North Carolina · PSI

North Carolina Electrical Contractor - Electric Sign (SP-ES) Practice Exam

40 questions 180 minutes 70% to pass 8 topics 4:30 per question Open book 230 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$9.95

Complete exam simulation matching the real PSI test format.

  • 40 questions (same as real exam)
  • 180 minute time limit
  • 8 topic areas covered
  • 230 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 8 topic quizzes and this full exam. $59.95/month.
See the study course

North Carolina Electrical Contractor - Electric Sign (SP-ES) Practice Exam Guide

Built from the official PSI exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 40
Wiring Methods and Terminations8
General7
Laws, Rules, Basic Business Practices, and Practical Applications7
Bonding and Grounding5
Overcurrent Protection4
Appliances, Equipment, and Lighting4
Load Calculations3
Boxes and Fittings2

This practice exam follows the official content outline for the North Carolina Electrical Contractor - Electric Sign (SP-ES) exam: Bonding and Grounding, Overcurrent Protection, Wiring Methods and Terminations, Boxes and Fittings, Load Calculations, Appliances, Equipment, and Lighting, General, Laws, Rules, Basic Business Practices, and Practical Applications.

  • Free practice exam: 10 questions per attempt, retake as often as you like.
  • Full practice exam: 40 questions on a 3 hours clock, a new draw from our bank every attempt.

8 topics

Bonding and Grounding 5 items

The outline lists: Systems and equipment requiring grounding and ground-fault protection; Location of connection and required interconnections; Grounded, grounding, and grounding electrode conductors; Conductor identification and color coding; Bonding jumpers; Equipment grounding conductors; Methods of grounding and bonding, equipment and conductor specifications; Low-voltage specifications.

Overcurrent Protection 4 items

The outline lists: Location in circuit; Sizing requirements; Circuit breakers; Plug and cartridge fuses; Enclosures and locations.

Wiring Methods and Terminations 8 items

The outline lists: Permitted applications and usages; Conduit and wireway fill; Permitted applications and usages; Characteristics; Protection from damage; Permitted usages and ampacity ratings; Characteristics; Outdoors.

Boxes and Fittings 2 items

The outline lists: General information; Sizing requirements.

Load Calculations 3 items

The outline lists: Conductor ampacity requirements; Overcurrent protective device sizing.

Appliances, Equipment, and Lighting 4 items

Our study plan for this topic: Transformers.

General 7 items

The outline lists: Definitions; Installation requirements.

Laws, Rules, Basic Business Practices, and Practical Applications 7 items

The outline lists: Electrical Contractors Licensing Law (General Statutes Chapter 87, Article 4); Board’s Rules for the Implementation of the Electrical Contractors Licensing Law (Title 21, North Carolina Administrative Code, Chapter 18B); NASCLA Contractors’ Guide to Business, Law and Project Management -North Carolina Electrical Edition.

3 questions

Sample 1 — Wiring Methods and Terminations

Question: What is the ampacity rating basis for Type UF cable?

  • A. 75°C (167°F) conductors
  • B. 90°C (194°F) conductors
  • C. 60°C (140°F) conductors
  • D. 105°C (221°F) conductors

Correct Answer: C

Per NEC 340.80, the ampacity of Type UF cable shall be that of 60°C (140°F) conductors in accordance with 310.14.

Reference: NEC 2020 Section 340.80

Sample 2 — General

Question: What is the definition of 'ampacity' as it applies to electrical conductors?

  • A. The maximum voltage a conductor can withstand without insulation breakdown
  • B. The maximum current, in amperes, that a conductor can carry continuously under the conditions of use without exceeding its temperature rating
  • C. The total resistance of a conductor measured in ohms per thousand feet
  • D. The minimum current required to trip the overcurrent protection device for that conductor

Correct Answer: B

Per NEC Article 100, 'Ampacity' is defined as the maximum current, in amperes, that a conductor can carry continuously under the conditions of use without exceeding its temperature rating. This is a fundamental definition used throughout the Code for conductor sizing.

Reference: NEC 2020 Article 100 (Definitions)

Sample 3 — Laws, Rules, Basic Business Practices, and Practical Applications

Question: You are the only member of your newly formed electrical contracting limited liability company and make no special tax election. For tax purposes, how is that LLC treated?

  • A. As a C corporation
  • B. As a sole proprietorship
  • C. At the entity level as an LLC
  • D. As a partnership

Correct Answer: B

Per the NASCLA Contractors' Guide (Chapter 2, Limited Liability Company), LLCs are not taxed at an entity level. An LLC with one owner is taxed as a sole proprietorship; an LLC with more than one owner may elect to be taxed as a partnership or as a corporate entity.

Reference: NASCLA Contractors Guide, North Carolina Electrical (14th ed.), Chapter 2 — Limited Liability Company (LLC) section

  • Your results break the score down by outline topic.
  • The real exam's passing score: 70% correct.
  • Keep practicing until you pass consistently, not just once.

  • Answer what you know first and bookmark the rest. Our practice exams let you bookmark and come back.
  • Work your bookmarks on the second pass.
  • Real exam pace: about 4 minutes 30 seconds per question.
  • After each attempt, look up every miss in your book.

Questions 40 questions
Time limit 3 hours
Passing score 70% correct
Books in the exam room Open book
Exam fee $125
  • Results are given immediately at the test center, with a diagnostic report of strengths and weaknesses for candidates who do not pass.
  • A candidate who fails must wait 3 months before retaking the same classification and must re-apply to the Board for each attempt.

Source: NCBEEC Examination Information Handbook (North Carolina Board of Examiners of Electrical Contractors), July 2026. Check the bulletin before test day: fees and rules can change.

Reference books

2 books on the bulletin
As an Amazon Associate we earn from qualifying purchases.
10 free questions30 min · no account