South Carolina · PSI

South Carolina - Packaged Equipment Practice Exam

80 questions 240 minutes 70% to pass 40 topics 3:00 per question Open book 569 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$9.95

Complete exam simulation matching the real PSI test format.

  • 80 questions (same as real exam)
  • 240 minute time limit
  • 40 topic areas covered
  • 569 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 40 topic quizzes and this full exam, plus the Business Management and Law exam. $59.95/month.
See the study course

South Carolina - Packaged Equipment Practice Exam Guide

Built from the official PSI exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 80
Load Calculations8
Air Conditioning Systems6
Heat Pumps5
Duct System Components5
General Duct Systems Knowledge and Principles4
Duct Conversion/Equivalencies4
Chimneys, Flues, Vents, and Vent Connectors3
Metal Ducts3
Piping Systems2
Heating and Cooling Principles2
Testing, Adjusting, and Balancing (TAB)2
Furnaces (Warm Air Heating Equipment)2
Combustion Air2
Mechanical Sheet Metal Devices/Systems2
Ventilation Equipment and Devices2
Exhaust Systems2
General Electrical Knowledge2
Safety2
General Piping1
General Tubing1
Pipe Assembly1
Drain Piping1
Valves1
Piping Insulation1
Hangers and Supports (General)1
Mechanical Sound, Vibration, and Seismic Control1
Refrigerants1
Heating and Cooling Equipment1
HVACR Control Fundamentals1
Control Schematics and Wiring Diagrams1
HVACR Control Systems1
Machine Room1
General Fuel Knowledge1
Natural Gas1
Fiberglass Ducts1
Filtering Systems1
Requirements for Electrical Installations1
Electrical/Electronic Fundamentals1
Fire Rated Construction1
General Plan Reading1

This practice exam follows the official content outline for the South Carolina - Packaged Equipment exam: General Piping, General Tubing, Pipe Assembly, Piping Systems, Drain Piping, Valves, Piping Insulation, Hangers and Supports (General), Mechanical Sound, Vibration, and Seismic Control, Heating and Cooling Principles, Refrigerants, Load Calculations, Heating and Cooling Equipment, Testing, Adjusting, and Balancing (TAB), HVACR Control Fundamentals, Control Schematics and Wiring Diagrams, HVACR Control Systems, Machine Room, Air Conditioning Systems, Heat Pumps, Furnaces (Warm Air Heating Equipment), Chimneys, Flues, Vents, and Vent Connectors, Combustion Air, General Fuel Knowledge, Natural Gas, General Duct Systems Knowledge and Principles, Duct Conversion/Equivalencies, Mechanical Sheet Metal Devices/Systems, Duct System Components, Metal Ducts, Fiberglass Ducts, Filtering Systems, Ventilation Equipment and Devices, Exhaust Systems, General Electrical Knowledge, Requirements for Electrical Installations, Electrical/Electronic Fundamentals, Safety, Fire Rated Construction, General Plan Reading.

You have two ways to practice. The free practice exam gives you 10 questions per attempt, and you can retake it as often as you like. The full practice exam gives you 80 questions on a 4 hours clock, with a new draw from our question bank every attempt.

40 topics

General Piping 1 item

Our study plan for this topic: Pipe and tubing material selection (steel, copper, plastic, CSST) and applicable standards; Gas piping sizing methods and pressure drop calculations; Pipe joining methods (threaded, brazed, soldered, welded, flared, solvent-cemented); Pipe bending calculations (setback, length of arc, offset bends); Pipe and tubing support spacing requirements; Hydronic piping system installation requirements and valve placement; Pressure testing and purging of piping systems; Pipe fittings dimensions and laying lengths (elbows, tees, reducers, flanges).

General Tubing 1 item

Our study plan for this topic: ACR copper tubing types and sizing (soft vs. hard-drawn, Type K and L, nominal vs. actual OD); Cutting tubing methods and tools (tubing cutter, hacksaw, reaming and deburring); Bending tubing techniques (bending springs, lever-type benders, minimum bend radius); Flared connections (single and double flares, flaring tools, flare fittings and nuts); Soldering and brazing connections (flux application, filler metals, flame types, purging with nitrogen); Swaged connections and specialized tube couplings (swaging tools, dissimilar metal joints); Non-refrigerant piping materials (copper water tubing, plastic pipe types ABS/PVC/CPVC, steel pipe and fittings); Pipe bending calculations (setback, length of bend, offset bends, minimum bending radius for standard pipe).

