100 questions 270 minutes 75% to pass 9 topics 2:42 per question Open book
Try 10 free questions Free Cheat Sheet Official Bulletin

Practice at the real exam's pace

Every practice exam shows your time per question against the real exam's clock (2:42 here), and each topic lands in one of these:

Ready Find it faster Study it Needs both Rushing: slow down

What's on the exam

Questions per topic, out of 100
Project Design & Management8
Safety9
Electrical Theory and Principles11
General Code Requirements17
Wiring and Protection17
Wiring Methods & Materials16
General Equipment Use13
Special Occupancies, Special Equipment, and Special Conditions8
Communication Systems1

Topics

Open a topic to read its key concepts

Project Design & Management

8 on exam · 46 practice questions

Key Concepts

Scheduling (NASCLA 14th ed., Ch. 8) - Both bar chart and calendar scheduling share the same main weakness: they do not show the interdependencies of activities — a delay in one task does not show its impact on other tasks (Ch. 8 — Bar Chart Scheduling). - Calendar scheduling's primary advantage is linking tasks to specific dates (other projects, material delivery dates, payment schedules, employee vacations and holidays); it works for smaller, less complex projects (Ch. 8 — Calendar Scheduling). - The critical path method (CPM) illustrates the interdependent relationship of tasks. The critical path is the sequence of tasks that determines project duration; activities with "zero float" are critical activities (Ch. 8 — Critical Path Method). - The superintendent generally oversees all daily operations; the foreman supervises specific areas by trade (e.g., carpentry foreman — rough and finish carpentry; masonry foreman — formwork and concrete installation) (Ch. 8 — Foreman).

Safety

9 on exam · 44 practice questions

Key Concepts

Arc flash (NFPA 70E 2024) - The arc flash boundary is the distance at which incident energy equals 1.2 cal/cm² (5 J/cm²) — the threshold incident energy for a second-degree burn [130.5(E)(1); see also 130.7(C)(6)]. - Incident energy analysis must be updated when distribution system changes could affect results and reviewed for accuracy at intervals not to exceed 5 years [130.5(G)]. Equipment label data is likewise reviewed at intervals not to exceed 5 years [130.5(H)]. - An arc-rated hood is required when anticipated incident energy exceeds 12 cal/cm² (50.2 J/cm²) [130.7(C)(10)(b)(2)]. - Employees inside the arc flash boundary shall wear hearing protection [130.7(C)(5)]. - Hierarchy of risk control: (1) Elimination, (2) Substitution, (3) Engineering controls, (4) Awareness, (5) Administrative controls, (6) PPE [Informative Annex F, Table F.3].

Electrical Theory and Principles

11 on exam · 52 practice questions

Key Concepts

Ohm's Law and the formula circle. Current is directly proportional to voltage (Theory 12.6(A)(1)) and inversely proportional to resistance (12.6(A)(2)). The three transpositions are I = E/R (amperes), E = I × R (volts), and R = E/I (ohms) — Unit 12, Sections 12.6(B) and 12.7. Ugly's states the same relationships on Page 1. Note R = I × E is not a valid transposition.

Watt's Law / Power Formula. Amperes = Watts ÷ Volts; P = E × I; P = I² × R; R = E²/P (Ugly's Ohm's Law chart, Pages 1–2).

Utilization voltages. Residential lights and receptacles operate at 120V; ranges, dryers, and air-conditioning equipment at 120/240V or 240V (12.3(A)(1)). In commercial and industrial occupancies the voltage is often 277V for lighting and 480V for motors and air-conditioning units (12.3(A)(2)).

General Code Requirements

17 on exam · 83 practice questions

Key Concepts

Article 90 — Arrangement and units. Chapters 1 through 4 apply generally; Chapters 5, 6, and 7 apply to special occupancies, special equipment, or other special conditions and may supplement or modify the requirements in Chapters 1 through 7. Chapter 8 covers communications systems and is not subject to Chapters 1–7 except where specifically referenced in Chapter 8; Chapter 9 consists of tables applicable as referenced (90.3). SI units shall appear first, with inch-pound units immediately following in parentheses, and conversion from inch-pound to SI is based on hard conversion except as provided in 90.9(C) (90.9(B)). Exception: the tables in Informative Annex C are permitted to list trade sizes before SI units (90.9(B) Exception).

110.2 Approval. Conductors and equipment required or permitted by the Code are acceptable only if approved.

Wiring and Protection

17 on exam · 84 practice questions

Key Concepts

Conductor and OCPD sizing for continuous loads - Feeders: minimum ampacity = noncontinuous load + 125 percent of the continuous load (215.2(A)(1)). The feeder OCPD rating is sized the same way (215.3). - Branch circuits: the OCPD rating shall not be less than 125 percent of the continuous load (210.20(A)). - Voltage drop (recommendation only): 3 percent at the farthest outlet for branch circuits, with total feeder + branch circuit drop not exceeding 5 percent (210.19, Informational Note; see also 215.2(A)(2), IN No. 2).

