North Carolina · PSI

North Carolina Electrical Contractor - Ground Water Pump (SP-WP) Practice Exam

40 questions 180 minutes 70% to pass 8 topics 4:30 per question Open book 209 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$9.95

Complete exam simulation matching the real PSI test format.

  • 40 questions (same as real exam)
  • 180 minute time limit
  • 8 topic areas covered
  • 209 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 8 topic quizzes and this full exam. $59.95/month.
See the study course

North Carolina Electrical Contractor - Ground Water Pump (SP-WP) Practice Exam Guide

Built from the official PSI exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 40
Wiring Methods and Terminations9
Laws, Rules, Basic Business Practices, and Practical Applications8
Bonding and Grounding7
Motors and Control Wiring5
Overcurrent Protection3
Boxes and Fittings3
Load Calculations3
General2

This practice exam follows the official content outline for the North Carolina Electrical Contractor - Ground Water Pump (SP-WP) exam: Bonding and Grounding, Overcurrent Protection, Wiring Methods and Terminations, Boxes and Fittings, Motors and Control Wiring, Load Calculations, General, Laws, Rules, Basic Business Practices, and Practical Applications.

You can practice two ways. The free practice exam gives you 10 questions per attempt, and you can retake it whenever you like. The full practice exam gives you 40 questions on a 3 hours clock, with a new draw from our question bank each attempt.

8 topics

Bonding and Grounding 7 items

The outline lists: Systems and equipment requiring grounding and ground-fault protection; Location of connection and required interconnections; Grounded, grounding, and grounding electrode conductors; Conductor identification and color coding; Bonding jumpers; Equipment grounding conductors; Methods of grounding and bonding, equipment and conductor specifications; Bonding conductor connections.

Overcurrent Protection 3 items

The outline lists: Location in circuit; Sizing requirements; Circuit breakers; Plug and cartridge fuses.

Wiring Methods and Terminations 9 items

Our study plan for this topic: Permitted applications and usages; Characteristics; Permitted applications and usages; Characteristics; Protection from damage; Permitted usages and ampacity ratings; Characteristics; Miscellaneous.

Boxes and Fittings 3 items

The outline lists: General information; Sizing requirements.

Motors and Control Wiring 5 items

The outline lists: General information; Branch circuit and feeder ampacity; Overload protection; Short-circuit and ground-fault protection; Disconnects/controllers; Type; Location; Separation of conductors.

Load Calculations 3 items

The outline lists: Branch circuits; Total computed load; Conductor ampacity requirements; Overcurrent protective device sizing; Low-voltage.

General 2 items

The outline lists: Definitions; Installation requirements.

Laws, Rules, Basic Business Practices, and Practical Applications 8 items

The outline lists: Electrical Contractors Licensing Law (General Statutes Chapter 87, Article 4); Board’s Rules for the Implementation of the Electrical Contractors Licensing Law (Title 21, North Carolina Administrative Code, Chapter 18B); NASCLA Contractors’ Guide to Business, Law and Project Management -North Carolina Electrical Edition.

3 questions

Sample 1 — Wiring Methods and Terminations

Question: You are installing a conduit run on a rooftop for a commercial HVAC system. The conduit is mounted directly on the roof surface with less than 23 mm (7/8 in.) clearance above the roof. The outdoor temperature is 40°C (104°F). What ambient temperature must you use to apply correction factors from the ampacity tables?

  • A. 40°C (104°F)
  • B. 53°C (127°F)
  • C. 63°C (145°F)
  • D. 73°C (164°F)

Correct Answer: D

Per NEC 310.15(B)(2), for raceways or cables exposed to direct sunlight on or above rooftops where the distance above the roof is less than 23 mm (7/8 in.), a temperature adder of 33°C (60°F) shall be added to the outdoor temperature. 40°C + 33°C = 73°C (104°F + 60°F = 164°F).

Reference: NEC 2020 Section 310.15(B)(2)

Sample 2 — Laws, Rules, Basic Business Practices, and Practical Applications

Question: A project manager in your firm wants to sit for the Intermediate classification qualifying examination. Under the Board's examination requirements, what is the minimum experience he must document?

  • A. Six years, of which four years are primary
  • B. Seven years, of which five years are primary
  • C. Four years, of which two years are primary
  • D. Five years, of which three years are primary

Correct Answer: A

Per 21 NCAC 18B .0201(d)(2), an applicant for the Intermediate classification must have at least six years of experience, of which at least four years shall be primary experience; the balance may be primary, secondary, or both. Four years with two primary is the Limited/SP-SFD requirement, and seven years with five primary is the Unlimited requirement.

Reference: NASCLA Contractors Guide, North Carolina Electrical (14th ed.), Appendix F — 21 NCAC 18B .0201 Requirements for All Examination Applicants

Sample 3 — Bonding and Grounding

Question: Which of the following materials is NOT permitted for use as a grounding electrode?

  • A. Metal underground water pipe in direct contact with the earth for 10 feet or more
  • B. Aluminum
  • C. Concrete-encased reinforcing bar
  • D. A ground ring of bare copper conductor

Correct Answer: B

Per NEC 250.52(B)(2), aluminum is explicitly listed as a material not permitted for use as a grounding electrode.

Reference: NEC 2020 Section 250.52(B)

Your first attempt tells you where you're starting from. After every attempt, the results page shows your score for each outline topic, so you can see what to study next. Compare your score with the real exam's passing score, 70% correct, and keep going until you pass consistently.

  • Answer the questions you know first, and bookmark the rest. Our practice exams let you bookmark and come back.
  • Return to your bookmarks on the second pass.
  • Keep a steady pace. The real exam works out to about 4 minutes 30 seconds per question.
  • After each attempt, look up each missed question's reference and read the section.

Questions 40 questions
Time limit 3 hours
Passing score 70% correct
Books in the exam room Open book
Exam fee $125
  • Results are given immediately at the test center, with a diagnostic report of strengths and weaknesses for candidates who do not pass.
  • A candidate who fails must wait 3 months before retaking the same classification and must re-apply to the Board for each attempt.

Source: NCBEEC Examination Information Handbook (North Carolina Board of Examiners of Electrical Contractors), July 2026. Check the bulletin before test day: fees and rules can change.

Reference books

2 books on the bulletin
As an Amazon Associate we earn from qualifying purchases.
10 free questions30 min · no account