Pipe Assembly 1 item

Our study plan for this topic: Pipe and tubing material selection (steel, copper, plastic, CSST) by application; Joining methods: threaded, brazed, soldered, solvent-cemented, and mechanical connections; Pipe bending calculations: setback, arc length, and offset geometry; Pipe sizing and gas capacity using code tables and pressure-drop equations; Fitting dimensions and laying lengths for screwed, flanged, and butt-weld fittings; Pipe support spacing and hanger requirements; Pressure testing and purging of assembled piping systems; Hydronic piping joints, valves, and installation requirements per SC Mechanical Code.

Piping Systems 2 items

Our study plan for this topic: Pipe and tubing materials selection (copper, steel, plastic, CSST); Gas piping sizing methods and tables; Pipe joining methods (brazing, soldering, threading, solvent cementing, flared connections); Pipe bending techniques and calculations (setback, bend length, offset bends); Hydronic piping system design and components (boilers, pumps, expansion tanks, valves); Fuel oil piping installation requirements and materials; Pipe support spacing and hangers; Refrigerant piping components (filter-driers, receivers, sight glasses, flow valves).

Drain Piping 1 item

Our study plan for this topic: DWV copper drainage tube dimensions and applications; Plastic pipe materials for drainage applications (ABS, PVC, butyrate); Pipe slope and drainage requirements for underground installations; Pipe support spacing for drainage piping; Offset calculations and routing for drain piping installations; Pipe fitting dimensions and laying lengths for drain system connections; Full Text.

Valves 1 item

Our study plan for this topic: Refrigerant service valve types, positions, and operation (back-seated, front-seated, mid-position, cracked open); Check valves: function, types, and applications in refrigeration and heat pump systems; Solenoid valves: normally open vs. normally closed, two-way and three-way configurations; Metering devices as valves: TXV operation and adjustment, AXV, EEV, capillary tubes, and fixed-orifice types; Pressure-regulating valves: crankcase pressure regulators (CPRs), evaporator pressure regulators (EPRs), and relief valves; Reversing valves in heat pump systems: direct-acting and pilot-operated types, heating vs. cooling mode operation; Hydronic system valves: mixing valves, balancing valves, pressure-reducing valves, flow-control valves, and backflow preventers; Valve material compatibility and pressure/temperature ratings per SC Mechanical Code hydronic piping requirements.

Piping Insulation 1 item

Our study plan for this topic: Insulation characteristics and fire safety ratings (flame spread and smoke-developed index limits); Required insulation thickness per energy code compliance; Pipe insulation requirements for radiant floor heating systems (thermal break and R-value marking); Insulation requirements for embedded hydronic piping; Condensation prevention on exterior of piping; Pipe support spacing allowances for insulated versus uninsulated lines; Clearance to combustibles for high-temperature hydronic piping; Full Text.

Hangers and Supports (General) 1 item

Our study plan for this topic: Pipe support spacing intervals by material type; Hanger and anchor attachment to building structure; Materials compatibility for pipe hangers and supports; U-bolt dimensions for pipe hangers; Support spacing for plastic pipe (PVC, ABS, polyethylene); Shield plate protection for piping in notched or bored framing members; Support spacing for copper and steel pipe; Structural strength requirements for hangers under static and dynamic loading.

Mechanical Sound, Vibration, and Seismic Control 1 item

Our study plan for this topic: Vibration isolation methods for mechanical equipment and ductwork; Noise sources in HVAC systems (blower, duct turbulence, air distribution components); Noise control through duct design and air velocity limits; Noise Criteria (NC) values for occupied spaces; Sound attenuation techniques (duct lining, lined elbows, sound traps); Crosstalk prevention through duct geometry; Seismic resistance requirements for mechanical system supports and anchorage; Supplemental restraint requirements when vibration isolation is employed.

Heating and Cooling Principles 2 items

Our study plan for this topic: Heat transfer methods: conduction, convection, and radiation; Sensible heat vs. latent heat in heating and cooling applications; Thermal resistance properties: K-value, C-value, R-value, and U-value; Indoor and outdoor design temperatures for load calculations; Heat loss and heat gain sources in building envelopes; Compression refrigeration cycle: evaporation, compression, condensing, and metering; Heat pump operating principles: heating mode and cooling mode; Psychrometric properties of air: dry-bulb temperature, wet-bulb temperature, relative humidity, and dew point.

