EN ES
Study Course

California C-10 Electrical Contractor Exam

115 questions 210 minutes 72% to pass 5 topics 1:49 per question Closed book
Try 10 free questions Free Cheat Sheet Official Bulletin

Practice at the real exam's pace

Every practice exam shows your time per question against the real exam's clock (1:49 here), and each topic lands in one of these:

Ready Find it faster Study it Needs both Rushing: slow down

What's on the exam

Questions per topic, out of 115
Planning and Estimating32
Rough Wiring31
Finish Wiring and Trim13
Startup, Troubleshooting, and Maintenance18
Safety21

Topics

Open a topic to read its key concepts

Planning and Estimating

32 on exam · 218 practice questions

Key Concepts

Circuit nomenclature. A feeder is all circuit conductors between the service equipment, the source of a separately derived system, or other power supply source and the final branch-circuit overcurrent device (CEC 2025, Article 100). Demand factor is the ratio of the maximum demand of a system, or part of a system, to the total connected load (CEC 2025, Article 100). A main is a supply circuit to which other energy-consuming circuits connect through automatic cutouts at different points, is the same size wire for its entire length, and has no cutouts in series with it (AEH 17th ed., Div. 3, Secs. 11–18).

Continuous loads. A load operating 3 hours or more is continuous; continuous load may not exceed 80 percent of the circuit rating, stated inversely as the device being rated at least 125 percent of the continuous load (AEH, Div. 3, Sec. 95). The 125 percent multiplier is already included in the unit loads of NEC Table 220.12 (Ugly's 2023, General Lighting Loads by Non-dwelling Occupancy).

Branch circuits. Dwelling minimums under CEC 210.11(C): two or more 20-A small-appliance, at least one 20-A laundry, one or more 120-V 20-A bathroom, at least one 120-V 20-A garage circuit. On a 15- or 20-A multiple-outlet circuit, utilization equipment fastened in place (other than luminaires) shall not exceed 50 percent of the circuit rating where lighting units or non-fastened cord-and-plug equipment are also supplied, CEC 210.23(B)(2); any one cord-and-plug item not fastened in place shall not exceed 80 percent, 210.23(B)(1).

Rough Wiring

31 on exam · 167 practice questions

Key Concepts

Conductor material and devices - Wiring devices connected directly to solid aluminum 15- and 20-A branch-circuit conductors must be marked CO/ALR on the mounting strap; AL-CU, CU-AL and CC-CU are connector/terminal markings for other equipment (Div. 2, Secs. 18 and 171E). - Copper-clad aluminum ampacity is the same as aluminum of the same size; connectors must be marked CC-CU or CU-AL (Div. 2, Sec. 18). - Unless marked SOL or STR, connectors listed 30 through 10 AWG serve solid and stranded; connectors 8 AWG and larger are for stranded only (Div. 2, Sec. 161). - Hand-applied rubber tape over a standard split copper connector must be at least 50 percent greater than the original cable insulation thickness, measured over the connector's maximum diameter (Div. 2, Sec. 112).

Cable methods - Type AC: a short fiber (anti-short) bushing is inserted wherever the armor is cut (Div. 2, Sec. 56). - Type MI: an approved moisture seal at all points of termination, in addition to approved fittings (Div. 9, Sec. 10). - Type MC smooth sheath minimum inner bending radius: 10× diameter to 19 mm (3/4 in.); 12× over 19 mm to 38 mm (1-1/2 in.); 15× over 38 mm. Interlocked or corrugated sheath uses 7× (Div. 9, Sec. 196). - Interlocked armored cable not in conduit: not less than 7 times overall diameter (12 times for flat-tape, wire-armored, shielded) (Div. 2, Sec. 169F). - SE cable is listed in 12 AWG and larger copper, 10 AWG and larger aluminum/copper-clad; a 100-A dwelling service requires at minimum 2 AWG aluminum SE cable (Div. 2, Secs. 60 and 169D2). - NM in a nominal 57 × 100 mm (2-1/4 ×…

Finish Wiring and Trim

13 on exam · 64 practice questions

Key Concepts

Receptacles and devices - Push-in (screwless conductor push-in) terminals: install only on branch circuits not greater than 15 amperes, connected with 14 AWG solid copper only unless listed and marked otherwise — 406.3(D)(3). - Bathtub/shower prohibited zone: 900 mm (3 ft) horizontally from any outside edge, and vertically from the floor to 2.5 m (8 ft) above the tub rim or shower threshold — 406.9(C). - Wet-location 15- and 20-ampere, 125- and 250-volt receptacles: enclosure weatherproof whether or not the plug is inserted; an outlet box hood must be listed and identified as extra duty, hinged covers opening at least 90 degrees after installation; receptacle must be listed weather-resistant — 406.9(B)(1). - Insulating faceplates: noncombustible and not less than 2.54 mm (0.10 in.) thick, unless formed or reinforced for mechanical strength — 406.6(C). Metal: 0.030 in. ferrous, 0.040 in. nonferrous — 406.6(A). - Wire-binding screws or studs and nuts with upturned lugs are permitted only for 10 AWG or smaller — 110.14(A). Splices/connectors for direct burial must be listed for such use — 110.14(B). - At least 150 mm (6 in.) of free conductor; where the opening is less than 200 mm (8 in.) in any dimension, each conductor must extend at least 75 mm (3 in.) outside the opening — 300.14. - Panelboards with snap switches rated 30 amperes or less: overcurrent protection 200 amperes or less — 408.36(A). - AC-DC general-use snap switch: inductive loads limited to 50 percent of switch rating; an ac-only general-use snap switch may carry electric-discharge lamp loads to full rating (AEH Div. 4, Sec. 33).

