ICC F24 Master Plumber (2015 IPC) Exam Study Guide
This guide covers what you need for the ICC F24 Master Plumber (2015 IPC) exam: the key facts from the official bulletin, the topics it tests, the reference books, sample questions with answers, and a plan to prepare. Pearson VUE gives the exam.
ICC F24 Master Plumber (2015 IPC) Exam at a Glance
Here are the exam's key facts from the official bulletin:
| Questions | 100 questions |
| Time limit | 4 hours |
| Passing score | 70% correct |
| Books in the exam room | Open book |
| Exam fee | $120 |
On exam day
- The exam consists of multiple-choice questions.
- You may bring copyrighted, bound books to the test administration, including those specifically listed as approved references. However, training materials such as presentations, study guides, or practice questions are not permitted. All exam questions are based solely on the approved reference list, and only those references may be used as the basis for appealing exam questions.
References you may bring
- 2015 International Plumbing Code®
Scheduling, changes and retakes
- Exams are scheduled through PearsonVUE at www.pearsonvue.com/ICC, where candidates can create an account, schedule an exam, locate a test center, purchase vouchers and request accommodations.
- Results for examinations taken electronically are available immediately after the examination is completed.
- You must wait 10 days before retaking a failed exam.
- After passing, contact the jurisdiction in which you wish to be licensed for any other requirements, because ICC is not a licensing agency.
Source: National Contractor/Trades Examination Information Bulletin, PUBLISHED June 30, 2026; ICC Exam Catalog, checked October 6, 2026. Check the bulletin before test day: fees and rules can change.
What the ICC F24 Master Plumber (2015 IPC) Exam Covers
The official content outline has 7 topics:
| Topic | Questions | Share of the exam |
|---|---|---|
| Administration General Regulations | 46 | 46% |
| Plumbing Fixtures | 14 | 14% |
| Water Supply and Distribution | 11 | 11% |
| Sanitary Drainage | 11 | 11% |
| Plumbing Vent Requirements | 8 | 8% |
| Traps, Interceptors, and Separators | 8 | 8% |
| Storm Drainage | 2 | 2% |
How to Prepare for the ICC F24 Master Plumber (2015 IPC) Exam
Start with the books. This is an open-book exam, so the references on the bulletin's list are your main study tool. Get the editions the bulletin names.
Learn where things are. Read the table of contents and the index of each book until you know where every major subject lives. On test day, finding an answer fast matters more than memorizing it.
Highlight the sections you use most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
Spend most of your time on the biggest topics. Administration General Regulations and Plumbing Fixtures make up 60% of the exam.
Take timed practice exams. The clock trains you to find answers at the pace the real exam needs: about 2 minutes 24 seconds per question.
Aim to pass more than once. One passing score can be luck. Several in a row means you're ready.
Reference Books for the ICC F24 Master Plumber (2015 IPC) Exam
The listed reference for this exam is the 2015 International Plumbing Code®.
Where to get them:
On Test Day
- Go through the whole exam first. Answer every question you know and bookmark the ones you don't. Every exam lets you come back to bookmarked questions, but some lock the questions you've seen once you take a break, so work your bookmarks before any break.
- Then go back to your bookmarks and work them out.
- Don't let one question eat your time. You have 4 hours for 100 questions, which is about 2 minutes 24 seconds per question.
- Before you finish, answer anything you skipped. A blank can't earn a point.
Study Tips
Know your way around each book's index and table of contents. Open-book exams reward speed: you need to find specific items quickly.
Take this practice exam several times. The goal is to consistently clear your exam's passing score — often around 70–75% — so passing feels routine before you walk into the real test.
Only select answers that directly respond to the question asked—not ones that merely sound correct or seem true. After choosing, verify your answer against the question to confirm you didn't misread it and that your selection genuinely addresses what was asked.
Our practice exam is specifically designed to mimic the testing conditions at all exam centers. While untimed PDF study guides might help with studying, they don’t prepare you for the challenge of managing your time during an actual test.