Refrigerants 1 item

Our study plan for this topic: Refrigerant classification types (CFC, HCFC, HFC, HFO, HC) and their chemical compositions; Environmental impact: ozone depletion potential (ODP) and global warming potential (GWP); EPA Clean Air Act Section 608 requirements and technician certification types; Refrigerant numbering system, cylinder color codes, and ASHRAE safety classifications (toxicity and flammability); Pressure-temperature charts, pressure-enthalpy tables, and diagrams for system diagnostics; Refrigerant recovery, recycling, and reclaiming procedures and equipment; Refrigerant lubricant types (MO, POE, AB, PAG) and compatibility with refrigerants; SC Mechanical Code refrigerant classification groups, allowable quantities, and machinery room requirements.

Load Calculations 8 items

Our study plan for this topic: Heating and cooling design temperature differences (HTD and CTD); Fenestration heating and cooling HTM calculations (windows, glass doors, skylights); Opaque panel heating and cooling loads (walls, ceilings, floors, doors); Infiltration load estimation methods (ACH method, component leakage area, blower door); Duct load factors (conduction, leakage, insulation R-value, surface area adjustments); Internal loads (occupants, appliances, lighting); Engineered ventilation sensible and latent loads; Outdoor and indoor design conditions (Table 1 values, grains difference, daily range, latitude).

Heating and Cooling Equipment 1 item

Our study plan for this topic: Gas-fired furnace combustion principles and efficiency (AFUE, combustion air, flue gas analysis); Gas furnace components: burners, gas valves, ignition systems, and safety controls; Oil-fired heating system components, combustion testing, and fuel oil characteristics; Electric resistance heating systems: elements, furnaces, duct heaters, and controls; Hydronic heating systems: boilers, circulating pumps, expansion tanks, and terminal units; Heat pump operation, types (air-source and ground-source), efficiency ratings, and reversing valve function; Residential and commercial central air-conditioning systems: split, packaged, and rooftop units; Heating and cooling load calculations: heat transfer values, Manual J method, and design temperatures.

Testing, Adjusting, and Balancing (TAB) 2 items

Our study plan for this topic: Air-side balancing procedures and damper adjustment; Airflow measurement instruments and techniques (flow hoods, anemometers, pitot tubes, manometers); Duct leakage testing methods (blower door subtraction, duct blaster/pressurization); Blower performance curves and system operating point determination; Building envelope airtightness testing and ACH50 calculation; Supply and return CFM measurement and verification; Duct system noise diagnosis and correction; Air filter inspection, pressure drop measurement, and service.

HVACR Control Fundamentals 1 item

Our study plan for this topic: Thermostat types and sensing elements (bimetal, thermistor, mercury switch, hydraulic); Heat and cooling anticipators (operation, adjustment, and purpose); Line-voltage, low-voltage, and millivolt thermostat operation and wiring; Programmable, wireless, and smart thermostat features and programming; Control system fundamentals (set point, differential, range, cut-in/cut-out adjustment); Pressure motor controls (high-pressure, low-pressure, oil pressure safety controls); Motor starting relays (current, potential, solid-state, PTC); Electrical test instruments (voltmeter, ohmmeter, ammeter, multimeter usage and procedures).

Control Schematics and Wiring Diagrams 1 item

Our study plan for this topic: Pictorial diagrams vs. ladder diagrams; Control system fundamentals: cut-in, cut-out, range, and differential adjustment; Temperature motor controls and sensing devices (sensing bulbs, bimetal devices, electronic sensors); Pressure motor controls (high-pressure, low-pressure, oil pressure, and safety controls); Motor starting relays (current, potential, solid-state, and PTC relays); Motor protection devices (fuses, circuit breakers, bimetal protection, thermistor-based protection); Electrical test instruments for diagnosing control circuits (voltmeter, ohmmeter, ammeter, multimeter); Troubleshooting and servicing motor control components (thermostats, relays, contactors).

HVACR Control Systems 1 item

Our study plan for this topic: Thermostat types and operating principles (line-voltage, low-voltage, millivolt); Heat and cooling anticipators; Thermostat wiring terminals and diagrams; Programmable and digital thermostat operation and programming; Pressure motor controls (high-pressure, low-pressure, oil pressure safety controls); Motor starting relays (current, potential, solid-state, PTC); Compressor protection devices (thermal overloads, discharge line pressure switches, crankcase pressure regulators); Heat pump control systems (reversing valve control, defrost controls, auxiliary heat).