Startup, Troubleshooting, and Maintenance

18 on exam · 85 practice questions

California C-10 Electrical Contractor Exam — 18 questions (16%)

Key Concepts

Test instruments and fault location - Split-jaw (clamp-on) ammeter on dc: open and close the jaws immediately before reading to reduce hysteresis error while current is rising or falling. Reversing the tongs and averaging two readings applies only when the current is steady. (Div. 1, Sec. 175) - Head-receiver-and-battery test set: it gives at least a weak click even through extremely high resistance, so no click at all means the test set itself is open (dead cell, broken cord, loose clip). An open circuit still gives a faint click; a short gives a vigorous click. (Div. 1, Sec. 163) - Clamp-on ammeter with multiple wraps: divide the displayed reading by the number of passes; wraps must not cross over one another. (Ugly's, Selecting and Using Test Instruments) - ANSI device function numbers: 87 = differential, 64 = ground-protective, 51 = ac time overcurrent, 40 = loss of excitation. (Div. 1, Sec. 21) - Used motor winding, after thorough cleaning and drying: apply 150% of normal voltage for 1 minute; a new winding stands twice normal plus 1000 V. (Div. 7, Sec. 246)

Electrical safety (NFPA 70E basis) - Noncontact/proximity testers may verify absence of voltage only on systems over 1000 V. At 1000 V or less they may only confirm the presence of voltage before a contact instrument is used. (Div. 13, Sec. 54) - Arc flash boundary = where incident energy equals 1.2 cal/cm² (onset of second-degree burn). 8, 12, 40 cal/cm² are PPE arc ratings. (Div. 13, Sec. 78) - At fused equipment, after phase-to-phase and phase-to-ground tests at the switch load terminals, also perform a…

Safety

21 on exam · 94 practice questions

Key Concepts

GFCI and assured equipment grounding (§2405.4) - On construction sites the employer shall use either or both GFCIs per §2405.4(c) or an assured equipment grounding conductor program per §2405.4(d). - All 120-volt, AC, single-phase, 15- and 20-ampere receptacle outlets not part of the permanent wiring and in use by employees shall have approved GFCIs. Receptacles on a two-wire, single-phase portable or vehicle-mounted generator rated not more than 5 kW, with circuit conductors insulated from the generator frame and all grounded surfaces, need not be GFCI protected (§2405.4(c)). - AEGCP: written program available at the job site; one or more designated qualified persons; visual inspection before each day's use, except cord sets and receptacles which are fixed and not exposed to damage (§2405.4(d)(3)); continuity and terminal tests (§2405.4(d)(4)); identification by log, color coding or other effective means indicating the last test date or the interval tested (§2405.4(d)(7)).

Lockout/tagout (§3314) - Tagout device attachment means: non-reusable, attachable by hand, self-locking, non-releasable, minimum unlocking strength no less than 50 pounds (§3314(e)). - Repetitive process machines (e.g., numerical control): operating station under control of a qualified operator or craftsman at all times; participants in clear view or positive communication; participants beyond reach of rapidly moving elements; rapidly moving elements separately locked out if the operator leaves the station; machine de-energized during repair procedures adjusting or replacing mechanical components (§3314(f)). - Periodic inspection at least annually, by an authorized employee or person other than the one(s) using the procedure inspected; certification identifies the machine, date, employees included, and person performing it (§3314(j)).

Final Practice Exam
115 questions · 210 min · timed simulation of the real exam
Never the same exam twice. Every attempt is drawn fresh from 628 questions, about 5 full exams' worth, and questions you haven't seen come first.
Law and Business Exam included
7 topics · 115 questions · 210 min

Required Books

Closed-book exam
2023 Edition
Ugly's Electrical References 2023
Buy on Amazon
17th Edition
American Electricians' Handbook, 17th Edition
Buy on Amazon
2025 Edition
California Building Code 2025
Buy on Amazon
2026 Edition
Cal/OSHA Title 8 Construction Safety Orders (Subchapter 4)
Official source
2026 Edition
Cal/OSHA Title 8 General Industry and Electrical Safety Orders (selected sections)
Official source
2025 Edition
California Energy Code 2025
Official source
2025 Edition
California Fire Code 2025
Official source
2025 Edition
California Electrical Code 2025
Official source
3rd Edition
Photovoltaic Systems, 3rd Edition
Buy on Amazon
14th Edition
NASCLA Contractors Guide to Business, Law and Project Management – 14th Edition
Buy on Amazon
2026 Edition
Employer's Tax Guide (Publication 15, Circular E)
Official source
2026 Edition
California Contractors License Law & Reference Book, 2026 Edition
Official source
2026 Edition
California Employer's Guide (DE 44), 2026
Official source
October 2023
California Public Works Manual (Labor Commissioner), October 2023
Official source
2023 Edition
Get Licensed to Build: A Guide to Becoming a California Licensed Contractor (CSLB)
Official source
Nov 2026
Maintain and Change Your License (CSLB)
Official source
2026 Edition
California Labor Code (selected sections)
Official source
2026 Edition
California Financial Code, Division 9, Chapter 3.5 Program Administrators (PACE)
Official source
As an Amazon Associate we earn from qualifying purchases.
$59.95/monthCancel anytime. Instant access.