North Carolina · PSI

North Carolina Electrical Contractor - Single-Family Detached Residential Dwelling (SP-SFD) Practice Exam

40 questions 180 minutes 70% to pass 11 topics 4:30 per question Open book 193 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$9.95

Complete exam simulation matching the real PSI test format.

  • 40 questions (same as real exam)
  • 180 minute time limit
  • 11 topic areas covered
  • 193 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 11 topic quizzes and this full exam. $59.95/month.
See the study course

North Carolina Electrical Contractor - Single-Family Detached Residential Dwelling (SP-SFD) Practice Exam Guide

Built from the official PSI exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 40
Laws, Rules, Basic Business Practices, and Practical Applications8
Bonding and Grounding5
Overcurrent Protection4
Boxes and Fittings4
Service Entrance and Equipment4
Load Calculations4
Wiring Methods and Terminations3
Appliances, Equipment, and Lighting3
Motors and Control Wiring2
General2
Special Occupancies and Hazardous Locations1

This practice exam follows the official content outline for the North Carolina Electrical Contractor - Single-Family Detached Residential Dwelling (SP-SFD) exam: Bonding and Grounding, Overcurrent Protection, Wiring Methods and Terminations, Boxes and Fittings, Service Entrance and Equipment, Motors and Control Wiring, Special Occupancies and Hazardous Locations, Load Calculations, Appliances, Equipment, and Lighting, General, Laws, Rules, Basic Business Practices, and Practical Applications.

You can practice two ways. The free practice exam gives you 10 questions per attempt, and you can retake it whenever you like. The full practice exam gives you 40 questions on a 3 hours clock, with a new draw from our question bank each attempt.

11 topics

Bonding and Grounding 5 items

The outline lists: Systems and equipment requiring grounding and ground-fault protection; Location of connection and required interconnections; Conductor identification and color coding; Bonding jumpers; Grounding electrode conductors; Equipment grounding conductors; Grounding electrodes; Low-voltage specifications.

Overcurrent Protection 4 items

The outline lists: Location in circuit; Sizing requirements; Circuit breakers; Plug and cartridge fuses; Enclosures and locations.

Wiring Methods and Terminations 3 items

The outline lists: Permitted applications and usages; Characteristics; Conduit and wireway fill; Permitted applications and usages; Characteristics; Protection from damage; Permitted usages and ampacity ratings; Characteristics.

Boxes and Fittings 4 items

The outline lists: General information; Sizing requirements.

Service Entrance and Equipment 4 items

The outline lists: Installation requirements; Service equipment; General sizing requirements.

Motors and Control Wiring 2 items

The outline lists: General information; Branch circuit and feeder ampacity; Overload protection; Short-circuit and ground-fault protection; Disconnects/controllers; Size; Type; Location.

Special Occupancies and Hazardous Locations 1 item

The outline lists: Mobile homes and mobile home parks; Swimming pools; Underwater lighting fixtures.

Load Calculations 4 items

The outline lists: Branch circuits; Total computed load; Conductor ampacity requirements; Low-voltage.

Appliances, Equipment, and Lighting 3 items

The outline lists: Air conditioners; Residential, commercial, and industrial equipment; Lighting fixtures; Space heating equipment and boilers; Transformers.

General 2 items

The outline lists: Definitions; Installation requirements.

Laws, Rules, Basic Business Practices, and Practical Applications 8 items

The outline lists: Electrical Contractors Licensing Law (General Statutes Chapter 87, Article 4); Board’s Rules for the Implementation of the Electrical Contractors Licensing Law (Title 21, North Carolina Administrative Code, Chapter 18B); NASCLA Contractors’ Guide to Business, Law and Project Management - North Carolina Electrical Edition; National Fire Alarm Code.

3 questions

Sample 1 — Laws, Rules, Basic Business Practices, and Practical Applications

Question: You applied and paid the examination application fee, passed the Single-Family Detached Dwelling (SP-SFD) examination, and the Board has reviewed your score. What non-refundable license fee must you now pay for this special restricted classification?

  • A. $150.00
  • B. $200.00
  • C. $100.00
  • D. $90.00

Correct Answer: C

Per the NASCLA Contractors' Guide (NC Electrical Edition), Chapter 3, Licensing Application: the non-refundable license fees are Limited $100, Intermediate $150, Unlimited $200, and All Special Restricted (which includes SP-SFD) $100. The $90 figure is the Application for Examination fee, not the license fee.

Reference: NASCLA Contractors' Guide to Business, Law and Project Management - North Carolina Electrical Edition, Chapter 3 — Licensing Application section

Sample 2 — Bonding and Grounding

Question: An insulated grounded conductor of 6 AWG or smaller shall be identified by which of the following means?

  • A. A continuous white or gray outer finish
  • B. A continuous red outer finish
  • C. A continuous green outer finish
  • D. A continuous blue outer finish

Correct Answer: A

Per NEC 200.6(A), an insulated grounded conductor of 6 AWG or smaller shall be identified by a continuous white outer finish, a continuous gray outer finish, or three continuous white or gray stripes on other than green insulation, among other methods.

Reference: NEC 2020 Section 200.6(A)

Sample 3 — Overcurrent Protection

Question: You are a master electrician installing a new 1,400-ampere circuit breaker for a main distribution panel. The building engineer asks you what additional requirements apply since the breaker is rated above a certain amperage threshold. According to the NEC, which of the following arc energy reduction methods would NOT be an acceptable option for this installation?

  • A. Temporary adjustment of the instantaneous trip setting during maintenance
  • B. An instantaneous trip setting that is permanently set
  • C. Energy-reducing maintenance switching with local status indicator
  • D. Zone-selective interlocking

Correct Answer: A

Per NEC 240.87, arc energy reduction requirements apply where the highest continuous current trip setting for which the actual overcurrent device installed in a circuit breaker is rated or can be adjusted is 1,200 A or higher. NEC 240.87(B) lists acceptable methods to reduce clearing time, including (1) zone-selective interlocking, (3) energy-reducing maintenance switching with local status indicator, and (5) an instantaneous trip setting. However, 240.87(B)(5) explicitly states: 'Temporary adjustment of the instantaneous trip setting to achieve arc energy reduction shall not be permitted.' Therefore, temporary adjustment of the instantaneous trip setting is NOT an acceptable method. The 1,400 A breaker in this scenario exceeds the 1,200 A threshold, so 240.87 applies.

Reference: NEC 2020 Section 240.87(B)

Your first attempt tells you where you're starting from. After every attempt, the results page shows your score for each outline topic, so you can see what to study next. Compare your score with the real exam's passing score, 70% correct, and keep going until you pass consistently.

  • Answer the questions you know first, and bookmark the rest. Our practice exams let you bookmark and come back.
  • Return to your bookmarks on the second pass.
  • Keep a steady pace. The real exam works out to about 4 minutes 30 seconds per question.
  • After each attempt, look up each missed question's reference and read the section.

Questions 40 questions
Time limit 3 hours
Passing score 70% correct
Books in the exam room Open book
Exam fee $125
  • Results are given immediately at the test center, with a diagnostic report of strengths and weaknesses for candidates who do not pass.
  • A candidate who fails must wait 3 months before retaking the same classification and must re-apply to the Board for each attempt.

Source: NCBEEC Examination Information Handbook (North Carolina Board of Examiners of Electrical Contractors), July 2026. Check the bulletin before test day: fees and rules can change.

Reference books

3 books on the bulletin
As an Amazon Associate we earn from qualifying purchases.
10 free questions30 min · no account