Machine Room 1 item

Our study plan for this topic: Machinery room construction and design requirements; Mandatory mechanical ventilation requirements (normal and emergency conditions); Refrigerant detector requirements and emergency ventilation activation; Means of egress requirements for machinery rooms; Fuel-burning appliances and open flame restrictions in machinery rooms; Pressure relief device and emergency pressure control system termination requirements; Special requirements for flammable refrigerant groups (A2, A3, B2, B3) including Class I Division 2 electrical classification; Remote control and emergency shutoff requirements for machinery room equipment.

Air Conditioning Systems 6 items

Our study plan for this topic: Compression refrigeration cycle fundamentals (compressor, condenser, metering device, evaporator); Types of air-conditioning systems (room units, PTACs, ductless split, central split, packaged/rooftop); Residential central air-conditioning installation and service; Commercial rooftop and packaged outdoor unit operation and controls; Heat pump operation, components, and reversing valve function; Metering devices (capillary tube, TXV, EEV, fixed orifice) selection and operation; Heating and cooling load calculations and equipment sizing (Manual J); Refrigerant classification, handling, and SC Mechanical Code requirements.

Heat Pumps 5 items

Our study plan for this topic: Heat pump operating modes (heating vs. cooling) and refrigerant flow direction; Types of heat pumps: air-source vs. ground-source (geothermal); Reversing valve operation and configurations (direct-acting vs. pilot-operated); Heat pump system components: accumulators, compressors, and crankcase heaters; Metering devices for heat pumps: TXVs, biflow valves, and flow check pistons; Defrost controls and methods: reverse cycle defrost and electric heat defrost; Auxiliary heat: balance point, applications, and emergency heat operation; Heat pump efficiency ratings: EER, SEER, HSPF, and COP.

Furnaces (Warm Air Heating Equipment) 2 items

Our study plan for this topic: Gas furnace combustion principles and fuel types (natural gas vs. LP gas); Gas furnace ignition systems (standing-pilot, intermittent-pilot, DSI, and HSI); Gas furnace safety controls (high-limit switch, rollout switch, pressure switch); Gas furnace efficiency ratings and classifications (AFUE, mid-efficiency vs. high-efficiency/condensing); Gas furnace venting categories and vent materials (Category I–IV, PVC, Class B); Oil furnace components and combustion efficiency testing (CO2, stack temperature, draft, smoke tests); Electric heating systems and controls (resistance elements, sequencers, safety cutoffs); SC Mechanical and Fuel Gas Code requirements for forced-air warm-air furnace installation (listing, dampers, return-air restrictions, duct connections).

Chimneys, Flues, Vents, and Vent Connectors 3 items

Our study plan for this topic: Appliance venting categories (Category I, II, III, IV) and matching vent types; Chimney and vent termination height and clearance requirements; Vent connector materials, sizing, slope, and installation requirements; Sizing of Category I appliance venting systems using code tables; Draft hoods, draft controls, and automatically operated vent dampers; Flue lining systems for masonry chimneys; Appliances not required to be vented; Venting system installation for mid-efficiency and high-efficiency gas furnaces (Class B, PVC).

Combustion Air 2 items

Our study plan for this topic: Indoor combustion air volume requirements (standard method and known air-infiltration-rate method); Outdoor combustion air opening methods (two-permanent-openings and one-permanent-opening); Combustion air duct construction and installation requirements; Louvers, grilles, and screens for combustion air openings; Mechanical combustion air supply systems and appliance interlock requirements; Combustion air requirements for oil-fired and solid-fuel appliances (NFPA 31 and manufacturer instructions); Dampered combustion air openings and interlock with appliance firing cycle; Primary air, secondary air, and excess air concepts for gas-fired appliances.

General Fuel Knowledge 1 item

Our study plan for this topic: Properties and characteristics of natural gas vs. LP (liquefied petroleum) gas; Combustion fundamentals: fuel, heat, oxygen, and products of combustion; Flammability limits, air-to-fuel ratios, and excess air; Fuel oil grades, properties, and heating values; Combustion efficiency testing: CO2, O2, CO content, stack temperature, and draft; Gas pressure measurement and units (inches water column, psi); Heating values of fuel gases and fuel oils; Carbon monoxide hazards and incomplete combustion indicators.

