Louisiana Heavy Construction

30 questions 75 minutes 70% to pass 7 topics 2:30 per question Open book
Try 10 free questions Free Cheat Sheet Official Bulletin

Practice at the real exam's pace

Every practice exam shows your time per question against the real exam's clock (2:30 here), and each topic lands in one of these:

Ready Find it faster Study it Needs both Rushing: slow down

What's on the exam

Questions per topic, out of 30
Erosion and Sedimentation Control2
OSHA Safety6
Sitework5
Concrete6
Metals Including Concrete Reinforcement3
Pipes4
Pre-Cast and Pre-Stressed Concrete Erecting4

Topics

Open a topic to read its key concepts

Erosion and Sedimentation Control

2 on exam · 10 practice questions

Louisiana Heavy Construction — 2 questions (7% of exam) Source: Storm Water Management for Construction Activities (EPA 833-B-92-001), October 1992

Key Concepts

Coverage and structure. Discharges of storm water runoff from construction sites which disturb 5 or more acres of land must be covered by an NPDES permit (Page 1). The process has six phases: site evaluation and design development, assessment, control selection and plan design, certification and notification, construction/implementation, and final stabilization/termination (Page 1).

Site Evaluation and Design Development Phase (Pages 3–4). - Existing soils data must be included in the plan where such information exists. - Existing runoff water quality data must be included if they exist. If there are no existing data on the quality of runoff from the site, it is not necessary to collect or analyze storm water samples for the Construction General Permit (Page 3). - Identify the name and location of the receiving water. If the site drains into a Municipal Separate Storm Sewer System, identify the system and indicate the receiving water to which the system discharges (Page 3). - Describing construction activity requires two things: (1) describe the purpose or goal of the project (e.g., a highway interchange) and (2)…

OSHA Safety

6 on exam · 30 practice questions

Key Concepts

Excavations (Subpart P) - A protective system is required for every employee in an excavation except where the excavation is made entirely in stable rock, or is less than 5 feet (1.52 m) deep and a competent person's examination shows no indication of a potential cave-in — §1926.652(a)(1). - Trenches 4 feet (1.22 m) or more deep: stairway, ladder, ramp or other safe egress placed so no more than 25 feet (7.62 m) of lateral travel is required — §1926.651(c)(2). - Keep excavated material and equipment at least 2 feet (.61 m) from the edge, use sufficient retaining devices, or both — §1926.651(j)(2). - Prevent exposure to flammable gas in excess of 20 percent of the lower flammable limit — §1926.651(g)(1)(iii). - Deviating from manufacturer's tabulated data for a shield/shoring system requires specific written approval from the manufacturer, in written form at the jobsite — §1926.652(c)(2)(ii).

Sitework

5 on exam · 49 practice questions

Key Concepts

Volume states. Swell is the volume increase when soil or rock is excavated and loosened from the earth's crust; shrinkage is the volume reduction when soils or rock are subjected to moisture or mechanical compaction (CPEM Ch. 4 — Soil and Rock, Glossary). Solid rock swells 20 to 40% from bank to placement in an embankment; between the bank and loose states, solid rock swells as much as 65%. Most cohesive soils shrink 10 to 30% from bank to compacted; between bank and loose they swell about 40% (Construction Equipment Guide, Ch. 4 — Volumetric Measure).

Trench and basement takeoff. Trench length is figured on the outside perimeter. Haul-off is always figured in loose yards, and partial loads round up to the next whole truck load (Pipe and Excavation Contracting — Ch. 9, Estimating Surface Excavation).

Proctor tests. Standard Proctor (ASTM D-698 / AASHTO T 99): 5.5-lb rammer, 2-in. circular base, 25 drops from 12 in., three equal layers, 4.0-in. ID mold, 4.59-in. height; total compaction effort 12,400 foot-pounds (CEG Ch. 5 — COMPACTION TESTS; Pipe & Excavation, p. 179). Modified Proctor (ASTM D-1557 / AASHTO T 180): **10-lb rammer dropped 18 in. on each of five…

Concrete

6 on exam · 55 practice questions

Key Concepts

Mixture proportioning and w/cm - Complete hydration of portland cement requires about 40% water by mass of cement (w/c of 0.40); below about 0.40 some cement remains unhydrated for lack of water (DCCM 17th ed., Ch. 2 — Water (Evaporable and Nonevaporable), p. 43). - Concrete placed underwater: not less than 390 kg/m³ (650 lb/yd³) cementing materials, maximum w/cm 0.45 (Ch. 13 — Cementitious Materials Content, p. 271). - Concrete placed directly on a vapor retarder: keep w/cm low (0.45 or less) (Ch. 15, p. 316). - Modulus of elasticity for normal-density concrete of 20–35 MPa (3000–5000 psi) ≈ 57,000 × √f′c (psi), equal to 5000 × √f′c (MPa) (Ch. 10 — Modulus of Elasticity, p. 200).

