California · PSI

California C-43 Sheet Metal Contractor Exam Practice Exam

115 questions 210 minutes 4 topics 1:49 per question Closed book 504 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$9.95

Complete exam simulation matching the real PSI test format.

  • 115 questions
  • 210 minute time limit
  • 4 topic areas covered
  • 504 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 4 topic quizzes and this full exam, plus the Law and Business Exam. $59.95/month.
See the study course

California C-43 Sheet Metal Contractor Practice Exam Guide

Built from the official PSI exam bulletin. View the bulletin

What's on the exam

Approximate share of the exam, by topic
Installation34%
Fabrication23%
Safety22%
Planning and Estimating21%

This practice exam is built around the official content outline for the California C-43 Sheet Metal Contractor exam: Planning and Estimating, Fabrication, Installation, Safety.

There are two ways to practice. The free practice exam gives you 10 questions per attempt, and you can take it as many times as you like. The full practice exam gives you 115 questions on a 210 minutes clock, with a new draw from our question bank each time.

4 topics

Planning and Estimating — about 21% of the exam

Our study plan for this topic: Reviewing project plans; Evaluating job sites; Designing sheet metal projects; Calculating costs; Rainfall intensity data and drainage factor tables; Downspout and scupper sizing calculations; Gutter sizing methods and expansion allowances; Metal material selection and thickness/weight specifications for sheet metal.

Fabrication — about 23% of the exam

Our study plan for this topic: Layout and pattern production; Processing sheet metal; Welding, soldering, and mechanical assembly; Rectangular duct gauge selection and pressure classification; Round and flat oval duct gauge and seam type selection; Duct reinforcement types, spacing, and rigidity classification; Transverse joints and longitudinal seams for rectangular duct; Tie rod and midpanel tie rod applications for duct construction.

Installation — about 34% of the exam

The outline lists: Preparing for installation; Gutters, downspouts, and drainage; Flashings; Hoods and exhaust; Metal roofs, siding, and paneling; Specialty and miscellaneous items; Duct sealing, pressure classification, and leakage testing; Duct hangers, supports, and hanger spacing requirements.

Safety — about 22% of the exam

Our study plan for this topic: Personal safety; Shop and job site safety; Hoisting and rigging operations; Injury and illness prevention program (IIPP) requirements; Fall protection systems and requirements; Scaffolding erection, use, and inspection; Ladder selection, inspection, and safe use; Fire protection, prevention, and flammable/combustible liquid storage.

3 questions

Sample 1 — Installation

Question: You are laying out the exhaust duct for a Type 1 (domestic) clothes dryer in a condominium. The dryer manufacturer's instructions give no length allowance, and the routing you have drawn requires four 90 degree elbows. What is the maximum total combined horizontal and vertical duct length permitted for this installation?

  • A. 12 feet
  • B. 14 feet
  • C. 6 feet
  • D. 10 feet

Correct Answer: D

Domestic dryer moisture exhaust ducts are limited to a total combined horizontal and vertical length of 14 feet, including two 90 degree elbows, and 2 feet must be deducted for each 90 degree elbow in excess of two. Four elbows means two extra elbows: 14 ft - (2 x 2 ft) = 10 feet.

Reference: California Mechanical Code 2025, Section 504.4.2.1

Sample 2 — Fabrication

Question: As the contractor you are fabricating a companion flange transverse joint (RT-2A) for a 24 in. diameter round duct. What is the minimum flange size for this connection?

  • A. 1-1/2 in. x 1-1/2 in. x 10 ga
  • B. 1 in. x 1 in. x 1/8 in.
  • C. 1-1/2 in. x 1-1/2 in. x 1/8 in.
  • D. 1 in. x 1 in. x 10 ga

Correct Answer: C

The RT-2A companion flange joint requires a minimum flange of 1 in. x 1 in. x 10 ga on duct up to 14 in. in diameter, and 1-1/2 in. x 1-1/2 in. x 1/8 in. on duct over 14 in. in diameter. A 24 in. duct falls in the larger category.

Reference: SMACNA HVAC Duct Construction Standards (4th ed.), Figure 3-1 Round Duct Transverse Joints, RT-2A

Sample 3 — Safety

Question: You are the sheet metal contractor on a new office tower designed to be 80 feet in height when completed, so a construction passenger elevator for hoisting workers is required. At what point in the construction must that elevator be installed and operational?

  • A. When the structure reaches 24 feet in height
  • B. When the structure reaches 60 feet in height
  • C. When the structure reaches 36 feet in height
  • D. When the structure reaches 48 feet in height

Correct Answer: C

CSO §1630(a) requires a construction passenger elevator on any building designed to be 60 feet or more above (or 48 feet or more below) ground level when completed, and requires that elevator to be installed and operational when the building or structure reaches 36 feet in height. The 60-foot and 48-foot figures are the triggers for requiring the elevator, not for placing it in service.

Reference: Cal/OSHA Title 8 Construction Safety Orders, §1630(a)

Your first score is just a starting point. After every attempt, the results page shows how you did on each outline topic, so you can see what to work on next. Keep at it until you pass consistently.

  • Start with the questions you know. Go through the whole exam once and bookmark anything you're unsure about. Our practice exams let you bookmark and come back.
  • Circle back to your bookmarks on the second pass.
  • Turn every miss into a lesson. After each attempt, look up each missed question's reference in your book and read the section.

Questions Not published by the board
Time limit 210 minutes
Passing score Not published by the board
Books in the exam room Closed book (no books in the room)
Exam fee $51.43
  • You are given a printed score report at the check-in location at the end of the examination, and a failing report shows the overall score including the number of items answered correctly.
  • You must wait 21 calendar days after each attempt to retest, may test as often as needed within your eligibility period, and must pay a fee for each attempt.

Source: Contractors State License Board Licensing Examination Information Guide – Sheet Metal (C-43). Check the bulletin before test day: fees and rules can change.

Reference books

5 books on the bulletin
As an Amazon Associate we earn from qualifying purchases.
10 free questions30 min · no account