Natural Gas 1 item

Our study plan for this topic: Gas piping materials and fittings (steel, copper, CSST, polyethylene); Pipe sizing methods and sizing tables for natural gas systems; Gas supply pressure requirements and allowable pressure drop; Combustion air requirements for gas-fired appliances; Venting systems for gas-fired appliances (Type B, chimney, direct-vent categories); Gas appliance installation requirements and prohibited locations; Pressure testing and leak checking of gas piping systems; Combustion process, flame characteristics, and incomplete combustion hazards.

General Duct Systems Knowledge and Principles 4 items

Our study plan for this topic: Available static pressure calculation and friction rate determination; Total effective length of circulation paths including fitting equivalent lengths; Air velocity limits for supply and return duct systems; Duct system types and configurations (radial, extended plenum, reducing trunk, perimeter loop); Duct materials, construction standards, and sealing requirements; Blower performance data interpretation and operating point selection; Duct leakage effects on system performance and energy efficiency; Balancing dampers: placement, function, and airflow balancing procedures.

Duct Conversion/Equivalencies 4 items

Our study plan for this topic: Round-to-rectangular duct equivalency using equal friction rate tables (Chart 9); Round-to-oval duct equivalency using equal friction rate tables (Chart 10); Friction chart variables and relationships (CFM, friction rate, diameter, velocity); Duct material roughness factors and their effect on equivalent diameter calculations; Mathematical equations for converting round duct to equivalent rectangular or oval shapes; Fitting equivalent length concept and how fittings are expressed as equivalent duct length; Equivalent length adjustments for varying air velocity and friction rate conditions; Duct slide rule use for determining equivalent sizes and verifying velocity limits.

Mechanical Sheet Metal Devices/Systems 2 items

Our study plan for this topic: Duct system types and configurations (radial, extended plenum, reducing trunk, perimeter loop); Sheet metal duct construction materials, gauges, and fabrication methods; Duct joints, seams, and sealing requirements (mastic, tape, fasteners); Fire and smoke damper types, ratings, and installation requirements; Registers, grilles, and diffusers — selection, placement, and performance; Duct insulation, vapor retarders, and thermal continuity requirements; Available static pressure, friction rate calculation, and total effective length (Manual D procedure); Fitting equivalent lengths and airway velocity limits.

Duct System Components 5 items

Our study plan for this topic: Duct system types (radial, extended plenum, reducing trunk, perimeter loop); Available static pressure calculation and friction rate determination; Fitting equivalent lengths and their effect on total effective length; Air velocity limits for trunk ducts, branch ducts, and supply/return outlets; Balancing dampers: placement, function, and locking requirements; Duct construction materials and minimum metal thickness requirements (SC Mechanical Code); Duct sealing requirements, leakage classes, and approved sealing methods; Fire and smoke dampers in duct penetrations of rated assemblies.

Metal Ducts 3 items

Our study plan for this topic: Metallic duct minimum sheet metal thickness requirements by size and pressure classification; Mechanical fastening requirements for round metallic ducts (screws, rivets, lap dimensions); Joints, seams, and connections sealing methods (mastic, tape, UL 181B standards); Duct pressure classification based on static pressure ratings; Duct support requirements per SMACNA standards; Underground metallic duct installation requirements (concrete encasement, slope, sealing); Duct sizing procedure using friction rate, available static pressure, and total effective length; Metal duct gauge thickness and aspect ratio requirements for rectangular and round ducts.

Fiberglass Ducts 1 item

Our study plan for this topic: Fibrous glass duct construction standards (NAIMA and SMACNA); UL 181 listing and labeling requirements for duct board; Seams, joints, and closure systems for fibrous glass duct (UL 181A-P, 181A-M, 181A-H); Reinforcement and support requirements for duct board panels; Approved installation locations for rigid fiberglass duct board; SC Mechanical Code nonmetallic duct classification and air temperature limits; Duct board use in trunk systems with flexible runouts (sizing context); Duct insulation R-value identification and labeling on fiberglass duct board.

