What's on the exam
Questions per topic, out of 50Topics
Safety - Code of Federal Regulations
Key Concepts
Excavations (Subpart P) - A protective system is required for every employee in an excavation except where the excavation is made entirely in stable rock, or is less than 5 feet (1.52 m) deep and a competent person's examination of the ground shows no indication of a potential cave-in — §1926.652(a)(1). - Excavated material and equipment must be kept at least 2 feet (.61 m) from the edge, or retained by sufficient retaining devices, or both — §1926.651(j)(2). - Deviating from a manufacturer's tabulated data, recommendations and limitations for a shield or shoring is allowed only after the manufacturer issues specific written approval, and that approval must be in written form at the jobsite — §1926.652(c)(2)(ii). - Trench width measured at the bottom is not greater than 15 feet (4.6 m) — §1926.650(b).
Confined spaces (Subpart AA) - Oxygen enriched = more than 23.5% oxygen by volume; oxygen deficient = less than 19.5% — §1926.1202. Both are hazardous atmospheres. - Testing order before entry under alternate procedures: oxygen, then flammable gases and vapors, then potential toxic air contaminants, with a calibrated direct-reading instrument — §1926.1203(e)(2)(iii). - If ventilation cannot bring flammable vapors below 10 percent of the LFL, entry is allowed only if the employer inerts the space so the atmosphere is non-combustible, provides PPE for other atmospheric hazards, and eliminates or isolates all physical hazards — §1926.1204(c)(4). - Subpart…
General Plant Construction
Key Concepts
Trenching, bedding, and the trench (DIPRA Ch. 2; Handbook Ch. 22) - Survey stake cuts are flow line of pipe — not trench bottom; the grade setter adds pipe thickness plus bedding depth (Handbook p. 395; repeated p. 408). - Trench bottom in soft subgrade is improved with crushed stone up to 2 inches in diameter, compacted to grade; bumping the pipe with the backhoe bucket to get grade is discouraged (§2.7, p. 22). - Rock: no closer than 6 inches to pipe bottom and sides for diameters up to 24 inches, no closer than 9 inches for 30 inches and larger; cushion of sand, crushed stone, or stone-free earth leveled and tamped (§2.10, p. 24). Loose cobbles more than 8 inches in diameter count as "rock" and are excluded from backfill (pp. 24–25). - Blasted rock trenches must be deeper and wider than in good soil; cover the trench with a weighted protective mat before ignition; licensed personnel only (§2.11, pp. 25–26). - Expansive clays can exert swell pressures as high as 17,500 psf (§2.14, p. 27). - Laying pipe backward (bell onto laid spigot) is not recommended because larger bell holes are generally required (§2.8, p. 23). - Unlocated gas services: an authorized gas company employee/agent must be on site; never repair gas service without gas-company supervision (§2.4, p. 20).
Concrete
Key Concepts
Consolidation and placing (Ch. 15) - Internal (spud) vibrators should be lowered vertically at regularly spaced intervals, penetrate to the bottom of the layer being placed and at least 150 mm (6 in.) into any previously placed layer; an insertion time of 5 to 15 seconds usually provides adequate consolidation (Ch. 15 — Internal Vibration, p. 327). - External (form) vibration duration is generally between 1 minute and 2 minutes — longer than internal vibration (Ch. 15, p. 328). - Vibratory screeds consolidate slabs up to 250 mm (10 in.) thick, provided slabs are unreinforced or only lightly reinforced (welded-wire fabric); internal vibration or a combination is recommended for reinforced slabs (Ch. 15 — External Vibration, p. 328). - Layers should be about 150 mm to 500 mm (6 in. to 20 in.) deep for reinforced members and 375 mm to 500 mm (15 in. to 20 in.) for mass work with large aggregates (Ch. 15, Depositing Concrete, p. 318). - Cold weather: concrete must not be placed on frozen subgrade; snow, ice, debris removed from forms; hold the temperature differential between supporting materials and concrete to less than 20°F (11°C) (Ch. 15 — Subgrade Preparation, p. 314).
