Tennessee BC-B, C Combined Commercial/Industrial Contractor Exam Study Guide
This guide covers what you need for the Tennessee BC-B, C Combined Commercial/Industrial Contractor exam: the key facts from the official bulletin, the topics it tests, the reference books, sample questions with answers, and a plan to prepare. Prov gives the exam.
Tennessee BC-B, C Combined Commercial/Industrial Contractor Exam at a Glance
Here are the exam's key facts from the official bulletin:
| Questions | 100 questions |
| Time limit | 5 hours |
| Passing score | a minimum score of 73 |
| Books in the exam room | Open book |
| Exam fee | $53 |
On exam day
- A current, valid, government-issued photo ID is required, and candidates must also sign the log and be photographed.
- Candidates should arrive at least 15 minutes before the scheduled appointment.
- References are inspected before entry, any edition of a listed reference may be used, and books with handwritten notes, moveable tabs, Post-its, photocopies, or test-prep guides are not allowed.
- Highlighting and permanent tabs are allowed; handwritten notes and moveable tabs are not.
- Simple 4-function calculators are permitted and a simple calculator is built into the test.
- Communication devices and other personal items are prohibited in the testing room, while approved references and a simple calculator are allowed.
References you may bring
- International Building Code (2021)
- Study Guide for Commercial Building Contractor (2024)
- OSHA 29 CFR 1926
- Study Guide for Structural Steel (2012)
- Modern Masonry (9th Edition, 2020)
- Pipe and Excavation Contracting (2011)
- Technical Digest No. 9 - Handling and Erection of Steel Joists and Joist Girders (3rd Edition, 2008)
- SDI (Steel Deck Institute) Manual of Construction with Steel Deck (2016)
- Training and Certification of Field Personnel for Unbonded Post-Tensioning - Level 1 Field Fundamentals (3rd ed 2003)
- Erector's Manual: Standards and guidelines for the erection of precast concrete products (1999)
- Placing Reinforcing Bars (2022)
- Design and Control of Concrete Mixtures (2021)
- Carpentry and Building Construction (2016)
- ACI 530 Building Code Requirements and Specification for Masonry Structures 2013
- ACI 318 Building Code Requirements for Structural Concrete 2019
Scheduling, changes and retakes
- Candidates register and schedule online at Prov's website or by calling Prov at 866-720-7768.
- Only the CMC and CMC-A examinations require Board approval before a candidate may schedule.
- Changes or cancellations must be made at least three business days before the test date, and rescheduling by that deadline is free.
- Late arrivals are turned away and forfeit their fees, as do candidates who fail to appear.
- Results are reported immediately by email with a numerical score and pass/fail result, plus a diagnostic report for candidates who fail.
- Failed exams may be retaken an unlimited number of times with no waiting period, at $53 per attempt.
- Passing candidates must submit a license application to the Board, which decides whether they qualify for licensure.
Source: Tennessee Board for Licensing Contractors Candidate Information Bulletin, TNCONT_CIB 2026.08.18. Check the bulletin before test day: fees and rules can change.
What the Tennessee BC-B, C Combined Commercial/Industrial Contractor Exam Covers
The official content outline has 14 topics:
| Topic | Questions | Share of the exam |
|---|---|---|
| Estimating, Plan Reading | 15 | 15% |
| General Code | 12 | 12% |
| Sitework | 6 | 6% |
| Footings and Foundations | 5 | 5% |
| Concrete and Concrete Reinforcement | 16 | 16% |
| Masonry | 10 | 10% |
| Carpentry | 4 | 4% |
| Interior Finish | 2 | 2% |
| Structural Steel | 10 | 10% |
| Roofing, Siding, and Insulation | 6 | 6% |
| Plumbing Concepts | 4 | 4% |
| HVAC Concepts | 2 | 2% |
| Electrical Concepts | 2 | 2% |
| OSHA Safety | 6 | 6% |
How to Prepare for the Tennessee BC-B, C Combined Commercial/Industrial Contractor Exam
Start with the books. This is an open-book exam, so the references on the bulletin's list are your main study tool. Get the editions the bulletin names.
Learn where things are. Read the table of contents and the index of each book until you know where every major subject lives. On test day, finding an answer fast matters more than memorizing it.
Highlight the sections you use most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
Spend most of your time on the biggest topics. Concrete and Concrete Reinforcement and Estimating, Plan Reading make up 31% of the exam.
Take timed practice exams. The clock trains you to find answers at the pace the real exam needs: about 3 minutes per question.
Aim to pass more than once. One passing score can be luck. Several in a row means you're ready.
Reference Books for the Tennessee BC-B, C Combined Commercial/Industrial Contractor Exam
The bulletin lists the Prov references for this exam plus PSI-approved alternate references that may be used through January 1, 2027.