Filtering Systems 1 item

Our study plan for this topic: Types of air filters (disposable, washable, electrostatic, carbon, HEPA); MERV ratings and filter efficiency measurement methods; Electronic air cleaner operation and maintenance; Ultraviolet germicidal (UVG) light systems for air treatment; Indoor air pollutants (solid and gaseous) targeted by filtration; Filter installation, pressure drop measurement, and replacement intervals; Heat recovery ventilators (HRV) and energy recovery ventilators (ERV); Filter pressure losses as a component of duct system static pressure calculations.

Ventilation Equipment and Devices 2 items

Our study plan for this topic: Minimum outdoor airflow rates by occupancy type (Table 403.3.1.1); Natural vs. mechanical ventilation requirements; Energy recovery ventilators (ERVs) and heat recovery ventilators (HRVs); Exhaust systems for specific occupancies (kitchens, dryers, garages, hazardous areas); Air intake and exhaust outlet location requirements; Registers, diffusers, grilles, and dampers; Duct construction, materials, sealing, and insulation; Ventilation load calculations (sensible and latent) for heating and cooling.

Exhaust Systems 2 items

Our study plan for this topic: Exhaust discharge location requirements and minimum separation distances; Commercial kitchen Type I and Type II hood systems; Clothes dryer exhaust duct installation and length limitations; Hazardous exhaust systems for flammable vapors, dusts, and toxic materials; Smoke control system design and operation; Makeup air requirements for exhaust systems; Ventilation system balancing, airflow measurement, and duct testing; Energy recovery ventilation systems and prohibited applications.

General Electrical Knowledge 2 items

Our study plan for this topic: Ohm's Law and Watt's Law calculations (voltage, current, resistance, power); Series, parallel, and series-parallel circuit analysis; Single-phase and three-phase power systems; Overcurrent protection devices (fuses, circuit breakers, GFCI); Grounding, bonding, and equipment grounding conductors; Electric motor types and starting methods (split-phase, CSIR, CSCR, PSC, shaded-pole, three-phase); Electrical test instruments (voltmeter, ohmmeter, ammeter, multimeter, megohmmeter); OSHA 1926 Subpart K electrical safety requirements for construction jobsites.

Requirements for Electrical Installations 1 item

Our study plan for this topic: Grounding and bonding requirements for electrical systems and equipment; Ground-fault circuit interrupter (GFCI) requirements and applications; Overcurrent protection devices: fuses, circuit breakers, and their ratings; Wiring methods and conductor requirements for temporary and permanent installations; Working clearances and guarding of live electrical parts; Disconnecting means requirements for HVACR equipment and motors; Electrical equipment approval, listing, labeling, and marking requirements; Hazardous classified location electrical installation requirements.

Electrical/Electronic Fundamentals 1 item

Our study plan for this topic: Ohm's Law and Watt's Law calculations (voltage, current, resistance, power); Series, parallel, and series-parallel circuit analysis; Capacitance and capacitor types (start and run capacitors); AC vs. DC current characteristics and single-phase vs. three-phase power; Magnetism, electromagnetism, and transformer operation (step-up/step-down); Semiconductor devices (diodes, SCRs, triacs, transistors, thermistors); Electric motor types and starting methods (split-phase, CSIR, CSCR, PSC, shaded-pole, ECM, VFD); Electrical control systems (motor starting relays, pressure/temperature controls, circuit protection devices).

Safety 2 items

Our study plan for this topic: Lockout/tagout (LOTO) procedures for electrical and mechanical systems; Personal protective equipment (PPE) selection and use; Fire hazards, fire extinguisher classes, and PASS technique; Refrigerant cylinder safety and pressure vessel handling; Electrical hazards, grounding, and GFCI protection; Hazard communication, safety data sheets (SDS), and GHS pictograms; EPA Section 608 certification requirements and refrigerant handling regulations; Fall protection, ladder safety, confined spaces, and safe work practices.

Fire Rated Construction 1 item

Our study plan for this topic: Fire damper and smoke damper requirements for duct penetrations of fire-resistance-rated assemblies; Damper ratings, testing standards, and actuation methods (UL 555, UL 555S, temperature thresholds); Fire walls, fire barriers, fire partitions, and shaft enclosure damper placement requirements; Ceiling radiation damper installation in fire-resistance-rated floor/ceiling and roof/ceiling assemblies; Plenum construction materials and flame spread/smoke-developed index requirements; Fire-resistance ratings for temporary buildings and indoor storage room construction; Fire cutoffs, fire doors, and priority construction of fire walls during building construction; Duct penetration protection of horizontal assemblies and flexible duct restrictions at rated assemblies.

