Louisiana Municipal and Public Works Construction

30 questions 75 minutes 70% to pass 7 topics 2:30 per question Open book
Try 10 free questions Free Cheat Sheet Official Bulletin

Practice at the real exam's pace

Every practice exam shows your time per question against the real exam's clock (2:30 here), and each topic lands in one of these:

Ready Find it faster Study it Needs both Rushing: slow down

What's on the exam

Questions per topic, out of 30
Excavation and Grading4
Electrical Power Distribution5
Concrete and Concrete Reinforcement5
Water and Sewer Piping6
Erosion and Sedimentation Control3
OSHA Safety4
Welding3

Topics

Open a topic to read its key concepts

Excavation and Grading

4 on exam · 44 practice questions

Key Concepts

Compaction specifications (Ch. 6, Soil Compaction, Page 184) - Fill in a grassy area: usually 85 percent of maximum dry density. - Soils under building slabs, sidewalks, etc.: usually 90 percent of maximum dry density for cohesive soils, or 95 percent for non-cohesive soils. - Standard Proctor (T-99; AASHTO T 99-70 / ASTM D 698) is usually specified for fill under building slabs and sidewalks and in utility trenches under grassy areas: ¾-inch sieve, 3 layers, 25 blows per layer with a 5.5-lb, 2-inch hammer, 12,400 foot-pounds total (Page 183). Modified Proctor (T-180; AASHTO T 180-70 / ASTM D 1557) is for nuclear power plants, federal highways, heavy-duty paved areas, concrete drives, airport runways and other high-design-load areas: 5 layers, 25 blows with a 10-lb hammer, 56,250 foot-pounds (Page 184).

Field density and problem soils - Nuclear density meter (ASTM 2922): if the soil is above optimum moisture at the time of testing, the excess moisture is deducted from the score, making an acceptable determination harder (Page 186). - Where several soil types are partially mixed, obtain a Proctor for each soil type and each mix; better practice is keeping soils separate (Page 189). - Water settling…

Electrical Power Distribution

5 on exam · 29 practice questions

Key Concepts

Distribution circuits and voltages (Ch. 5 — Distribution Circuits) - Circuits carrying power from the substation to local load areas are called express feeders, distribution main feeders, or primary circuits, and generally operate at 2,400 to 34,500 volts. - Residential/some commercial secondary service is single-phase 120/240 volts; standard commercial and small industrial customer three-phase voltages are typically 208Y/120 volts or 480Y/277 volts. The voltages normally used for three-phase secondary circuits are 208Y/120 volts four-wire, 240 volts three-wire, 480Y/277 volts four-wire, and 480 volts three-wire. - With a 120-volt base, minimum normal service voltage is 114 volts and maximum normal service voltage is 126 volts. - In a four-wire Y system, line-to-line voltage is √3 × E; for the same power transmitted, current in the four-wire system is only 58 percent as large, and converting delta to Y raises load-carrying capacity 73 percent.

Neutral conductor (Ch. 5 — Neutral Conductor) - The NESC requires multigrounded primary-neutral conductors be grounded at a minimum of four locations per mile and at each piece of equipment connected to the primary and neutral. A single ground connection makes the neutral unigrounded.

Concrete and Concrete Reinforcement

5 on exam · 50 practice questions

Key Concepts

Portland cement types (sulfate exposure). High sulfate resistance of Type V is attributed to a low tricalcium aluminate content of not more than 5%; 8% is the limit for Type II (moderate sulfate resistance); 15% is the compositional limit on C4AF+2(C3A) for Type V. A low water-to-cementitious materials ratio is also required for sulfate performance. (DCCM 17th ed., Ch. 2 — Types of Portland Cements, Type II and Type V, Pages 26–27)

Marine environment. Portland cements with C3A contents ranging from 4% to 10% provide satisfactory protection against seawater sulfate attack and chloride-induced corrosion; w/cm should not exceed 0.40 for marine exposures; in northern climates concrete must contain at least 6% air. (Ch. 11 — Materials and Methods for a Marine Environment, Page 240)

Corrosion control. To maximize chloride resistance, reduce permeability with a maximum w/cm of 0.40 or less together with at least seven days of moist curing; judicious use of SCMs with extended moist curing further reduces permeability. (Ch. 11 — Materials and Methods to Control Corrosion, Pages 229–230)

Water and Sewer Piping

6 on exam · 29 practice questions

Key Concepts

Materials selection - Water service pipe shall be not less than 3/4 inch (19.1 mm) in diameter (IPC 2021, Section 603.1, Page 6-2). - CPVC in water distribution: 400 psi at room temperature, 100 psi at 180°F; 160 psi is the top of the polyethylene range and 315 psi the maximum for PVC (Pipe and Excavation Contracting, Page 301). - Type K is the thickest copper tubing, used mainly underground; soft Type K comes in 60- or 100-foot rolls except 2-inch, sold in 40-foot rolls (Page 299). - Reinforced concrete pipe D-Load: Class III under normal loads, Class IV under airport runways and highways with heavy traffic, Class V under railroad tracks (Page 307). - For a common operating pressure of 70 psi, engineers will probably specify materials designed for 150 to 160 psi (Page 208); the three most common water pipe classes hold 150, 200 and 350 psi (Page 196). - Piping used for any purpose other than conveying potable water shall not be used for potable water — disinfection does not change this (IPC 608.11, Page 6-14).

