Alabama Drainage, Irrigation and Flood Control Contractor

45 questions 120 minutes 70% to pass 7 topics 2:40 per question Open book
Try 10 free questions Free Cheat Sheet Official Bulletin

Practice at the real exam's pace

Every practice exam shows your time per question against the real exam's clock (2:40 here), and each topic lands in one of these:

Ready Find it faster Study it Needs both Rushing: slow down

What's on the exam

Questions per topic, out of 45
Sitework11
Concrete10
Curbs and Gutters4
Culverts3
One Call3
Heavy Equipment/Safety4
Irrigation10

Topics

Open a topic to read its key concepts

Sitework

11 on exam · 76 practice questions

Key Concepts

Plans and symbols. Utility site plans are normally drawn in two scales, with the horizontal scale usually ten times the vertical scale (e.g., 1" = 50' horizontally, 1" = 5' vertically); this is why profile slopes look steeper than they are (Page 109). Stationing runs in multiples of 100 feet — "Sta 3 + 75" is 375 feet from Sta 0 + 00 (Page 111). In utility work a ratio is written horizontal first, vertical second, so 3:1 means 1 foot of vertical fall in each 3 horizontal feet (Pages 118–119). Existing contours are dashed, proposed contours solid; a proposed contour moving out over lower existing contours means fill, and moving toward higher existing contours means cut (Pages 257–258).

Grade. A decimal grade of 0.0025 equals 0.25 foot per 100 feet, or 0.025 foot per 10 feet (Pages 119–120). When the grade rod is set on top of the pipe, add the rod reading on the hub and the cut quantity, then subtract the pipe diameter plus wall thickness to get HI (Pages 120–121). The practical maximum range of most pipe lasers is about 400 feet, because temperature differences and water vapor bend and enlarge the beam;…

Concrete

10 on exam · 75 practice questions

Key Concepts

Cement types and sulfate exposure. Type V (high sulfate resistance) owes its performance to a tricalcium aluminate content of not more than 5%; 8% is the limit for Type II (moderate sulfate resistance), and 15% is the compositional limit on C4AF+2(C3A) for Type V — Ch. 2, Types of Portland Cements, Pages 26–27. For a marine/seawater environment, cements with C3A of 4% to 10% have given satisfactory performance, balancing chloride binding against sulfate resistance; w/cm should not exceed 0.40, and in northern climates the concrete must contain at least 6% air — Ch. 11, Materials and Methods for a Marine Environment, Page 240.

Water-cementitious materials ratio. Complete hydration of portland cement requires about 40% water by mass of cement (w/c of 0.40); below about 0.40 some cement remains unhydrated — Ch. 2, Water (Evaporable and Nonevaporable), Page 43. To maximize chloride (corrosion) resistance: maximum w/cm of 0.40 or less plus at least seven days of moist curing — Ch. 11, Materials and Methods to Control Corrosion, Pages 229–230. For concrete placed underwater: not less than 390 kg/m³ (650 lb/yd³) cementing materials with a maximum w/cm of 0.45 — Ch. 13, Step 7, Cementitious Materials Content, Page 271.…

Curbs and Gutters

4 on exam · 20 practice questions

Source: Design and Construction of Urban Storm Water Management Systems, Chapter 8 (Design of Drainage Conveyances)

Key Concepts

Gutter grade and crown slope (Ch. 8, "Storm Drainage Design Criteria for Urban Streets," p. 251) - Gutter grade = grade of the gutter parallel to the direction of flow. - The maximum allowable gutter grade is not governed by drainage, but capacity of gutters on excessively steep slopes is limited. - The minimum allowable gutter grade, to facilitate proper drainage, should be 0.4%. - The maximum allowable crown slope is not affected by drainage requirements, but the minimum crown slope of the street should be 2%.

Standard gutter dimensions (Ch. 8, p. 251) - The standard gutter, together with a curb, should be at least 6 inches deep and 2 feet wide, with the deepest portion adjacent to the curb. Other configurations may be used as conditions require. - Some cities use higher curbs to maintain runoff capacity after repaving, though there are no recognized design criteria for maintaining such capacity. - Driveway entrances should be recessed into curbs and slope up to an elevation equal to the top of the curb.

Culverts

3 on exam · 15 practice questions

Alabama Drainage, Irrigation and Flood Control Contractor Source: Design and Construction of Urban Storm Water Management Systems (ASCE)

Key Concepts

Culvert hydraulics and sizing - Outlet control, tailwater below the top of the culvert: h₀ is the average of critical depth and culvert diameter, (d_c + D)/2, or the tailwater depth, whichever is greater (Ch. 8, Design Procedure/Culvert Rating, pp. 302–305). - Localities often stipulate that the engineer assume 25% debris blockage when computing required culvert size; greater blockage may be justified under certain conditions (Ch. 8, Culvert Sizing, p. 307). - Maximum velocity in a culvert is controlled by two factors: channel protection at the outlet and the maximum allowable headwater. Maximum headwater depths are normally stipulated by local governments, generally as a factor times the culvert diameter or rise (Ch. 8, p. 307). - Assume inlet and outlet protection is required: inlets normally a headwall with wingwalls or a flared end section; outlets the same plus riprap protection. Minimum depth of cover typically ranges from 1–3 feet (Ch. 8, p. 307).