General Plan Reading 1 item

Our study plan for this topic: Reading and interpreting floor plan sketches and architectural drawings; Identifying and recording room dimensions, orientations, and north-arrow designation; Measuring and calculating areas for walls, ceilings, floors, windows, and doors; Interpreting window and door codes and alphanumeric construction designations on plans; Determining above-grade and below-grade wall classifications from plan details; Identifying construction details and insulation specifications from plans and specifications; Determining zoning requirements from architectural layout and room configurations; Locating equipment, duct runs, and utility services from plan information.

3 questions

Sample 1 — Load Calculations

Question: When supply-side duct leakage exceeds return-side duct leakage in a system running through unconditioned space, what pressure condition results in the conditioned space?

  • A. Negative pressure with increased infiltration
  • B. Positive pressure with increased infiltration
  • C. Neutral pressure with no infiltration change
  • D. Positive pressure with increased exfiltration

Correct Answer: A

Per Section 23 (Duct Load Procedures), when the supply-side leakage rate exceeds the return-side leakage rate, more air is lost from the supply than is drawn in through the return leaks. This causes a negative pressure in the conditioned space, which increases infiltration from outdoors and increases the central equipment load.

Reference: Manual J, Section 23 (Duct Load Procedures)

Sample 2 — Air Conditioning Systems

Question: You are designing a commercial refrigeration system that requires capacity modulation for a scroll compressor. The system must be able to reduce capacity without using a variable-speed motor drive. Which two alternative methods of capacity modulation are available for scroll compressors?

  • A. Reducing suction pressure with a CPR valve and adding liquid injection
  • B. Cylinder unloading and hot gas bypass
  • C. Opening a bypass port in the fixed scroll and briefly separating the fixed and orbiting scrolls
  • D. Installing multiple compressors in parallel and cycling them on and off

Correct Answer: C

Scroll compressors can modulate capacity by: (1) opening a bypass port partway between the outer edge and center of the fixed scroll to redirect partially compressed vapor back to the inlet, (2) using a variable speed motor, or (3) briefly moving the fixed and orbiting scrolls apart to create gaps that equalize pressure between pockets. The question excludes variable speed, leaving the bypass port and scroll separation methods.

Reference: Modern Refrigeration and Air Conditioning (20th ed.), Chapter 18, Section 18.2.3 — Scroll Compressor Capacity Modulation

Sample 3 — Heat Pumps

Question: You are replacing the suction-line accumulator on a residential air-source heat pump. In a heat pump refrigerant circuit, where must the accumulator be installed?

  • A. In the discharge line between the compressor and the reversing valve
  • B. In the suction line between the reversing valve and the compressor
  • C. In the liquid line ahead of the metering device
  • D. In the gas line between the reversing valve and the indoor coil

Correct Answer: B

Per Section 40.4.1 of Modern Refrigeration and Air Conditioning, the accumulator is installed in the suction line between the reversing valve and the compressor, because refrigerant flow in that segment never changes direction. It stores excess charge during heating mode and protects the compressor from liquid slugging.

Reference: Modern Refrigeration and Air Conditioning (20th ed.), Pages 1088 to 1089

Treat your first attempt as a checkup, not a verdict. After every attempt, the results page breaks your score down by outline topic, so you can see which topics need work. Compare your score with the real exam's passing score, 56 correct answers out of 80 scored questions, and keep practicing until you pass consistently.

  • Answer what you know first. Go through every question once, answer the ones you know, and bookmark the rest. Our practice exams let you bookmark and come back.
  • Come back to your bookmarks. Work them out on your second pass.
  • Watch your pace. The real exam works out to about 3 minutes per question.
  • Look up every miss. After each attempt, find each missed question's reference in your book and read the section.

Questions 80 questions
Time limit 4 hours
Passing score 56 correct answers out of 80 scored questions
Books in the exam room Open book
Exam fee $64
  • Your score is given immediately after the examination on screen and on a printed official report, with a diagnostic report of strengths and weaknesses if you do not pass.
  • Except for Burglar and Fire Alarm, an examination may be taken only 2 times in a 12-month period and thereafter only once in six months, and a candidate who passes an exam may not take it again.

Source: Commercial Contractor Candidate Information Bulletin, Updated 8/27/2026. Check the bulletin before test day: fees and rules can change.

10 free questions30 min · no account