Where to get them:
Alternate references, allowed only through January 1, 2027:
- Modern Masonry
- Pipe and Excavation Contracting
- SJI Technical Digest 9: Steel Joist Erection
- SDI Manual of Construction with Steel Deck
- PTI Unbonded Post-Tensioning Level 1
- PCI Erectors' Manual MNL-127
- ACI 530 Masonry Building Code
- ACI 318 Structural Concrete Building Code
- Placing Reinforcing Bars, Recommended Practices
- Design and Control of Concrete Mixtures
- Carpentry and Building Construction
On Test Day
- Go through the whole exam first. Answer every question you know and bookmark the ones you don't. Every exam lets you come back to bookmarked questions, but some lock the questions you've seen once you take a break, so work your bookmarks before any break.
- Then go back to your bookmarks and work them out.
- Don't let one question eat your time. You have 5 hours for 100 questions, which is about 3 minutes per question.
- Before you finish, answer anything you skipped. A blank can't earn a point.
Study Tips
On an open-book exam, the winners aren't the smartest people in the room — they're the fastest at finding answers. Buy the required book, practice with it open, and tab and highlight each section the first time a question sends you there. Learn the index and table of contents until you can land on any topic in seconds. That speed is what separates a pass from a fail.
On an open-book exam, work through every question once: answer the ones you know and skip the ones you don't. Then go back to the ones you flagged. You can bookmark questions for later review, just like on our exams — and don't sink too much time into any single question. The clock is still running.
Practicing against a ticking clock is the best way to beat exam-clock anxiety. Use these timed tests to build your pacing, so you learn to move steadily and never burn too long on a single question. By test day, the format feels routine.
Skim the answer choices before you commit. You're hunting for the key term or vocabulary word that signals the right concept. The more you've practiced, the faster the right wording jumps out at you.
Sample Tennessee BC-B, C Combined Commercial/Industrial Contractor Practice Questions
These questions come from our practice question bank, each with its answer and reference.
Sample 1 — Structural Steel
Question: A commercial structure uses structural steel acting compositely with reinforced concrete, and the design employs a response modification coefficient, R, from the seismic load standard. The composite system must then be designed and detailed in accordance with which standard?
- A. ACI 318
- B. SJI 100
- C. AISC 360
- D. AISC 341
Correct Answer: D
Per IBC 2021 Section 2206.2.1, where a response modification coefficient, R, in accordance with ASCE 7 Table 12.2-1 is used for the design of systems of structural steel acting compositely with reinforced concrete, the structures must be designed and detailed in accordance with AISC 341. AISC 360 and ACI 318 govern the general (non-seismic) composite design under Section 2206.1.
Reference: IBC 2021 Section 2206.2.1
Sample 2 — Masonry
Question: What is the minimum thickness of fireplace hearths constructed of concrete or masonry?
- A. 3 inches
- B. 2 inches
- C. 4 inches
- D. 6 inches
Correct Answer: C
Per IBC Section 2111.10.1, the minimum thickness of fireplace hearths shall be 4 inches. Hearth extensions have a separate, lesser minimum thickness requirement of 2 inches.
Reference: IBC 2021 Section 2111.10.1
Sample 3 — Sitework
Question: You are the commercial contractor overseeing hot-mix asphalt placement on a parking facility. Your roller crew falls behind the paver and the breakdown roller is reaching the mat late. As a rule of thumb, compaction of the HMA must be completed while the mix temperature remains above what value?
- A. 175°F (79°C)
- B. 250°F (121°C)
- C. 140°F (60°C)
- D. 160°F (71°C)
Correct Answer: A
Per Module 36108-17 Paving, Section 2.1.6 (Compaction), compaction must be achieved while the binder viscosity and mix stiffness are low enough for aggregate particles to reorient under the roller; the stated rule of thumb for achieving proper air-void levels is that the mix should be above 175°F (79°C). The 250°F figure in the text is cited only as an example showing that more density is gained per pass at 250°F (121°C) than at 230°F (110°C) — it is not the minimum compaction temperature.
Reference: Study Guide for Commercial Building Contractor, Module 36108-17 Paving, Section 2.1.6 (Compaction)
Sample 4 — OSHA Safety
Question: You are a residential contractor setting up a supported scaffold on a job site. The scaffold has a height-to-base-width ratio exceeding 4 to 1. For scaffolds 3 feet wide or less, at what maximum vertical interval must guys, ties, or braces be repeated after the initial installation point?
- A. 35 feet
- B. 26 feet
- C. 30 feet
- D. 20 feet
Correct Answer: D
Per 29 CFR 1926.451(c)(1)(ii), guys, ties, and braces shall be repeated vertically at locations of horizontal members every 20 feet or less for scaffolds 3 feet wide or less, and every 26 feet or less for scaffolds greater than 3 feet wide.
Reference: 29 CFR 1926, §1926.451(c)(1)(ii)
Why Practice Online Instead of With a PDF
A PDF shows you questions. It doesn't show you the clock. Our practice exams are timed and on a screen, so you practice finding answers under time pressure, not just reading them. Each attempt draws a new set of questions from our bank, and your results break the score down by outline topic so you know what to study next.
Start Practicing
Take the free Tennessee BC-B, C Combined Commercial/Industrial Contractor practice exam to see where you stand, then work through the topics that need attention. For the official rules, read the exam bulletin, and see the licensing board's website.