South Carolina - NASCLA-Accredited Trade for Electrical Contractor Exam Study Guide
This guide covers what you need for the South Carolina - NASCLA-Accredited Trade for Electrical Contractor exam: the key facts from the official bulletin, the topics it tests, the reference books, sample questions with answers, and a plan to prepare. PSI gives the exam.
South Carolina - NASCLA-Accredited Trade for Electrical Contractor Exam at a Glance
Here are the exam's key facts from the official bulletin:
| Questions | 100 scored questions plus up to 10 unscored experimental questions that count against your time |
| Time limit | 270 minutes |
| Passing score | 75 correct answers out of 100 scored questions |
| Books in the exam room | Open book |
| Exam fee | $116 |
On exam day
- One valid, unexpired signature- and photo-bearing government ID matching the registered legal name is required at the test site.
- Candidates should arrive at the examination site at least 30 minutes before their appointment.
- The examinations are open book; books must be otherwise unmarked and contain no additional papers, and proctors inspect all books before and after the exam.
- Books may be highlighted, underlined and indexed but not written in, and only permanent tabs that would tear the page if removed are allowed.
- Only silent, battery-operated, non-programmable calculators without paper tape printing or an alphabetic keyboard are allowed.
- Only approved items may be taken into the examination room and all personal belongings, including electronic devices, writing devices, reading material, food and drinks, must be stored in the secure storage provided.
References you may bring
- Physical Diagram/Blueprint Packet (handed out onsite at the testing center)
- National Electrical Code or National Electrical Code Handbook (2020 or 2023)
- Code of Federal Regulations - 29 CFR 1926 - OSHA Construction Industry Regulations (2024)
- Code of Federal Regulations - 29 CFR 1910 - OSHA Occupational Safety and Health Standards (2024)
- A Guide to the Project Management Body of Knowledge (2021, 7th edition)
- ANSI/ASHRAE/IES 90.1-2022, Energy Standard for Sites and Buildings Except Low-Rise Residential Buildings - I-P edition
- NASCLA Contractors Guide to Business, Law and Project Management (Basic 14th Ed., 2024)
- NFPA 70E - Standard for Electrical Safety in the Workplace (2024)
- Ugly's Electrical References (2023 Edition)
- Understanding Electrical Theory for NEC Applications
- Ferm's Fast Finder Index (Optional Reference)
- Key Word Index by Tom Henry, Based on the National Electrical Code (Optional Reference) (2017, 2020, 2023 Editions)
Scheduling, changes and retakes
- Candidates schedule online at https://test-takers.psiexams.com/sccon or by calling PSI at (855) 340-3701.
- Minimum qualification must be met before registering, and the Registration Confirmation Notice issued after PSI approval is valid for one year or until an examination classification has been failed twice within the referenced time frame.
- Candidates may cancel and reschedule without forfeiting the fee if notice is received 2 days before the examination date, and voice mail or email is not acceptable notice.
- Candidates who fail to cancel on time, do not appear, arrive after the examination start time, or lack proper ID have their registration invalidated and forfeit the examination fee.
- Results are given immediately on screen, with a performance summary for passers and a printed diagnostic report for those who fail.
- Each classification examination (except Burglar and Fire Alarm) may be taken only twice in a 12-month period and thereafter only once in six months, and a passed exam may not be retaken.
- After passing the required examinations, the candidate submits the commercial license application with the documented experience affidavit.
Source: Commercial Contractor Candidate Information Bulletin, Updated 9/15/2026. Check the bulletin before test day: fees and rules can change.
What the South Carolina - NASCLA-Accredited Trade for Electrical Contractor Exam Covers
The official content outline has 9 topics:
| Topic | Questions | Share of the exam |
|---|---|---|
| Project Design & Management | 8 | 8% |
| Safety | 9 | 9% |
| Electrical Theory and Principles | 11 | 11% |
| General Code Requirements | 17 | 17% |
| Wiring and Protection | 17 | 17% |
| Wiring Methods & Materials | 16 | 16% |
| General Equipment Use | 13 | 13% |
| Special Occupancies, Special Equipment, and Special Conditions | 8 | 8% |
| Communication Systems | 1 | 1% |
How to Prepare for the South Carolina - NASCLA-Accredited Trade for Electrical Contractor Exam
Start with the books. This is an open-book exam, so the references on the bulletin's list are your main study tool. Get the books on the bulletin's list. Except for code books, the bulletin lets you base your answers on later editions.
Learn where things are. Read the table of contents and the index of each book until you know where every major subject lives. On test day, finding an answer fast matters more than memorizing it.
Highlight the sections you use most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
Spend most of your time on the biggest topics. General Code Requirements and Wiring and Protection make up 34% of the exam.
Take timed practice exams. The clock trains you to find answers at the pace the real exam needs: about 2 minutes 27 seconds per question.
Aim to pass more than once. One passing score can be luck. Several in a row means you're ready.
Reference Books for the South Carolina - NASCLA-Accredited Trade for Electrical Contractor Exam
The bulletin lists the reference books for the NASCLA-Accredited Trade Examination for Electrical Contractor, including a blueprint packet handed out onsite, the NEC, OSHA 1926 and 1910, the PMBOK Guide, ASHRAE 90.1-2022, the NASCLA Contractors Guide, NFPA 70E, Ugly's Electrical References, Understanding Electrical Theory for NEC Applications, and two optional index references.
