California C-39 Roofing Contractor Exam Study Guide
This guide covers what you need for the California C-39 Roofing Contractor exam: the key facts from the official bulletin, the topics it tests, the reference books, sample questions with answers, and a plan to prepare. PSI gives the exam.
California C-39 Roofing Contractor Exam at a Glance
Here are the exam's key facts from the official bulletin:
| Questions | Not published by the board |
| Time limit | 210 minutes |
| Passing score | Not published by the board |
| Books in the exam room | Closed book (no books in the room) |
| Exam fee | $51.43 |
On exam day
- The exam is multiple choice with four answer choices per question and one BEST answer, and there is no penalty for guessing.
- One valid, non-expired government-issued photo ID from the listed types is required, and the name must match the application.
- Candidates must arrive at least 30 minutes before the scheduled appointment time.
- No reference books, notes or printed materials may be in your possession during the examination other than the materials provided.
- A calculator is provided for the examination, and candidates may not bring their own calculators into the testing room.
- Timing devices are provided on screen and in the room, and a long list of personal items (including phones, calculators, notes, textbooks, food and drinks) is barred from the testing room.
Study references listed in the bulletin (not allowed in the exam room)
- 2022 California Building Code. California Code of Regulations, Title 24
- 2022 California Energy Code. California Code of Regulations, Title 24
- 2022 California Residential Code. California Code of Regulations, Title 24
- Concrete and Clay Tile Installation Manual
- NRCA Roofing Manual: Architectural Metal Flashing and Condensation and Air Leakage Control (2022)
- NRCA Roofing Manual: Steep-Slope Roof Systems (2021)
- NRCA Roofing Manual: Metal Panel and SPF Roof Systems (2020)
- NRCA Roofing Manual: Membrane Roof Systems (2019)
- State of California General Industry & Electrical Safety Orders (Cal/OSHA) and State of California Construction & Electrical Safety Orders (Cal/OSHA). California Code of Regulations, Title 8 (2022)
Scheduling, changes and retakes
- Candidates schedule the examination themselves through PSI, either online at https://test-takers.psiexams.com/cacon or by telephone at (877) 392-6422.
- The Board must approve you for examination before you schedule, and your eligibility lasts 18 months from the date you were deemed eligible.
- You may cancel or reschedule without losing your fee only if PSI receives notice two days before the exam date, by website or by speaking with a PSI representative.
- Missing the appointment, arriving after the examination start time, failing to cancel two days ahead, or not presenting proper identification causes forfeiture of the examination fee.
- You receive a printed score report at the test center when you finish, showing your overall score including the number of items answered correctly.
- A failed candidate may retest after 21 calendar days, as often as needed within the 18-month eligibility period, paying a fee to PSI for each attempt.
- Passing candidates receive further instructions by mail from CSLB, since the score report is not a license.
Source: Contractors State License Board Licensing Examination Information Guide – Roofing (C-39). Check the bulletin before test day: fees and rules can change.
What the California C-39 Roofing Contractor Exam Covers
The official content outline has 5 topics:
| Topic | Share of the exam |
|---|---|
| Planning and Estimating | 22% |
| Job Site Preparation for Roof Projects | 13% |
| Low-Slope Roof Projects | 17% |
| Steep-Slope Roof Projects | 26% |
| Safety | 22% |
How to Prepare for the California C-39 Roofing Contractor Exam
This is a closed-book exam, so what you know walking in is what you have. Study the topics in the outline.
Take timed practice exams.
Review every miss. Read the explanation and the reference behind each question you get wrong until the rule sticks.
Aim to pass more than once. One passing score can be luck. Several in a row means you're ready.
Reference Books for the California C-39 Roofing Contractor Exam
CSLB lists these codes and manuals as study resources, with the 2022 California codes; the exam is closed book, so none may be brought into the testing room.
On Test Day
- Go through the whole exam first. Answer every question you know and bookmark the ones you don't. Every exam lets you come back to bookmarked questions, but some lock the questions you've seen once you take a break, so work your bookmarks before any break.
- Then go back to your bookmarks and work them out.
- Before you finish, answer anything you skipped. A blank can't earn a point.
Study Tips
Reading the material cover to cover usually isn't enough to pass. This is a multiple-choice exam, and multiple choice rewards practice — the more questions you work through under real conditions, the more the terminology and question style become second nature.
Read the explanation for every question — right or wrong. Understanding the underlying rule lets you answer reworded questions you've never seen, instead of memorizing specific answers.
Several 25–30 minute sessions across the week beat one long cram. Spaced repetition moves facts into long-term memory so they stick through exam day.
