California C-39 Roofing Contractor Practice Exam Guide
What's on the exam
Approximate share of the exam, by topicThis practice exam follows the official content outline for the California C-39 Roofing Contractor exam: Planning and Estimating, Job Site Preparation for Roof Projects, Low-Slope Roof Projects, Steep-Slope Roof Projects, Safety.
You have two ways to practice. The free practice exam gives you 10 questions per attempt, and you can retake it as often as you like. The full practice exam gives you 115 questions on a 210 minutes clock, with a new draw from our question bank every attempt.
Planning and Estimating — about 22% of the exam
Our study plan for this topic: Planning roof projects; Estimating roof projects; Measuring and calculating roof area (level and sloped surfaces, slope factor, net vs. gross area); Estimating material quantities by roof type (shingles, tile, membrane, metal panels, slate, wood shake); Labor unit pricing and production rate calculations; Structural and design load considerations (dead loads, live loads, wind uplift, snow loads, seismic); Building code compliance requirements for roof assemblies (CBC, CRC, fire classification, wind resistance testing); California Energy Code requirements affecting roof assemblies (solar reflectance, thermal emittance, insulation R-values).
Job Site Preparation for Roof Projects — about 13% of the exam
Our study plan for this topic: Protecting surroundings; Correcting problems; Tearing off existing roofing; Pre-job roof system evaluation and documentation review; Roof deck inspection and assessment of surface condition; Identifying and managing asbestos-containing roofing materials (Cal/OSHA requirements); Identifying hidden conditions (buried conduit, piping) in roof assemblies; Roof deck types and substrate suitability for new roof systems.
Low-Slope Roof Projects — about 17% of the exam
Our study plan for this topic: Installing flashings, ventilation, and underlayment; Installing various low-slope roof systems; Repairing low-slope roof systems; Rigid board insulation types, R-values, and thermal performance requirements; Air and vapor retarders in low-slope roof assemblies; Roof slope, drainage design, and ponding water criteria; Membrane surfacings including aggregate, coatings, and cool roof requirements; Roof accessories including equipment curbs, expansion joints, and penetration clearances.
Steep-Slope Roof Projects — about 26% of the exam
Our study plan for this topic: Installing flashings, ventilation, and underlayment; Installing various steep-slope roof systems; Repairing steep-slope roof systems; Minimum slope requirements for each steep-slope roofing material; Fasteners, nailing patterns, and attachment methods for steep-slope coverings; Fire classification requirements for roof coverings under CBC/CRC (Class A, B, C); Wind resistance and uplift requirements for steep-slope roof coverings; Condensation control, attic ventilation, and vapor retarder requirements for steep-slope assemblies.
Safety — about 22% of the exam
Our study plan for this topic: Personnel safety; Job site safety; Fall protection; Injury and Illness Prevention Program (IIPP) requirements; Scaffolding requirements and safe use; Ladder selection, inspection, and safe use; Personal protective equipment (PPE) selection and use; Hazard communication and Safety Data Sheets (SDS).
Sample 1 — Steep-Slope Roof Projects
Question: You are building the eave on a metal shingle roof using NRCA's preferred detail (MS-3) for an eave with water and ice-dam protection membrane. A self-adhering stripping ply is applied directly to the deck at the eave and turned down the fascia. In this preferred sequence, the drip edge metal is installed:
- A. Under both the stripping ply and the membrane
- B. Over both the stripping ply and the membrane
- C. Over the stripping ply, under the membrane
- D. Under the stripping ply, over the membrane
Correct Answer: C
In the preferred MS-3 eave detail, the self-adhering stripping ply goes directly on the deck and turns down the fascia a minimum of 1 inch, the drip edge metal is applied over that stripping ply, and the water and ice-dam protection membrane is then applied over the flange of the drip edge metal.
Reference: NRCA Roofing Manual: Steep-slope Roof Systems (2025), Metal Shingle Roof Systems, Chapter 7—Construction Details, Introduction and Detail MS-3
Sample 2 — Planning and Estimating
Question: A roof assembly you are bidding includes foam plastic insulation installed under the roof covering, and the designer wants to omit the thermal barrier otherwise required on the interior side. The exemption applies where the foam plastic is separated from the building interior by tongue-and-groove wood planks or by wood structural panel sheathing bonded with exterior glue, identified as Exposure 1, with edges supported by blocking or tongue-and-groove joints. The minimum sheathing thickness for this exemption is:
- A. 15/32 inch
- B. 7/16 inch
- C. 19/32 inch
- D. 3/8 inch
Correct Answer: A
Section R316.5.2 states the thermal barrier of Section R316.4 is not required where foam plastic in a roof assembly or under a roof covering is separated from the interior by tongue-and-groove wood planks or wood structural panel sheathing not less than 15/32 inch thick, bonded with exterior glue, identified as Exposure 1, with edges supported by blocking or tongue-and-groove joints. The other thicknesses are common sheathing sizes but do not satisfy this provision.
Reference: California Residential Code 2022, Section R316.5.2
Sample 3 — Safety
Question: A roofer on your crew pours solvent-based primer from a properly labeled drum into a smaller portable container to carry onto the roof. Under the workplace labeling rules, the portable container need not be labeled if which condition is met?
- A. The container is emptied before the shift ends
- B. The container holds one gallon or less
- C. Only the employee who transferred it uses it
- D. The data sheet is posted in the work area
Correct Answer: C
Section 5194(f)(8) exempts portable containers into which hazardous chemicals are transferred from labeled containers and which are intended only for the immediate use of the employee who performs the transfer. 'Immediate use' means the chemical is under the control of and used only by that person, and only within the work shift in which it is transferred. Container size and posting a data sheet do not create the exemption.
Reference: Cal/OSHA Title 8 General Industry and Electrical Safety Orders, §5194(f)(8)
Treat your first attempt as a checkup, not a verdict. After every attempt, the results page breaks your score down by outline topic, so you can see which topics need work. Keep practicing until you pass consistently.
- Answer what you know first. Go through every question once, answer the ones you know, and bookmark the rest. Our practice exams let you bookmark and come back.
- Come back to your bookmarks. Work them out on your second pass.
- Look up every miss. After each attempt, find each missed question's reference in your book and read the section.
| Questions | Not published by the board |
| Time limit | 210 minutes |
| Passing score | Not published by the board |
| Books in the exam room | Closed book (no books in the room) |
| Exam fee | $51.43 |
- You receive a printed score report at the test center when you finish, showing your overall score including the number of items answered correctly.
- A failed candidate may retest after 21 calendar days, as often as needed within the 18-month eligibility period, paying a fee to PSI for each attempt.
Source: Contractors State License Board Licensing Examination Information Guide – Roofing (C-39). Check the bulletin before test day: fees and rules can change.