Where to get them:
- OSHA 29 CFR 1926
- NEC 2023
- Standard for Electrical Safety in the Workplace, NFPA 70E
- NASCLA Contractors Guide 14th (national)
- Ugly's Electrical References 2023
- PMBOK Guide 7th
- ASHRAE 90.1-2022
- Holt Understanding Electrical Theory 2022
- OSHA 29 CFR 1910 (2024)
On Test Day
- Go through the whole exam first. Answer every question you know and bookmark the ones you don't. The bulletin says you can return to any question and change your answer as long as exam time has not run out. You may leave the room only to use the restroom, with the proctor's permission, and you get no extra time for it.
- Then go back to your bookmarks and work them out.
- Don't let one question eat your time. You have 270 minutes for 100 scored questions plus up to 10 unscored experimental questions that count against your time, which is about 2 minutes 27 seconds per question.
- Before you finish, answer anything you skipped. A blank can't earn a point.
Study Tips
This practice exam mirrors the real PSI exam — the same number of questions, drawn from the same topics. Practicing in that format now means no surprises when you sit for the real thing.
Your license won't show your exam score. Whether you ace it or squeak by, you walk out licensed either way — as we like to say, C's get licenses. Aim to pass, not to be perfect, and don't tally your score as you go; that pressure only drags your performance down.
Skim the answer choices before you commit. You're hunting for the key term or vocabulary word that signals the right concept. The more you've practiced, the faster the right wording jumps out at you.
You're given plenty of time, so use as much of it as you need. Don't get rattled when other people finish early — finishing first isn't a prize. Work at your own steady pace and review your answers before you submit.
Read the explanation for every question — right or wrong. Understanding the underlying rule lets you answer reworded questions you've never seen, instead of memorizing specific answers.
Sample South Carolina - NASCLA-Accredited Trade for Electrical Contractor Practice Questions
These questions come from our practice question bank, each with its answer and reference.
Sample 1 — General Equipment Use
Question: Individual dry-type transformers rated more than 112½ kVA installed indoors shall be installed in a transformer room with a minimum fire resistance rating of how many hours?
- A. ½ hour
- B. 1 hour
- C. 2 hours
- D. 3 hours
Correct Answer: B
Per NEC 450.21(B), individual dry-type transformers of more than 112½ kVA rating shall be installed in a transformer room of fire-resistant construction having a minimum fire rating of 1 hour.
Reference: NEC 2023 Section 450.21(B)
Sample 2 — Electrical Theory and Principles
Question: In Ohm's Law, if an electrical appliance is rated at 1200 watts and is connected to 120 volts, how much current will it draw?
- A. 10 amperes
- B. 20 amperes
- C. 5 amperes
- D. 15 amperes
Correct Answer: A
Using the Power Formula (Watt's Law), Amperes = Watts ÷ Volts. Therefore, I = 1200W ÷ 120V = 10 amperes. While commonly grouped with Ohm's Law in electrical references (such as Ugly's Electrical References power wheel), this is technically the Power Formula (P = V × I), solved for current.
Reference: Ugly's Electrical References, 2023 ed., Ohm's Law, Page 1
Sample 3 — Safety
Question: When a work-related fatality occurs, within how many hours must employers orally report it to the nearest OSHA Area Office?
- A. 4 hours
- B. 8 hours
- C. 12 hours
- D. 24 hours
Correct Answer: B
According to the NASCLA Contractors Guide, when a work-related fatality occurs, employers must orally report the fatality to the nearest OSHA Area Office within eight (8) hours. Note: Under current OSHA reporting requirements (29 CFR 1904.39), fatalities must be reported within 8 hours, while in-patient hospitalizations, amputations, or losses of an eye must be reported within 24 hours.
Reference: NASCLA Contractors Guide, Jobsite Safety and Environmental Factors chapter — OSHA Recordkeeping section
Sample 4 — Project Design & Management
Question: What formula is used to determine the labor cost for each task in the quantity take-off estimating method?
- A. Labor Rate ÷ Required Labor Hours = Labor Cost per Task
- B. Required Labor Hours x Number of Workers = Labor Cost per Task
- C. Labor Rate x Overhead Percentage = Labor Cost per Task
- D. Required Labor Hours x Labor Rate = Labor Cost per Task
Correct Answer: D
According to the NASCLA Contractors Guide (Page 7-3), the formula for determining labor cost per task in the quantity take-off method is: Required Labor Hours per Task × Labor Rate = Labor Cost per Task.
Reference: NASCLA Contractors Guide, Bidding and Estimating chapter — Quantity Take-off section
Why Practice Online Instead of With a PDF
A PDF shows you questions. It doesn't show you the clock. Our practice exams are timed and on a screen, so you practice finding answers under time pressure, not just reading them. Each attempt draws a new set of questions from our bank, and your results break the score down by outline topic so you know what to study next.
Start Practicing
Take the free South Carolina - NASCLA-Accredited Trade for Electrical Contractor practice exam to see where you stand, then work through the topics that need attention. For the official rules, read the exam bulletin, and see the licensing board's website.