12.0 m (39 ft)
  • D. 11.0 m (36½ ft)

Correct Answer: D

Per NEC 550.10(D), the overall length of a mobile home power-supply cord, measured from the end of the cord, including bared leads, to the face of the attachment plug cap, shall not exceed 11.0 m (36½ ft). This ensures proper cord management and reduces voltage drop and safety hazards.

Reference: NEC 2023 Section 550.10(D)

Sample 3 — Equipment and Devices

Question: For receptacles installed in wet locations, what type must all 15- and 20-ampere, 125- and 250-volt nonlocking receptacles be?

  • A. GFCI protected only
  • B. Weather-resistant type
  • C. Both GFCI protected and weather-resistant type
  • D. Standard residential grade

Correct Answer: B

According to NEC 406.9(B)(1), all 15- and 20-ampere, 125- and 250-volt nonlocking-type receptacles installed in wet locations shall be a listed weather-resistant type. While GFCI protection may additionally be required by other NEC sections depending on the specific location, 406.9(B)(1) specifically mandates the weather-resistant type requirement for receptacles in wet locations.

Reference: NEC 2023 Section 406.9(B)(1)

Sample 4 — Motors and Generators

Question: When selecting a protective device for a 15 HP, 460V, three-phase motor with a full-load current (FLC) of 21A, which of the following is the correct maximum rating for a time-delay fuse according to NEC guidelines?

  • A. 30A
  • B. 40A
  • C. 50A
  • D. 60A

Correct Answer: B

The maximum rating for a time-delay fuse is 175% of the motor's FLC. For a 21A FLC, 175% is 36.75A, rounded up to the next standard size, which is 40A. NEC, Article 430.52(C), Table 430.52

Reference: NEC 2023 Table 430.52(C)(1)

Online Practice vs. a PDF

  • Timed: you practice finding answers under time pressure, not just reading them.
  • Bookmarks: flag questions and come back, the way you will on test day.
  • New sets: each attempt draws new questions from our bank.
  • Scored by topic: your results show which outline topics need more study.

Next Step

Frequently Asked Questions

How much does the South Dakota Electrical Contractor exam (ICC 530) cost?
The exam fee is $115, paid to Pearson VUE when you schedule your exam.
How many questions are on the South Dakota Electrical Contractor exam and how long do I have?
The exam has 100 multiple-choice questions and a 5-hour time limit. Each question has four answer choices with one correct answer.
Is the South Dakota Electrical Contractor exam (ICC 530) open book?
Yes, it is open book. The exam's listed references are the 2023 NFPA 70: National Electrical Code (NEC) and Ugly's Electrical References (any edition). The bulletin's general FAQ adds that, unless otherwise noted, you may also use Ferm's Fast Finder Index (IAEI), the NFPA National Electrical Code Handbook (hardcover), and Tom Henry's Key Word Index during the exam.
What references can I bring to the South Dakota ICC 530 Electrical Contractor exam?
The exam's listed references are the 2023 NFPA 70: National Electrical Code (NEC) and Ugly's Electrical References (any edition). The bulletin's general FAQ adds that, unless otherwise noted, you may also use Ferm's Fast Finder Index (IAEI), the NFPA National Electrical Code Handbook (hardcover), and Tom Henry's Key Word Index during the exam.
What is the passing score for the South Dakota Electrical Contractor exam (ICC 530)?
The ICC Exam Catalog lists a passing score of 70% for this exam (the South Dakota bulletin itself doesn't print it). Results for an exam taken electronically are available immediately after you finish.
How do I register for the South Dakota Electrical Contractor exam (ICC 530)?
Before scheduling, you must first submit a license application and a $60 application processing fee to the South Dakota Electrical Commission. Once the Commission approves your application and notifies ICC of your eligibility, you can schedule your exam through Pearson VUE. It is recommended to wait 24–48 hours after receiving your approval notice before scheduling, to allow time for your eligibility record to be processed.
How long do I have to take the exam after the South Dakota Electrical Commission approves my application?
Once approved by the Electrical Commission, you have 90 days to take the exam. If you do not test within that timeframe, you must reapply and pay the $60 fee to the Electrical Commission again.
What happens if I fail the South Dakota ICC 530 exam? How soon can I retake it?
After a failed attempt, you must wait 30 days before retaking the exam. After a second failed attempt, you must wait 90 days before each subsequent attempt.
When will I get my results after taking the South Dakota Electrical Contractor exam?
Results are available immediately after you complete the exam at the Pearson VUE test center.
Does passing the ICC 530 exam mean I am licensed as an electrical contractor in South Dakota?
No. ICC is not a licensing agency. Passing the exam demonstrates your competency, but the South Dakota Electrical Commission and any relevant local authority determine licensing requirements and whether they accept this exam result. You should contact the Electrical Commission directly to confirm all requirements for obtaining your license.

Reference books

2 books on the bulletin
As an Amazon Associate we earn from qualifying purchases.

Recommended Supplies

As an Amazon Associate we earn from qualifying purchases.
Took this practice exam? Tell other candidates how it went.
10 free questions30 min · no account
Start Free Exam