Alabama Drainage and Culvert Contractor

30 questions 75 minutes 70% to pass 6 topics 2:30 per question Open book
Try 10 free questions Free Cheat Sheet Official Bulletin

Practice at the real exam's pace

Every practice exam shows your time per question against the real exam's clock (2:30 here), and each topic lands in one of these:

Ready Find it faster Study it Needs both Rushing: slow down

What's on the exam

Questions per topic, out of 30
Earthwork/Surveying8
Concrete5
Curbs and Gutters5
Culverts3
One Call5
Heavy Equipment/Safety4

Topics

Open a topic to read its key concepts

Earthwork/Surveying

8 on exam · 63 practice questions

Key Concepts

Reading plans and profiles - Utility site plans are normally drawn in two scales, with the horizontal scale usually ten times the vertical scale (for example 1 inch = 50 feet horizontally and 1 inch = 5 feet vertically). Slopes on a profile therefore appear steeper than they are. (Page 109) - Stationing is shown in multiples of 100 feet: the number left of the plus sign is hundreds of feet, the number right is feet in units of one. "Sta 3 + 75" is 375 feet from Sta 0 + 00. (Page 111) - In utility work the slope ratio lists horizontal first, vertical second: 3:1 means 1 foot of vertical fall in each 3 horizontal feet. Carpenters and plumbers reverse the order. (Pages 118–119) - A decimal grade of 0.0025 = 0.25 foot per 100 feet = 0.025 foot per 10 feet. (Pages 119–120) - Existing contours are drawn dashed, proposed (finish) contours solid. A proposed contour moving out over lower existing contours means fill; moving toward higher existing contours means cut. (Pages 257–258) - Mapping for final design of local drainage systems typically requires 1 inch = 100 feet to 1 inch = 200 feet with 1- or 2-foot contour intervals. (Design and Construction of Urban Storm Water Management Systems, Page 41)

Concrete

5 on exam · 50 practice questions

Key Concepts

Mixture proportioning / w-cm - Complete hydration of portland cement requires about 40% water by mass of cement (w/c of 0.40); below that, some cement remains unhydrated (Ch. 2, Water (Evaporable and Nonevaporable), p. 43). - Concrete placed underwater: not less than 390 kg/m³ (650 lb/yd³) cementing materials, maximum w/cm 0.45 (Ch. 13, Cementitious Materials Content, p. 271). - Chloride/corrosion resistance: maximum w/cm of 0.40 or less plus at least seven days of moist curing (Ch. 11, Materials and Methods to Control Corrosion, pp. 229–230). - Marine exposure: w/cm should not exceed 0.40; in northern climates the concrete must contain at least 6% air (Ch. 11, Marine Environment, p. 240). - Concrete placed directly on a vapor retarder: keep w/cm low (0.45 or less) (Ch. 15, p. 316).

Cement types and sulfate resistance - Type V (high sulfate resistance): C3A not more than 5%; Type II (moderate sulfate resistance) limit is 8% (Ch. 2, Types of Portland Cements, pp. 26–27). - Marine cements: C3A of 4% to 10% balances chloride binding against seawater sulfate attack (Ch. 11, p. 240). - ASTM C1012 mortar bars in 5% (33,800 ppm) sodium sulfate: less than 0.10% at 6 months = moderate sulfate resistance; less than 0.05% at 6 months (or less than 0.10% at 12 months) = high sulfate resistance (Ch. 20, Sulfate Resistance, p. 443).

Curbs and Gutters

5 on exam · 25 practice questions

Alabama Drainage and Culvert Contractor — 5 questions (17% of exam) Source: Design and Construction of Urban Storm Water Management Systems, Chapter 8


Key Concepts

Gutter and crown geometry (Ch. 8, Storm Drainage Design Criteria for Urban Streets, p. 251) - Gutter grade = grade of the gutter parallel to the direction of flow. The maximum allowable gutter grade is not governed by drainage, but allowable capacity on excessively steep slopes is limited. - Minimum allowable gutter grade: 0.4%, to facilitate proper drainage. - The maximum allowable crown slope is not affected by drainage; the minimum crown slope of the street should be 2% to facilitate drainage from the pavement. - Standard gutter with curb: at least 6 inches deep and 2 feet wide, deepest portion adjacent to the curb. Other configurations may be used as conditions require. - Some cities use higher curbs to maintain runoff capacity after repaving, though no recognized design criteria exist for maintaining such capacity. - Driveway entrances should be recessed into curbs and slope up to an elevation equal to the top of the curb.

