ICC F28 Journeyman Plumber with Gas Exam (2015 IPC/IFGC) Practice Exam
Free Practice Exam
Test your knowledge with 10 questions from our pool of 20 free questions.
- 10 questions per attempt
- 30 minute time limit
- Unlimited attempts
- A new mix each time
- Instant results
Full Practice Exam
Complete exam simulation matching the real Pearson VUE test format.
- 70 questions (same as real exam)
- 180 minute time limit
- 9 topic areas covered
- 367 questions in pool
- Detailed explanations
Texts preferred · 9am–9pm Central
ICC F28 Journeyman Plumber with Gas (2015 IPC/IFGC) Practice Exam Guide
What's on the exam
Questions per topic, out of 70This practice exam follows the official content outline for the ICC F28 Journeyman Plumber with Gas (2015 IPC/IFGC) exam: Plumbing Fixtures and Terminology, Plumbing Fundamentals, Traps, Cleanouts, and Interceptors, Special Requirements, Drainage Requirements, Venting Requirements, Water Distribution, Plan Reading, Gas.
You can practice two ways. The free practice exam gives you 10 questions per attempt, and you can retake it whenever you like. The full practice exam gives you 70 questions on a 3 hours clock, with a new draw from our question bank each attempt.
Plumbing Fixtures and Terminology 3 items
Our study plan for this topic: Definitions of plumbing fixtures, fittings, and appurtenances; Minimum number of required plumbing fixtures by occupancy type; Fixture installation requirements (clearances, spacing, and setting); Prohibited fixtures and connections; Fixture material and quality standards; Faucets, fixture fittings, and shower valve requirements; Flushing devices for water closets and urinals; Individual fixture requirements (bathtubs, showers, water closets, urinals, sinks, bidets, and specialty fixtures).
Plumbing Fundamentals 10 items
Our study plan for this topic: Code scope, intent, and applicability (IPC Chapter 1); Permit requirements, application, issuance, expiration, and exempt work; Code official authority, duties, inspections, and right of entry; Violations, stop work orders, penalties, and unsafe plumbing abatement; Board of appeals process and qualifications; Required plumbing system tests (water, air, smoke, gravity sewer, forced sewer, shower liner); Protection of pipes from corrosion, freezing, physical damage, and structural members; Pipe support intervals, hangers, anchorage, and sway bracing by material type.
Traps, Cleanouts, and Interceptors 3 items
Our study plan for this topic: Fixture trap requirements and prohibited trap types; Trap seal depth requirements and seal protection methods; Cleanout placement intervals and location requirements; Cleanout sizing, access clearance, and plug specifications; Grease interceptor requirements, sizing, and capacity; Oil separators and sand interceptors for commercial applications; Venting, access, and maintenance of interceptors and separators; Specialty interceptors for clothes washers, bottling plants, and slaughterhouses.
Special Requirements 2 items
Our study plan for this topic: Nonpotable water storage tank requirements (location, access, venting, overflow, testing); On-site nonpotable water reuse systems (permitted/prohibited sources, collection piping, disinfection, valves); Nonpotable rainwater collection and conveyance systems (collection surface, roof washer, debris excluders, filtration); Reclaimed water system design and distribution piping requirements; Subsurface landscape irrigation system design, sizing, and installation (percolation tests, seepage trenches, absorption area); Indirect waste piping requirements (air gap, air break, waste receptors, food-handling equipment); Special wastes — neutralization and treatment of corrosive wastes.
Drainage Requirements 10 items
Our study plan for this topic: Sanitary drainage pipe materials and applicable standards (above-ground, underground, and building sewer); Slope and installation requirements for horizontal drainage piping; Drainage fixture unit values and system sizing tables; Cleanout placement, sizing, access, and clearance requirements; Joints and connections for sanitary drainage piping by material type; Sumps, sewage ejectors, and below-grade subdrain pumping systems; Storm drainage system sizing using rainfall rates, roof drain flow rates, and conductor/leader tables; Secondary (emergency) roof drains, scuppers, and backwater valve requirements.
Venting Requirements 10 items
Our study plan for this topic: Trap seal protection and maximum allowable pressure differential; Vent terminal location and height requirements (roof, wall, and proximity to openings); Frost closure and cold-climate vent sizing requirements; Vent pipe sizing using developed length and drainage fixture units (Table 906.1); Maximum distance of fixture trap from vent (Table 909.1); Venting methods: individual, common, wet, circuit, combination waste-and-vent, and waste stack vent; Air admittance valve installation, location, size, and prohibited applications; Relief vent requirements for stacks exceeding 10 branch intervals and circuit-vented branches.