Be alert to hedging words like likely, may, can, sometimes, usually, generally, and rarely—question writers use them to account for exceptions. An answer choice is often wrong simply because it allows no exceptions. Similarly, avoid choices containing absolute terms like exactly and always.
Sample ICC F24 Master Plumber (2015 IPC) Practice Questions
These questions come from our practice question bank, each with its answer and reference.
Sample 1 — Sanitary Drainage
Question: You are installing the required cleanout on a 6-inch horizontal drainage pipe inside a commercial building. What is the minimum required size of that cleanout?
- A. 5 inches
- B. 4 inches
- C. 3 inches
- D. 6 inches
Correct Answer: B
IPC 2015, Section 708.1.5 requires cleanouts to be the same size as the piping served, except that cleanouts for piping larger than 4 inches (102 mm) need not be larger than 4 inches.
Reference: IPC 2015 Section 708.1.5
Sample 2 — Plumbing Vent Requirements
Question: A pneumatic sewage ejector serves a basement restroom group in a commercial building. The air pressure relief pipe from the ejector is run to an independent vent stack that terminates as required for vent extensions through the roof. After sizing the relief pipe to relieve air pressure inside the ejector to atmospheric pressure, what is the smallest size the relief pipe may be?
- A. 1 1/4 inches
- B. 2 inches
- C. 3 inches
- D. 1 1/2 inches
Correct Answer: A
Per IPC 2015 Section 906.5.2, the air pressure relief pipe from a pneumatic sewage ejector must connect to an independent vent stack terminating as required for vent extensions through the roof, and shall be sized to relieve air pressure inside the ejector to atmospheric pressure but in no case less than 1 1/4 inches (32 mm).
Reference: IPC 2015 Section 906.5.2
Sample 3 — Traps, Interceptors, and Separators
Question: In addition to the requirements governing traps, interceptors and separators themselves, the materials and methods used for their construction and installation must comply with the applicable provisions of which chapters of the code?
- A. Chapters 5 and 7
- B. Chapters 6 and 9
- C. Chapters 3 and 6
- D. Chapters 4 and 7
Correct Answer: D
IPC 2015, Section 1004.1 states that the materials and methods utilized for the construction and installation of traps, interceptors and separators shall comply with Chapter 10 and the applicable provisions of Chapters 4 (Fixtures, Fittings and Fixture Fittings) and 7 (Sanitary Drainage). That section also prohibits fittings with ledges, shoulders or reductions capable of retarding or obstructing flow.
Reference: IPC 2015 Section 1004.1
Sample 4 — Storm Drainage
Question: You are sizing the conductors and horizontal storm drain for a one-story building with a flat roof having a projected area of 4,000 square feet. An adjoining multi-story vertical wall with 2,400 square feet of surface diverts rainwater onto that roof. What total area must be used in calculating the required pipe sizes?
- A. 4,800 square feet
- B. 6,400 square feet
- C. 4,000 square feet
- D. 5,200 square feet
Correct Answer: D
Per IPC 2015, Section 1106.4, one-half of the area of any vertical wall that diverts rainwater to the roof is added to the projected roof area. One-half of 2,400 sq ft is 1,200 sq ft; 4,000 + 1,200 = 5,200 square feet used for sizing the vertical conductors, leaders and horizontal storm drainage piping.
Reference: IPC 2015 Section 1106.4
Why Practice Online Instead of With a PDF
A PDF shows you questions. It doesn't show you the clock. Our practice exams are timed and on a screen, so you practice finding answers under time pressure, not just reading them. Each attempt draws a new set of questions from our bank, and your results break the score down by outline topic so you know what to study next.
Start Practicing
Take the free ICC F24 Master Plumber (2015 IPC) practice exam to see where you stand, then work through the topics that need attention. For the official rules, read the exam bulletin, and see the licensing board's website.