Concrete - Reinforcing Steel
Key Concepts
Purpose of reinforcing steel. Concrete is strong in compression but relatively weak in tension and shear; wherever tension is present the concrete is reinforced with steel (Ch. 6, General). The adhesion of concrete to the bar surface plus the resistance of the deformations keeps bars from slipping and makes the two materials act as one — this gripping is known as bond (Ch. 3, Definitions). Longitudinal steel goes near the bottom of simple beams, in the bottom between supports and the top over supports of continuous beams, and in the top of cantilevers (Ch. 6). Stirrups resist diagonal tension and are spaced more closely near supports (Ch. 6, Fig. 6-8). Column ties and spirals restrain vertical bars from buckling (Fig. 6-15). T & S steel resists temperature and shrinkage stresses (Ch. 6).
Concrete basics. One part cement, about 1-1/2 to 2-1/2 parts fine aggregate, about 3 to 5 parts coarse aggregate, and clean water; strengths from about 3,000 to 10,000 psi and higher; full rated strength usually in 28 days (Ch. 3). High-early-strength cement reaches about the same strength in about one-half or one-third the time of ordinary cement (Ch. 3). Compressive strength is verified with standard test cylinders 6 in. diameter × 12 in. high, cured 7 to 28 days (Ch. 6, Fig. 6-1).
Excavating and Grading
Key Concepts
SC 811 locate requirements - A normal locate request gives locators 3 full working days to mark, not counting the day submitted, weekends or holidays; the life of the request begins the day after the request at 12:00 a.m. (Excavator Manual 2026, p. 9). - A normal notice expires within 15 working days after the date of notice; no excavation may continue after that without a subsequent notice (Section 58-36-60(B); pp. 9, 16). - Before digging the excavator must check Positive Response, confirm all locates complete and verify no visible signs of unmarked facilities (p. 9). Closed Codes mean marked or no facilities; Open Codes mean the locate was not completed and work cannot begin (p. 23). - No Show: if an operator fails to respond (or responds "No Conflict") but indicators of a facility are present, contact SC811 and allow three hours for marking (Section 58-36-60(E)(6); pp. 18, 23). - Resend: used when an operator posted "Marked" but no marks are visible or marks are unclear/incomplete; directed to that specific operator (pp. 18, 19). Remark: marks were placed but destroyed, faded or disturbed; operators have three full working days to respond. Extension: work exceeds the original 15 full working days — it does not refresh paint markings (pp. 16, 17). - Code 110 – Extraordinary Circumstances (hurricanes, floods, ice, acts of God): do not excavate until after the date…
Miscellaneous Engineering - Design Elevations
Excavation and Grading Handbook
Key Concepts
Road survey stakes (Chapter 1, Pages 9–18) - RS = reference stake; RP = reference point and is treated exactly the same. The RS is set where the projected slope catches original ground (catch point). - On a stake, the number above the diagonal line is the elevation (cut or fill); the number below is the distance (Page 9). - A double horizontal line means "and then": everything below it is measured from the RS/RP point. If a single line is used instead, all measurements and elevations are taken from the surveyor's hub beside the information stake (Page 9). If a double line follows each grade, each cut becomes the reference for the next, and you should set a hub at each point (Page 11). - Back of the stake: station number, and below it the distance from the surveyor's hub to road centerline (example: 5 ft hub-to-RS + 49 ft RS-to-centerline = 54 ft) (Pages 10–11). - Side of the stake: percentage of slope (centerline to HP), the slope ratio, and EL — the elevation above sea level of the hub, from which surveyors computed all cuts and fills (Page 15). - Stake grades are finished grades; the grade setter adds the road section thickness to get subgrade (Pages 10, 12). - Circled number = offset where the first cut starts (circled 2 = first…