Louisiana Culverts and Drainage Structures
Practice at the real exam's pace
Every practice exam shows your time per question against the real exam's clock (2:40 here), and each topic lands in one of these:
What's on the exam
Questions per topic, out of 45Topics
Sitework
Key Concepts
Plan reading. Utility site plans are normally drawn in two scales, with the horizontal scale usually ten times the vertical scale (e.g., 1 in = 50 ft horizontally, 1 in = 5 ft vertically); slopes on a profile therefore appear steeper than they are (Page 109). Existing contours are drawn dashed, proposed (finish) contours solid; a proposed contour extending out over lower existing contours means fill is required, while proposed contours moving toward higher existing contours indicate cut (Pages 257–258). Stationing is shown in multiples of 100 feet — the number left of the plus is hundreds of feet, the number right is units of feet, so Sta 3 + 75 is 375 feet from Sta 0 + 00 (Page 111).
Slope notation. In utility work the horizontal distance is given first, vertical second, so 3:1 means 1 foot of vertical fall in each 3 horizontal feet. The text warns the ratio method is easily misunderstood and is not precise enough for utility line grades (Pages 118–119). A decimal grade of 0.0025 = 0.25 ft per 100 ft = 0.025 ft per 10 ft (Pages 119–120).
Concrete
Key Concepts
Cement types and properties - Type V (high sulfate resistance) owes its performance to a tricalcium aluminate (C₃A) content of not more than 5%; 8% is the limit for Type II (moderate sulfate resistance), and 15% is the compositional limit on C₄AF + 2(C₃A) for Type V. (Ch. 2, Types of Portland Cements — Type II and Type V, pp. 26–27) - For a marine/seawater environment, cements with C₃A 4% to 10% have performed satisfactorily, balancing chloride binding against sulfate resistance; w/cm should not exceed 0.40, and in northern climates the concrete must contain at least 6% air. (Ch. 11, Materials and Methods for a Marine Environment, p. 240) - False set = significant loss of plasticity without much heat, caused by re-crystallization of secondary gypsum; additional mixing without added water restores workability. Flash set (rapid C₃A hydration) releases considerable heat and cannot be dispelled by further mixing. (Ch. 2, Early Stiffening, p. 48) - Complete hydration of portland cement requires about 40% water by mass of cement (w/c 0.40); below that, some cement stays unhydrated. (Ch. 2, Water — Evaporable and Nonevaporable, p. 43) - If curing temperatures exceed about 70°C (158°F), delayed ettringite formation (DEF)…
Curbs and Gutters
All citations: Design and Construction of Urban Storm Water Management Systems, Chapter 8.
Key Concepts
Gutter grade and crown slope (p. 251). The gutter grade is the grade of the gutter parallel to the direction of flow. The maximum allowable gutter grade is not governed by drainage, though capacity on excessively steep slopes is limited; the minimum allowable gutter grade to facilitate proper drainage is 0.4%. The maximum allowable crown slope is likewise not affected by drainage requirements, but the minimum crown slope should be 2%.
Gutter dimensions (p. 251). The standard gutter, together with a curb, should be at least 6 inches deep and 2 feet wide, with the deepest portion adjacent to the curb. Other configurations may be used as conditions require. Some cities use higher curbs to allow for maintaining runoff capacity after repaving, though there are no recognized design criteria for doing so. Driveway entrances should be recessed into curbs and slope up to an elevation equal to the top of the curb.
Culverts
Key Concepts
Culvert rating / outlet control. When the tailwater is below the top of the culvert, the outlet depth term h₀ is taken as the average of critical depth and the culvert diameter, (d_c + D)/2, or the tailwater depth, whichever is greater (Ch. 8, Design Procedure/Culvert Rating, Pages 302–305).
Culvert sizing and debris. Localities often stipulate that the engineer assume 25% debris blockage when computing the required size of the culvert; greater blockage may be justified under certain conditions (Ch. 8, Culvert Sizing, Page 307). Minimum depth of cover of culverts typically ranges from 1–3 feet, and the engineer should generally assume inlet and outlet protection is required (Ch. 8, Page 307).
Debris/safety racks (culvert entrances). Racks should be hinged at the top for lifting and cleaning, slope at 3:1 to 5:1 (horizontal to vertical) so debris rides up as water rises, have bar spacing a child cannot pass through (typically maximum 6 inches clear), be located a considerable distance out from the entrance so entrance velocities are low, and provide net open surface area at least four times the cross-sectional area of the pipe (Ch. 8, Sec. X.A.4, Page 308).
One Call
Topic: One Call — Louisiana 811 Brochure
Key Concepts
Notice is mandatory and must be given two full business days ahead. "State law requires notification to 811 TWO FULL BUSINESS DAYS BEFORE DIGGING." Anyone planning demolition or excavating work must notify Louisiana 811 by calling 811 or 1-800-272-3020, or via LOUISIANA811.COM, at least two full business days prior to the project's start date (Page 1 — 'It's the Law!'). Member owners/operators have two business days to mark their lines, and "by law, you may not perform any excavation work during this time" (Page 2 — Excavator FAQ). Count by excluding weekends, the ticket submission date, and holidays (Page 2 — 'For Best Results').
Call-center hours. Louisiana 811 accepts calls Monday through Friday, excluding holidays, for normal locate requests. Damage and emergency locate requests may be called in 24 hours a day, seven days a week. Locate requests made after 6:00 p.m. are considered the next business day (Page 1 — 'It's the Law!').
Heavy Equipment/Safety
Key Concepts
Cave-in protection (Subpart P) - Each employee in an excavation must be protected by an adequate protective system except where the excavation is made entirely in stable rock, or is less than 5 feet (1.52 m) deep and a competent person's examination of the ground shows no indication of a potential cave-in — §1926.652(a)(1). - Maximum allowable slopes, simple slope, 20 ft or less (Appendix B, Figure B-1 (B-1.1) and §1926.652(b)(2)): Type A 3/4:1; Type B 1:1; Type C 1 1/2:1. Short-term exception for Type A: 1/2:1 for simple slope excavations open 24 hours or less and 12 feet or less deep. - Shields/shields selected by manufacturer's tabulated data: deviation from the manufacturer's specifications, recommendations and limitations is allowed only after the manufacturer issues specific written approval, kept in written form at the jobsite — §1926.652(c)(2)(ii). - Excavated material and equipment must be kept at least 2 feet (.61 m) from the edge, or held by retaining devices, or a combination of both — §1926.651(j)(2).
Irrigation
Key Concepts
Sprinkler performance and spacing - A single sprinkler supplies enough water to grow green grass for only the inner two-thirds of its radius of throw; the outer one-third must be covered by overlap (Irrigation Reference, Ch. 3 — Locating Sprinkler Heads, Sprinkler Performance). - Manufacturers' triangular spacing, as a percentage of throw diameter: no wind 60%, 4-mph wind 55%, 8-mph wind 50% (Ch. 18 — Consider Winds When Laying Out Your Sprinkler Heads). For square spacing in a 4-mph wind the figure is 50% of diameter (Ch. 18). - Triangular spacing gives more uniform distribution, less waste, and fewer heads; in a narrow 6-ft strip, square spacing used three more heads than triangular (Ch. 18 — Triangular Spacing in Narrow Spaces).
Geographical areas - Define areas by plant water needs (plant type, sun/shade location, proximity to tree roots) and soil permeability rate (soil type, slope of soil) before laying out heads (Ch. 6). - On steep slopes with clay soils (permeability as low as 0.2 in/hr), select heads with a low precipitation rate to avoid runoff (Ch. 6 — Select the Sprinkler Head for Area 3).