Water Distribution 8 items
Our study plan for this topic: Water service pipe sizing and separation requirements; Pipe and fitting materials for water service and distribution (approved standards); Fixture supply pipe sizing and minimum flow rates/pressures at outlets; Maximum flow rates and water consumption limits for fixtures and fittings; Backflow prevention devices and cross-connection control; Pressure regulation, water hammer arrestors, and booster systems; Valve placement requirements (full-open and shutoff valves); Water heater safety devices, relief valves, and discharge piping requirements.
Plan Reading 10 items
Our study plan for this topic: Interpreting drainage fixture unit (DFU) values and pipe sizing tables for sanitary drainage systems; Reading water distribution system design criteria tables (flow rates, pressures, and fixture supply pipe sizes); Identifying pipe slope requirements for horizontal drainage piping from plan specifications; Locating and interpreting cleanout placement requirements on drainage plan drawings; Reading vent pipe sizing tables (stack vents, vent stacks, and individual vents) from developed length and fixture unit data; Identifying required valve locations (full-open and shutoff) on water distribution system plans; Interpreting building drain and sewer sizing tables based on slope and fixture unit load; Reading trap-to-vent distance requirements and vent connection configurations from plan layouts.
Gas 14 items
Our study plan for this topic: Gas piping sizing using tables and equations (longest length, branch length, and hybrid pressure methods); Piping materials, fittings, and joining methods (metallic pipe, copper tubing, CSST, polyethylene plastic); Piping installation requirements (prohibited locations, burial depth, underground protection, support, and identification); Pressure testing, inspection, and purging of gas piping systems; Shutoff valves and flow controls (appliance shutoff valves, pressure regulators, excess flow valves); Appliance connections and connector requirements (flexible connectors, maximum length, prohibited locations); Combustion air requirements (indoor air, outdoor air openings, mechanical air supply methods); Venting of gas appliances (vent types, vent connector sizing, chimney requirements, vent termination locations).
Sample 1 — Gas
Question: In a repair garage you are installing a gas-fired appliance that is not listed as flammable vapor ignition resistant and that will not be elevated 8 feet above the floor under the public-garage provisions. The source of ignition shall be elevated not less than how far above the floor?
- A. 30 inches
- B. 18 inches
- C. 12 inches
- D. 24 inches
Correct Answer: B
IFGC 2015, Section 305.3 requires equipment and appliances having an ignition source to be elevated such that the ignition source is not less than 18 inches (457 mm) above the floor in hazardous locations and public, private, repair and parking garages and motor fuel-dispensing facilities. The exception applies only to appliances listed as flammable vapor ignition resistant.
Reference: IFGC 2015 Section 305.3
Sample 2 — Plumbing Fundamentals
Question: Rock is encountered while trenching for a building sewer. The rock must be removed to not less than what distance below the installation level of the bottom of the pipe before the trench is backfilled with tamped sand?
- A. 6 inches
- B. 2 inches
- C. 3 inches
- D. 12 inches
Correct Answer: C
IPC 2015, Section 306.2.2 requires rock encountered in trenching to be removed to not less than 3 inches (76 mm) below the installation level of the bottom of the pipe, with the trench backfilled to the bottom of the pipe using sand tamped in place; the pipe and joints shall not rest on rock at any point.
Reference: IPC 2015 Section 306.2.2
Sample 3 — Drainage Requirements
Question: A commercial laundry discharges waste water at elevated temperatures into the building's sanitary drainage system. The drainage piping material must be rated for the highest temperature of the waste water where that temperature will be greater than:
- A. 120°F
- B. 180°F
- C. 160°F
- D. 140°F
Correct Answer: D
IPC 2015, Section 702.5 requires that where the waste water temperature will be greater than 140°F (60°C), the sanitary drainage piping material shall be rated for the highest temperature of the waste water.
Reference: IPC 2015 Section 702.5
Your first attempt tells you where you're starting from. After every attempt, the results page shows your score for each outline topic, so you can see what to study next. Compare your score with the real exam's passing score, a minimum score of 70, and keep going until you pass consistently.
- Answer the questions you know first, and bookmark the rest. Our practice exams let you bookmark and come back.
- Return to your bookmarks on the second pass.
- Keep a steady pace. The real exam works out to about 2 minutes 34 seconds per question.
- After each attempt, look up each missed question's reference and read the section.
| Questions | 70 questions |
| Time limit | 3 hours |
| Passing score | a minimum score of 70 |
| Books in the exam room | Open book |
| Exam fee | $120 |
- Results for examinations taken electronically are available immediately after the examination is completed.
- You must wait 10 days before retaking a failed exam.
Source: National Contractor/Trades Examination Information Bulletin, PUBLISHED June 30, 2026. Check the bulletin before test day: fees and rules can change.