One Call

3 on exam · 15 practice questions

Topic: One Call — Alabama Underground Damage Prevention law (Ala. Code §§37-15-1 to 37-15-10.2)

Key Concepts

Purpose. The act safeguards against injury and loss of life from excavation or demolition and protects underground facilities from costly damage and interruption of service (§37-15-1).

Prohibition. No person shall excavate in a street, highway, public easement, private easement, or implied easement of an operator, or on an operator's property, or blast or demolish near an operator's underground facility, without first ascertaining the location of all underground facilities as prescribed in §§37-15-4 and 37-15-6. A violation does not subject a person to the civil penalties of §37-15-10 provided both: the easement or facility is on property owned by that person and that person did not have knowledge of its existence or presence (§37-15-3).

Definitions you must know (§37-15-2). - Excavation (10): movement/removal of earth, rock or other material by mechanized equipment or explosive device — includes augering, backfilling, blasting, boring, digging, ditching, drilling, grading, trenching, etc. It excludes qualifying routine roadway maintenance within the public right of way, within the limits of the original excavation, performed with reasonable care. - Routine roadway maintenance (25): maintenance on a roadway not done pursuant to a…

Heavy Equipment/Safety

4 on exam · 32 practice questions

Key Concepts

Cave-in protection (Subpart P). Each employee in an excavation must be protected by an adequate protective system except where the excavation is entirely in stable rock, or is less than 5 feet (1.52 m) deep and a competent person's examination of the ground shows no indication of a potential cave-in (§1926.652(a)(1)). Deviation from a manufacturer's tabulated data for a shield or support system is allowed only after the manufacturer issues specific written approval, which must be in written form at the jobsite during construction of the protective system (§1926.652(c)(2)(ii)). Excavated material and equipment must be kept at least 2 feet (.61 m) from the edge, or held by retaining devices, or a combination of both (§1926.651(j)(2)).

Sloping values (Appendix B, Figure B-1 (B-1.1); §1926.652(b)(2)): simple slope in Type A soil 20 feet or less deep = 3/4:1; short-term exception = 1/2:1 for simple slope excavations open 24 hours or less and 12 feet or less deep. Type B simple slope = 1:1; Type C = 1 1/2:1.

Irrigation

10 on exam · 50 practice questions

Key Concepts

Sprinkler performance and spacing - A single head supplies enough water to sustain good plant growth for only the inner two-thirds of its radius of throw; the outer third requires overlap (Irrigation Reference, Ch. 3 — Locating Sprinkler Heads, Sprinkler Performance). - Manufacturers' triangular spacing, as a percentage of throw diameter: no wind 60%, 4-mph wind 55%, 8-mph wind 50% (Ch. 18 — Consider Winds When Laying Out Your Sprinkler Heads). In the Ch. 18 rectilinear example, square spacing at a 4-mph wind uses 50% of the diameter. - Triangular spacing gives more uniform distribution, less waste, fits irregular sites, and uses fewer heads. In the 6-ft × 59-ft narrow-space example, square spacing used three more heads than triangular (Ch. 18 — Triangular Spacing in Narrow Spaces).

Geographical areas and precipitation - Before defining areas and laying out heads, evaluate plant water needs (plant type, sun/shade, proximity to tree roots) and soil permeability rate (soil type, slope of soil) (Irrigation Reference, Ch. 6). - On steep slopes with clay soils (permeability as low as 0.2 in/hr), select heads with a low precipitation rate to avoid runoff (Ch. 6 — Select the Sprinkler Head for Area 3).

Final Practice Exam
45 questions · 120 min · timed simulation of the real exam
Never the same exam twice. Every attempt is drawn fresh from 283 questions, about 6 full exams' worth, and questions you haven't seen come first.
Business and Law exam included
11 topics · 50 questions · 120 min

Required Books

Open-book exam
2021 (Code of Alabama 37-15)
Alabama 1Call – Dig Safely; AL Act 94-487 S.299
Official source
OSHA Standards for the Construction Industry
Buy on Amazon
Revised
Pipe and Excavation Contracting
Buy on Amazon
Simplified Irrigation Design
Buy on Amazon
17th Edition
Design and Control of Concrete Mixtures
Buy on Amazon
1992 (ASCE MOP 77)
Design and Construction of Urban Storm Water Management Systems
Official source
3rd Edition
NASCLA Contractors Guide to Business Law and Project Management, Alabama General
Buy on Amazon