Culverts

3 on exam · 15 practice questions

Key Concepts

Structural loads on buried culverts - Loads on pipe in sheeted trenches are computed from a trench width measured to the outside of the sheeting if it is pulled, or to the inside if it is left in place. Voids created by removal of the sheeting should be backfilled with a flowable material such as pea gravel (Ch. 14, Sec. VIII.B.3, Book Page 564). - Steel sheeting to be removed should be pulled in increments as the trench is backfilled, with soil compacted to prevent voids. Wood sheeting to be removed is cut off 1.5 ft above the top of the pipe, with the sheeting alongside the pipe left in place. Sheeting left in place is cut off no less than 3 ft below final ground elevation; sheeting should be driven at least to the bottom of the pipe bedding (Ch. 14, Book Page 564). - Highway live load effects at depths greater than 10 ft below the pavement surface are insignificant, so for pipes with cover exceeding that amount live load effects can be neglected (Ch. 14, Sec. VIII.C.3, Book Page 589). - Minimum depth of cover of culverts typically ranges from 1–3 feet (Ch. 8, Structural Design, Page 308).

One Call

5 on exam · 23 practice questions

Exam topic: One Call — Ala. Code §§37-15-1 to 37-15-10.2 (AL Act 94-487 S.299)

Key Concepts

Purpose. The act safeguards against injury and loss of life from excavation or demolition and protects underground facilities from damage and service interruption (§37-15-1).

Definitions (§37-15-2). - Working day hours — 7:00 A.M. to 5:00 P.M. local time on working days (§37-15-2(30)); one-call services should be provided during those hours (§37-15-5(h)). - Working day — a 24-hour period beginning the start of the next working day from receipt of notification, excluding Saturday, Sunday and nine listed holidays (§37-15-2(29)). - Tolerance zone — the width of the facility plus 18 inches on either side of the outside edge, on a horizontal plane (§37-15-2(26)). - Approximate location — accurate within 18 inches measured horizontally from each outside edge (§37-15-2(1)). - Damage — includes substantial weakening of structural or lateral support, penetration or destruction of protective coating/housing/device, and partial or complete severance — but "does not apply to any operator's abandoned underground facility" (§37-15-2(6)). - Routine roadway maintenance — maintenance work on a roadway not done pursuant to a government bid contract for which plan drawings were developed in advance (§37-15-2(25)); excavation excludes routine roadway maintenance activities carried out by or for those responsible for publicly-maintained roadways only if they occur entirely within the right of way of a public road, street, or highway; are carried out with reasonable…

Heavy Equipment/Safety

4 on exam · 32 practice questions

Key Concepts

Cave-in protection (Subpart P) - Each employee in an excavation must be protected by an adequate protective system except where the excavation is made entirely in stable rock, or is less than 5 feet (1.52 m) deep and a competent person's examination of the ground shows no indication of a potential cave-in — §1926.652(a)(1). - Simple-slope maximum allowable slopes (horizontal:vertical), Appendix B, Figure B-1 (B-1.1): Type A = 3/4:1 for excavations 20 feet or less deep; Type B = 1:1; Type C = 1 1/2:1. Short-term exception (Type A soil): 1/2:1 is permitted for simple slope excavations in Type A soil that are 12 feet or less in depth and open 24 hours or less — Figure B-1 (B-1.1) and §1926.652(b)(2). - Trench shields/boxes selected from manufacturer's tabulated data: deviation from the manufacturer's specifications, recommendations and limitations is allowed only after the manufacturer issues specific written approval, and that written approval must be at the jobsite during construction of the protective system — §1926.652(c)(2)(ii). - Spoil and equipment: keep materials at least 2 feet (.61 m) from the edge, use sufficient retaining devices, or a combination of both — §1926.651(j)(2). - Field practice (Pipe and Excavation Contracting): the bottom of a trench box should sit 2 to 3 feet higher than the pipe; too low and pulling the box disturbs bedding and newly-laid pipe; **more than 5 feet above the…

Final Practice Exam
30 questions · 75 min · timed simulation of the real exam
Never the same exam twice. Every attempt is drawn fresh from 208 questions, about 6 full exams' worth, and questions you haven't seen come first.
Business and Law exam included
11 topics · 50 questions · 120 min

Required Books

Open-book exam
2021 (Code of Alabama 37-15)
Alabama 1Call – Dig Safely; AL Act 94-487 S.299
Official source
OSHA Standards for the Construction Industry
Buy on Amazon
17th Edition
Design and Control of Concrete Mixtures
Buy on Amazon
Revised
Pipe and Excavation Contracting
Buy on Amazon
1992 (ASCE MOP 77)
Design and Construction of Urban Storm Water Management Systems
Official source
3rd Edition
NASCLA Contractors Guide to Business Law and Project Management, Alabama General
Buy on Amazon