Practicing against a ticking clock is the best way to beat exam-clock anxiety. Use these timed tests to build your pacing, so you learn to move steadily and never burn too long on a single question. By test day, the format feels routine.
Sample California C-39 Roofing Contractor Practice Questions
These questions come from our practice question bank, each with its answer and reference.
Sample 1 — Low-Slope Roof Projects
Question: As the C-39 contractor on a thermoplastic membrane roof, you encounter a cluster of irregularly shaped support legs that cannot be sealed with prefabricated flashings, metal sleeves or a curb, so penetration pockets are used as a last alternative. What is the recommended top fill material for these pockets?
- A. Hot steep asphalt
- B. Pourable sealer
- C. Asphalt-based plastic roof cement
- D. Polymer-modified bitumen roofing cement
Correct Answer: B
Pourable sealer is the recommended top fill material for penetration pockets. Polymer-modified bitumen roofing cement may be acceptable as a top fill only in bituminous (BUR/polymer-modified bitumen) roof systems, not a thermoplastic membrane system. Prefabricated flashings, metal sleeves and curbs with pre-molded pipe flashings are preferred; pockets are an acceptable last alternative.
Reference: NRCA Roofing Manual: Membrane Roof Systems (2023), Chapter 10—Construction Details, Penetrations and Clearance
Sample 2 — Job Site Preparation for Roof Projects
Question: As a C-39 contractor you inspect a newly erected cementitious wood fiber panel deck and find a joint where adjacent panels differ in elevation by about 3⁄16 of an inch — more than the maximum acceptable difference. Before the roof system is applied, the uneven joint should be grouted with the grout feathered to a slope of:
- A. 1⁄16 of an inch per foot
- B. ½ of an inch per foot
- C. ¼ of an inch per foot
- D. ⅛ of an inch per foot
Correct Answer: D
Elevation differences exceeding ⅛ of an inch between adjacent cementitious wood fiber panels are unacceptable. Uneven joints of ⅛ of an inch or more should be grouted, with the grout feathered to a slope of ⅛ of an inch per foot to provide a uniform substrate.
Reference: NRCA Roofing Manual: Membrane Roof Systems (2023), Section 2.2—Cementitious Wood Fiber Panels, Vertical Alignment
Sample 3 — Steep-Slope Roof Projects
Question: You are replacing a broken interlocking tile with projecting anchor lugs on a roof that was originally installed direct to deck, so there is no horizontal wood strip for the replacement tile's lugs to hang on. After removing the broken pieces, cutting the old fastener and patching the underlayment, what does the tile repair guidance call for nailing to the deck to support the new tile?
- A. An 18-inch by 6-inch by 3/4-inch plywood piece
- B. A 12-inch by 6-inch by 1/2-inch plywood piece
- C. An 8-inch by 4-inch by 1/4-inch hardboard shim
- D. A 24-inch-long nominal 1-by-2 wood strip
Correct Answer: B
For broken tile replacement where no battens were used in the original installation, the manual specifies that a 12-inch by 6-inch by 1/2-inch plywood piece be nailed to the deck to act as a batten so the replacement tile's anchor lugs have bearing. The other sizes and a full nominal 1-by-2 strip are not the specified repair component.
Reference: Concrete & Clay Roof Tile Installation Manual, Installation—General Information (Broken Tile Replacement); see also MC-24
Sample 4 — Planning and Estimating
Question: A re-roof has two different slopes. After sectioning the plan, the 6 in 12 portion has a plan area of 4,608 SF (slope factor 1.118) and the 4 in 12 portion has a plan area of 960 SF (slope factor 1.054). What is the total net roof area?
- A. 5,568 SF
- B. 6,113 SF
- C. 6,225 SF
- D. 6,164 SF
Correct Answer: D
When slope changes from one section to another, each slope requires a separate take-off. 4,608 SF x 1.118 = 5,152 SF; 960 SF x 1.054 = 1,012 SF; total net area = 6,164 SF. Option A is the plan (flat) area; option C results from incorrectly applying the 1.118 factor to the entire plan area.
Reference: Roofing Construction and Estimating, Chapter 1, Calculating Total Net Roof Area (Example 1-13)
Why Practice Online Instead of With a PDF
A PDF shows you questions. It doesn't show you the clock. Our practice exams are timed and on a screen, so you practice finding answers under time pressure, not just reading them. Each attempt draws a new set of questions from our bank, and your results break the score down by outline topic so you know what to study next.
Start Practicing
Take the free California C-39 Roofing Contractor practice exam to see where you stand, then work through the topics that need attention. For the official rules, read the exam bulletin, and see the licensing board's website.