Fresh concrete properties and testing - Temperature (ASTM C1064/AASHTO T 309): thermometer accurate to ±0.5°C (±1°F), left in the sample at least 2 minutes but not more than 5 minutes, with at least 75 mm (3 in.) of concrete around the sensor; test started within 5 minutes of obtaining the sample; infrared thermometers are not approved (Ch. 20, p. 431). - Setting time (ASTM C403/AASHTO T 197): initial set at 3.4 MPa (500 psi), final set at 27.6 MPa (4,000…

Metals Including Concrete Reinforcement

3 on exam · 14 practice questions

Louisiana Heavy Construction · 3 questions (10%) Source: Placing Reinforcing Bars, Recommended Practices (10th ed.), CRSI

Key Concepts

Concrete and bond (Ch. 3 — Concrete and Reinforced Concrete, Definitions) - Concrete is one part cement, about 1-1/2 to 2-1/2 parts fine aggregate (usually sand), about 3 to 5 parts coarse aggregate (gravel, crushed stone or blast-furnace slag), and clean water. Varying proportions yields strengths from about 3,000 to 10,000 psi, and higher. - Concrete attains full rated strength in a specified length of time, usually 28 days. High-early-strength cement reaches about the same strength in about one-half or one-third of the time required with ordinary cement. Air-entraining cement creates tiny air voids, giving a more plastic mix that resists freezing and thawing. - Concrete is strong in compression, relatively weak in tension and shear; steel is strong in tension, compression and shear. - Bond = the gripping of the bars by concrete — adhesion of concrete to the bar surface plus resistance from the deformations (ribs), which keeps bars from slipping and makes the two materials act as one (Ch. 6 — Reinforcing Steel: Purpose and Location in Concrete). - Compressive strength is verified with standard plastic molds forming…

Pipes

4 on exam · 20 practice questions

Key Concepts

Pipe sizing and strength designations - Pipe size classification was originally based on inside diameter (ID), but wall-thickness variation made outside diameter (OD) the accepted standard (Page 298). - The three primary strength designations are standard wall (Std.), extra strong wall (XS) and double extra strong wall (XXS) — also called XH and XXH. Steel pipe up to 12 inches in diameter is assigned schedule numbers from schedule 10 (S.10, light wall) to schedule 160 (S.160, double extra heavy wall); wrought iron pipe is classified by Std., XS and XXS, not by schedule numbers (Page 298). - SDR = pipe OD ÷ wall thickness. SDR 11 means the OD is 11 times the wall thickness; thin-wall pipe has a high SDR, thick-wall pipe a low SDR (Page 298).

Materials selection - Copper: Type M is thin-walled (interior distribution); Type L is thicker, for indoor and outdoor water service (hard in 20-foot lengths, soft in 100-foot rolls); Type K is the thickest, used mainly for underground lines — soft Type K is sold in 60- or 100-foot rolls, except 2-inch tubing, sold in 40-foot rolls (Page 299). - CPVC in water distribution: 400 psi at room temperature, 100…

Pre-Cast and Pre-Stressed Concrete Erecting

4 on exam · 20 practice questions

Key Concepts

Transportation and securement - Tie-down assemblies and securement devices should have an aggregate static breaking strength at least 1-1/2 times the weight of the precast units being secured. An equivalent method is an aggregate static working load limit equal to at least 1/2 (0.5) times the weight of the units. (Div. 2, §2.1.4 Loading and Delivery) - Stacked units in on-site storage shall be separated and supported at blocking points on the erection drawings; dunnage arranged in vertical planes and deep enough to clear lifting devices. When stacking stemmed members or plank, dunnage shall not be continuous over more than one stack. Upper members of a stacked tier shall not be used as additional storage area. (Div. 2, §2.1.6 Site Storage)

Crane and equipment selection - Maximum hoisting weight = piece weight + the weight of ALL rigging hanging from the boom tip, including jibs, hooks, hook blocks, slings, and all other load-handling devices including the hoist rope. (Div. 1, §1.6 Equipment Selection) - All lifting beams, spreader bars, or lifting trusses shall have lifting capacity plainly marked; ultimate capacity shall have a minimum safety factor of 5. (Div. 3, §3.3)

Final Practice Exam
30 questions · 75 min · timed simulation of the real exam
Never the same exam twice. Every attempt is drawn fresh from 198 questions, about 6 full exams' worth, and questions you haven't seen come first.

Required Books

Open-book exam
OSHA Standards for the Construction Industry
Buy on Amazon
17th Edition
Design and Control of Concrete Mixtures
Buy on Amazon
10th (2022)
Placing Reinforcing Bars, Recommended Practices
Buy on Amazon
9th Edition, 2018
Construction Planning, Equipment, and Methods
Buy on Amazon
2nd (MNL-127-99, 1999)
Erectors' Manual – Standards and Guidelines for the Erection of PreCast Concrete Products
Buy on Amazon
Revised
Pipe and Excavation Contracting