Overcurrent protection - Small conductors: 14 AWG Cu = 15 A; 12 AWG Cu = 20 A; 10 AWG Cu = 30 A; 12 AWG Al/CCA = 15 A; 10 AWG Al/CCA = 25 A (240.4(D)(4)–(8)). - Next-higher-standard-rating rule: permitted for devices 800 amperes or less when the conductor ampacity does not correspond to a standard rating and the conductors are not part of a branch circuit supplying…

Wiring Methods & Materials

16 on exam · 80 practice questions

Key Concepts

Protection of wiring in framing (300.4) - Bored holes: edge of hole not less than 32 mm (1¼ in.) from the edge of the wood member; where that distance can't be maintained, protect with a steel plate or bushing at least 1.6 mm (1/16 in.) thick — 300.4(A)(1). - Notches: steel plate at least 1.6 mm (1/16 in.) thick, of appropriate length and width — 300.4(A)(2). - Parallel to framing members/furring strips: nearest outside surface not less than 32 mm (1¼ in.) from the nearest edge; otherwise steel plate, sleeve, or equivalent at least 1.6 mm (1/16 in.). Exception No. 1: not required for RMC, IMC, rigid nonmetallic conduit, or EMT — 300.4(D). - Under metal-corrugated sheet roof decking: not less than 38 mm (1½ in.) from the lowest surface of the decking to the top of the cable, raceway, or box; RMC and IMC with listed steel or malleable iron fittings…

General Equipment Use

13 on exam · 64 practice questions

Key Concepts

Motor conductor sizing (Article 430, Part II) - A single continuous-duty motor: conductors ≥ 125 percent of motor full-load current per 430.6(A)(1) — NEC 2023, 430.22. - Wye-start, delta-run: line-side conductors ≥125%, but conductors between the controller and the motor ≥72 percent of FLC (58% × 1.25) — 430.22(C). Part-winding motors use 62.5 percent — 430.22(D). - DC motor from a rectified single-phase supply, rectifier output to motor: 190 percent (half-wave bridge), 150 percent (full-wave bridge) — 430.22(A). - Other-than-continuous duty: Table 430.22(E). Intermittent duty, 30- and 60-minute rated motor = 90 percent of nameplate current. - 18 AWG copper is permitted for a motor with FLC >3.5 A and ≤5 A only with maximum Class 10 or Class 10A overload protection per 430.32 (FLC ≤3.5 A requires maximum Class 20) — 430.22(G)(1). - Several motors: **125 percent of the highest rated motor's FLC plus the sum of all other motors' FLCs…

Special Occupancies, Special Equipment, and Special Conditions

8 on exam · 36 practice questions

Key Concepts

Hazardous (classified) locations — classification - Class I, Division 1: ignitible concentrations of flammable gases/vapors can exist under normal operating conditions (500.5(B)(1)). - Group D: flammable gas or vapor with an MESG greater than 0.75 mm or an MIC ratio greater than 0.80 (500.6(A)(4)). - Area classification documentation must be available to the AHJ (500.4).

Sealing (Article 501) - Conduit seals entering an explosionproof enclosure: installed within 450 mm (18 in.) of the enclosure, or as required by the enclosure marking; only threaded couplings or explosionproof fittings (unions, reducers, elbows, capped elbows) not larger than the conduit trade size are permitted between seal and enclosure (501.15(A)(1)). - Compound thickness in completed seals, other than listed cable sealing fittings: not less than the trade size of the fitting, and in no case less than 16 mm (5/8 in.) (501.15(C)(3)). - Division 1 and Division 2 boundary seals may be on either side, within…

Communication Systems

1 on exam · 8 practice questions

NEC 2023, Chapter 8 and Article 810

Key Concepts

Primary protection (805.90) - A listed primary protector is required on each circuit run partly or entirely in aerial wire or aerial cable not confined within a block [805.90(A)]. - Also required on each circuit, aerial or underground, within the block containing the building served where exposed to accidental contact with electric light or power conductors operating at over 300 volts to ground [805.90(A)]. - Where a lightning exposure exists, each interbuilding circuit must be protected at each end [805.90(A)]. - Location: in, on, or immediately adjacent to the structure served and as close as practicable to the point of entrance [805.90(B)]. Not in hazardous (classified) locations or near easily ignitible material [805.90(C)]. - Article 840 premises-powered systems: "The requirements of 805.90 shall apply" [840.90].

Final Practice Exam
100 questions · 270 min · timed simulation of the real exam
Never the same exam twice. Every attempt is drawn fresh from 497 questions, about 4 full exams' worth, and questions you haven't seen come first.

Required Books

Open-book exam
OSHA Standards for the Construction Industry
Buy on Amazon
2024 Edition
Standard for Electrical Safety in the Workplace, NFPA 70E
Buy on Amazon
2023 Edition
National Electrical Code 2023
Buy on Amazon
14th Edition
NASCLA Contractors Guide to Business, Law and Project Management – 14th Edition
Buy on Amazon
2023 Edition
Ugly's Electrical References 2023
Buy on Amazon
7th (2021)
A Guide to the Project Management Body of Knowledge (PMBOK Guide)
Buy on Amazon
2022 (I-P)
ANSI/ASHRAE/IES Standard 90.1-2022, Energy Standard for Sites and Buildings Except Low-Rise Residential Buildings (I-P)
Official source
2022 Edition
Mike Holt's Understanding Electrical Theory for NEC Applications
Buy on Amazon
2024 Edition
29 CFR 1910 - OSHA Occupational Safety and Health Standards (General Industry)
Buy on Amazon
Ferm's Fast Finder Index
Buy on Amazon
Key Word Index by Tom Henry, Based on the National Electrical Code
Buy on Amazon
As an Amazon Associate we earn from qualifying purchases.
$59.95/monthCancel anytime. Instant access.