Erosion and Sedimentation Control

3 on exam · 14 practice questions

Key Concepts

Permit applicability. Storm water discharges from construction sites that disturb 5 or more acres must be covered by an NPDES permit; EPA issued General Permits in the September 9 and September 25, 1992 Federal Register (Brief Guide, Page 1).

Six phases. (1) site evaluation and design development, (2) assessment, (3) control selection/plan design, (4) certification and notification, (5) construction/implementation, (6) final stabilization/termination (Page 1).

Collect site information (Site Evaluation Phase, (A), Page 3). The plan must include existing soils information, existing runoff water quality data where such data exist, the location of surface waters on the site, and the name of the receiving water. If the site drains into a Municipal Separate Storm Sewer System, identify the system and indicate the receiving water to which the system discharges. If there are no existing data on runoff quality, it is not necessary to collect or analyze storm water samples for the Construction General Permit.

OSHA Safety

4 on exam · 20 practice questions

Key Concepts

Fall protection (Subpart M, §1926.105, §1926.104) - Guardrails must withstand at least 200 pounds applied within 2 inches of the top edge in any outward or downward direction (§1926.502(b)(3)); when that load is applied downward the top edge shall not deflect to a height less than 39 inches above the walking/working level (§1926.502(b)(4)). Nominal installed top rail height is 42 inches (§1926.502(b)(1)); 34 inches is the minimum low point of a warning line (§1926.502(f)(2)(ii)). - Safety net drop test: a 400-pound (180 kg) bag of sand, 30 ±2 inches in diameter, dropped from the highest walking/working surface where employees are exposed, but not from less than 42 inches above that level (§1926.502(c)(4)(i)). - Under §1926.105(c)(1), nets shall extend 8 feet beyond the edge of the work surface and be installed as close under it as practical, in no case more than 25 feet below. - Positioning device anchorages: capable of supporting at least twice the potential impact load or 3,000 pounds (13.3 kN), whichever is greater (§1926.502(e)(2)). Personal fall arrest anchorages: 5,000 pounds per employee (§1926.502(d)(15)). - Safety belt and lanyard hardware, except rivets, must withstand a tensile loading of 4,000 pounds without cracking, breaking, or permanent…

Welding

3 on exam · 15 practice questions

Key Concepts

Oxyfuel gas supply and pressures - Acetylene is unsafe above 15 psig (103 kPa). Storing acetylene in its gaseous form under pressure is not safe at pressures above 15 psig. Most acetylene low-pressure gauge scales are graduated up to only 15 psig, with higher pressures shown by a solid red arc (Ch. 12, Sections 12.3.1 and 12.3.3; Fig. 12-23, 12-30). - A two-stage oxygen regulator reduces cylinder pressure through the first stage to about 200 psig (1400 kPa); the second stage then regulates from 200 psig down to the selected working pressure. In a two-stage acetylene regulator, the first stage reduces pressure to approximately 50 psig (350 kPa) (Section 12.4.3). - Oxygen cylinder pressure can be 2200 psig (15 200 kPa) — open the oxygen cylinder valve slowly; rapid high-pressure flow could rupture the regulator diaphragm or gauges (Ch. 13 turn-on procedure, step 4). - Hose fitting identification: the acetylene nut has a groove machined around its six sides and left-hand threads; the oxygen nut has flat, smooth sides and right-hand threads (Section 12.5). Red hose is usually fuel gas; green or black carries oxygen. Common hose IDs: 3/16″, 1/4″, 5/16″ (4.8, 6.4, 7.9 mm).

Final Practice Exam
30 questions · 75 min · timed simulation of the real exam
Never the same exam twice. Every attempt is drawn fresh from 201 questions, about 6 full exams' worth, and questions you haven't seen come first.

Required Books

Open-book exam
OSHA Standards for the Construction Industry
Buy on Amazon
2021 Edition
International Plumbing Code 2021
Buy on Amazon
17th Edition
Design and Control of Concrete Mixtures
Buy on Amazon
12th Edition
Modern Welding
Buy on Amazon
13th (2017)
Lineman's and Cableman's Handbook
Buy on Amazon
Rev. April 2024
DIPRA Installation Guide for Ductile Iron Pipe
Official source
Revised
Pipe and Excavation Contracting
Buy on Amazon
1992 (EPA 833-B-92-001)
Storm Water Management for Construction Activities
Official source
As an Amazon Associate we earn from qualifying purchases.
$59.95/monthCancel anytime. Instant access.